Preview

Iocl Projects

Powerful Essays
Open Document
Open Document
1095 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Iocl Projects
6/10/13

IndianOil Major Projects IndianOil continues to lay emphasis on infrastructure development. Towards this end, a number of schemes have been initiated with increasing emphasis on project execution in compressed schedules as per world benchmarking standards. Schemes for improvement and increased profitability through debottlenecking / modifications / introduction of value added products are being taken up in addition to grassroots facilities. Project systems have been streamlined in line with ISO standards.

INTEGRATED CRUDE OIL HANDLING FACILITIES AT PARADIP
Project Cost: Rs. 1492.33 crore Expected Com m issioning: Both the SPMs have been commissioned with receipt of crude oil in onshore tanks on

31.12.2012 and 22.1.2013. Completion of onshore activities anticipated by March 2013.
Benefit: The proposed facilities would enhance crude handling capacity at Paradip port. Brief Description: The proposal is for installation of 2nd SPM for Paradip Refinery and 3rd SPM & sub-sea crude oil

transfer pipeline with associated facilities as a part of Integrated Offshore Crude Handling Facilities at Paradip.

CONSTRUCTION OF TANKS AND BLENDING FACILITY AT VADINAR (5 X 85000 KL)
Project Cost: Rs. 267.00 crore Expected Com m issioning: Project is mechanically completed and integrated with existing system. However,

commissioning will be taken up after completion of rim seal fire protection works, progressively from March 2013 onwards.
Benefit: The proposed scheme would ensure the reduction in demurrage being paid at Vadinar crude oil receipt

terminal.
Brief Description: Project consists of construction 5 tanks of 85000 KL capacity each to store HS-Heavy crude oil along

with crude oil mixing facility at Vadinar.

STYRENE BUTADIENE RUBBER (SBR) AT PANIPAT
Project Cost: Rs. 890 crore Expected Com m issioning: 1st quarter 2013 Benefit: Value addition for naphtha / butadiene by forward integration with SBR. Brief Description: As part of integrating

You May Also Find These Documents Helpful

  • Powerful Essays

    PROJ 592

    • 2367 Words
    • 10 Pages

    If the current schedule is maintained, the project will be completed on 12/29/08 and the total cost is$4,644,920.00. Compare to initial budgeted cost the new cost is over budget by 195,000.00. Actual cost so far is $1265, 990.00 and the remaining cost is $3,378,930.00.…

    • 2367 Words
    • 10 Pages
    Powerful Essays
  • Powerful Essays

    | The contract has a set budget if $2,750,000 by the project sponsor. The estimated budget for the project is $2,750,000 with a timeline of 1 year and three months. Upon final completion of the project the extent will contain: 1. Manufacturing plant/building in Huntsville, AL 2. Installed equipment to effectively produce product 3. Recruiting division for managers, distribution, plant operators 4. Procured Equipment, Raw Material and Truck Fleet 5. Work and production permits…

    • 1358 Words
    • 6 Pages
    Powerful Essays
  • Powerful Essays

    Anagene In

    • 1220 Words
    • 9 Pages

    The current system doesn’t do well at estimating the cost. The estimated material and scrap cost, overhead cost depends…

    • 1220 Words
    • 9 Pages
    Powerful Essays
  • Good Essays

    Keystone XL

    • 1062 Words
    • 3 Pages

    With the proposed Canadian Keystone XL Pipeline in the midst of approval, Americans can look forward to the potential of job growth and less dependencies upon foreign imports. The project proposes a 1,179 mile, 36 inch-diameter crude oil pipe. Crude oil a petroleum product is a liquid composed of hydrocarbons, organic compounds and small amounts of metal. It is created through the heating and compression of organic materials, over a long time period. The pipeline would start in the town of Hardisty in Alberta, Canada and then would travel south to Houston and Nederland, Texas where it would be processed. There would be 329 miles of pipeline in Canada, and then another 850 miles in the U.S. The company developing the pipeline, TransCanda, has more than 50 years’ of experience. TransCanada has lead in the responsible development and reliable performance of North American energy infrastructure including natural gas, oil pipeline, power generation and gas storage. It is crucial to install the Keystone XL Pipeline because it reduces the amount of imported oil, and creates the potential for high paying American jobs.…

