Procurement Plan 2015
Power Plant Projects
2014

2015

2016

2017

Project and Capacity
6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12

PLTGU Grati,  450 MW

450

PLTU Lontar Ekpansi, 1 x 315 MW

315

PLTG/MG Riau Peaker, 200 MW

200

PLTU Asam‐ Asam Unit # 5 & # 6, 200 
MW
PLTU Lombok ‐ FTP2, 2 x 50MW

200

PLTGU Muara Karang Peaking,  450 
MW
PLTU SULSEL BARRU 2, 100 MW

450

PLTU PALU 2, 2 x 50 MW

100

PLTG/MG Jambi Peaker, 100 MW

100

PLTG/MG Lombok Peaker ‐ Combine 
Cycle, 90 + 60MW
PLTG/MG Lampung Peaker ‐
Combined Cycle, 200 MW

150

100

100

200

PLTGU : Combined Cycle Power Plant

Prequalification

PLTU : Coal Fired Power Plant

Tenderin
g
Construction

PLTG/MG Gas Fired/Gas Engine Power Plant

Lontar Extension Power Project
Location

• Banten Province, Java 

Capacity

• 315 MW plus up to 10%

Technology

• Sub or Super Critical Boiler provided by Local Boiler  Manufacturer ( 2 pre‐selected boiler manufacturers)

Fuel

• Coal

Finance

• Export Credit Agency (ECA) and PLN Budget

Est. Project Cost

• USD eq. 600 Million

Procurement

• Open Tender with Prequalification

Award Criteria

• Lowest Generating Cost (LEGC)

Asam Asam Coal Fired Power Project 
Location

• South Kalimantan Province, Kalimantan 

Capacity

• 2 units of 100 MW plus up to 10%

Technology

• CFB Boiler provided by pre‐selected Local Boiler  Manufacturer

Fuel

• Coal

Finance

• Export Credit Agency (ECA) and PLN Budget

Est. Project Cost

• USD eq. 360 Million

Procurement

• Open Tender with Prequalification

Award Criteria

• Lowest Generating Cost (LEGC)

Riau Peaker Power Project
Location

• Dumai, Riau Provience, Sumatera

Capacity

• 315 MW plus up to 10%

Technology

• Gas Turbine or Gas Engine, operated as peaker

Fuel

• Dual Fuel – Gas and HSD

Finance

• Export Credit Agency (ECA) and PLN Budget

Est. Project Cost

• USD eq. 200 Million

Procurement

• Open Tender with Prequalification

Award Criteria

• Lowest Generating Cost (LEGC)

Procurement of EPC Contract
Improvement of Local Manufacturer 
EPC Contract
Single point of 
responsibility
Performance 
Based Contract

medium‐long term 
supply agreement
provide Guarantee 
and services
price quotation

PLN

Pre‐selected 
Vendors

EPC 
Contractor

Sub 
Contractor

unit price basis
• Pilling works
• Cut & fill
• etc 

Service 
Provider

Vendors

Designer

high value/ 
high risk 
equipments
Local 
Product/higher 
local content

Become Vendors Opportunity 
Merah Putih Coal Fired Power Projects
Location

• Scattered all over Indonesia

Capacity

• Small Scale of 7 MW, 10 MW, 15 MW

Technology

• Stocker boiler, most of the equipment provided by  pre‐selected local/Indonesian manufacturer

Fuel

• Coal

Finance

• PLN Budget

Est. Project Cost

• USD eq. 32 Million up to USD eq.70 Million 

Procurement

• Limited Tender or Direct Negotiation

Award Criteria

• Lowest Generating Cost (LEGC)