    • 1062 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    In this document ACC 561 Assignment Week 4 Costing Methods Paper there is a review of the following parts: Strategy ABC Installation Cost System Conclusion…

    • 359 Words
    • 2 Pages
    Satisfactory Essays
  • Better Essays

    Keystone Xl Pipeline

    • 1440 Words
    • 6 Pages

    A proposed oil pipeline project will have the capacity to transport thounsands of barrels of crude oil to refineries in Oklahoma, Illinois, and the Gulf Coast of Texas. The Keystone XL is a 1,711-mile pipeline delivering Canadian crude oil to United States oil markets. This project is a response to the market demand for heavy crude oil in the Unites States. The pipeline will also be used to transport crude oil to the Cushing tank farm in the Midwest region. Many refineries in the Gulf Coast region provide millions of barrels per day, This region accounts for almost half of U.S. refining capacity. The refineries produce large amounts of refined petroleum product, like gasoline and jet fuel. The negative impacts of the Keystone XL project are too immense to outweigh the need for heavy crude oil in the United States.…

    • 1440 Words
    • 6 Pages
    Better Essays
  • Powerful Essays

    help. But after the initial 2­year construction of the Pipeline, there is only a need of 50…

    • 1635 Words
    • 7 Pages
    Powerful Essays
  • Powerful Essays

    Throughout the 1970’s and 1980’s, utility industries struggled to manage their nuclear power plant construction prudently in the public eye. Throughout this era, litigation chastised the mismanaged organizations to the tune of billions of dollars.…

    • 3699 Words
    • 15 Pages
    Powerful Essays
  • Good Essays

    1. When is the project estimated to be completed? How long will the project take?…

    • 576 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Army Safety

    • 3658 Words
    • 15 Pages

    A related publication is a source of additional information. The user does not have to read it to understand this publication.…

    • 3658 Words
    • 15 Pages
    Powerful Essays
  • Good Essays

    This Technical Bulletin is to advise Property Managers of the need to undertake an investigation of the integrity of the 'oily-water' drain from the Pumphouse to the Oil Interceptor. This Technical Bulletin is only applicable to aviation bulk fuel installations designed and constructed in accordance with the NATO Protected Bulk Fuel Installation (Vertical Tank Design).…

    • 950 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    A&D HIGH TECH

    • 263 Words
    • 2 Pages

    As of the 26th of August, what is the project schedule and cost? What are the trends? What is the critical path?…

    • 263 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Based on the projected income statement, the proposed project has an average net income of PHP 17,587,000 in a 5-year period operation vis-a-vis a total investment of PHP 15,000,000.…

    • 7568 Words
    • 31 Pages
    Powerful Essays
  • Satisfactory Essays

    MRPL CDU

    • 534 Words
    • 3 Pages

    (mrpl),located at kuthetoor, at mangalore on the west coast of in theevergreen dakshina kannada district. This has the distinction of being a first joint refinery in india, promoted by hpcl and adityabirla group of companies and now is a subsidiary of ongc.the refinery has a versatile design with high flexibility to processcrudes of various api and with high degree of automation. Mrplhas a design capacity to process 9.69 million metric tonnes per annum from its first two phases and further 3 million metric tonnesper annum from its third phase, which is being constructed. It is theonly refinery in india to have two hydrocrackers producingpremium diesel (high cetane).state of art technology, efficient systems of internationalstandard(iso 9001 to iso 14001), a team of committed employeesand backing of the parent company have converted mrpl into amajor player in the refinerysector and had a turnover of rs. 36000 crores during last year.before acquisition by ongc in march 2003, mrpl was a jointventure oil refinery promoted by m/s hindustan petroleumcorporation limited.mrpl has high standards in refining and environment protectionmatched by its commitments to the society. Mrpl has alsodeveloped a green belt around the entire refinery with plantspecies selected specially to blend with the flora.…

    • 534 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Stategic Management

    • 1233 Words
    • 5 Pages

    The project costs $8m and $9m respectively and the company’s cost of capital is 14%.…

    • 1233 Words
    • 5 Pages
    Satisfactory Essays