Gpon Islamabad
ETTS ASSIGNMENT – 13 SEP 12
INSTALLATION OF GPON AT ISLAMABAD

SUBMITTED BY: KASHIF SOHAIL
ROLL No: Fa-2012/MScEM/040

INSTALLATION OF GPON AT ISLAMABAD
PROJECT CHARTER
DEVELOP PROJECT CHARTER - INPUTS
Statement of Work. The scope of the project includes installation of GPON (Gigabit Passive Optical Network) at Islamabad. The same includes laying of fiber optic cable, installation of necessary PON components and provision of triple play services (Data, Voice & Video) and add-on services such as Video on-demand, Online Gaming, HDTV etc to 0.2M subscribers of Islamabad city. The project is to be undertaken as per the contract No HHHH dated 12 Sep 12.
Business Case. Erricson, after acquisition of Entrisphere, is a major manufacturer of GPON components which includes BLM 1500, BLM T100 ONT, BLM T151 ONT, BLM T300, BLM T500, EntriView EMS, Outside Plant (OSP) Cabinets. The project will enable maximum utilization of self-manufactured hardware and will result in generation of maximum revenues for the firm.
Contract. The contract of the project has been signed between PTCL and M/s Erricson No HHHH dated 12 Sep 12.
Enterprise Environmental Factors.
a. Installation of GPON at Islamabad should conform to ITU-T standards by way of G.984.x
G.984.1 describes the service provider requirements for the system.
G.984.2 specifies the physical layer for all the data rate combinations in G-PON.
G.984.3 defines the transmission convergence layer
G.984.4 defines the OMCI on the system
b. CDA standards for earth excavation and optical Fiber Laying.
Organisational Process Assets.
a. As per the company policy maximum utilization of self manufactured equipment /hardware will be used
b. As per previous experience Laying of Optical Fiber Feeder Cables, distribution Cables and installation and housing of out door components, errection of poles and Drop Cables should be outsourced to M/s YYY.
c. Optical Fiber Feeder Cable, Distribution Cables and Drop Cables manufactured by M/s ZZZ

You May Also Find These Documents Helpful

  • Satisfactory Essays

    , Limited (HHL) in the fall of 2006. Response to the RFP was assessed by the consultant, (HHL), and NAHARC staff. Jobe Technological Solutions was selected as the vendor for the project. The project is scheduled to begin 10/1/2014.…

    • 1014 Words
    • 8 Pages
    Satisfactory Essays
  • Good Essays

    Any equipment that is going to be needed needs to be sourced and if available within the company and if necessary booked for use that day. If it is not available from within the company it will need to be sourced from an external supplier.…

    • 878 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    The main needs of Australian Hardware with respect to the proposed WHS management system are:…

    • 5000 Words
    • 25 Pages
    Powerful Essays
  • Good Essays

    molok

    • 327 Words
    • 2 Pages

    - if the company is not an original equipment manufacturer (OEM), detail the functions fulfilled by the company, i.e. what services does it offer?…

    • 327 Words
    • 2 Pages
    Good Essays
  • Powerful Essays

    cells project

    • 3875 Words
    • 16 Pages

    Please sign below to indicate that you understand the expectations of the project and the due date.…

    • 3875 Words
    • 16 Pages
    Powerful Essays
  • Good Essays

    Either big or small company, in this case’s companies choose their right tool. They chose not only their company’s efficient, but also employees’ convenient and efficiency to use.…

    • 796 Words
    • 4 Pages
    Good Essays
  • Good Essays

    | |Completion of RCC work upto Mar 2010 |2) Strict Progress Montoring |the work should be carried as per available design and |…

    • 505 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Riordan Company Goals

    • 291 Words
    • 2 Pages

    As with most companies, Riordan’s Mission is to satisfy the wants of its customers when they buy a product or service from this company. The goal of this company is to be the leader in their industry. Ensuring this type of satisfaction will certainly go a long way in creating long term relationships with its customers. Riordan management realizes that this can best be achieved if the workforce has the tools that are needed to make their tasks more efficient. To remain competitive in the market it is imperative that Riordan utilizes modern and cost effective means to process the day to day business functions. Another very important thing that must be taken into consideration is the cost of installing such…

    • 291 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Rick Dennison Company

    • 457 Words
    • 2 Pages

    The time has come to set up suppliers and vendors for our equipment maintenance, office supplies etc. to meet the company’s needs in a more formal approach. In order to boost our performance we need to ensure that we are getting the best services at the most affordable prices without being taken advantage of. We also want to make sure that we are continuing to offer our products of high quality, and timely delivery to our wonderful consumers.…

    • 457 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    minimum, they should set up what is expected and what levels of service the equipment…

    • 1713 Words
    • 7 Pages
    Good Essays
  • Powerful Essays

    Total Productive Maintenance

    • 3296 Words
    • 14 Pages

    Keywords - Overall Equipment Effectiveness (OEE), Quality, Cost, Delivery, Safety, Cross functional Employee Integration, HR Competency, 5S, Employee Flexibility and Employee suggestions, TPM, ISM, MICMAC Analysis.…

    • 3296 Words
    • 14 Pages
    Powerful Essays
  • Good Essays

    Cabling Design

    • 1117 Words
    • 5 Pages

    As stated in the RFP we will only be responsible for specifying the cable plant design and associated equipment. The Firm has stated that they will use their own contractors for installation following the design. We suggest adding 10% more cable to the estimated amount to allow for adjustments adding any unplanned drops and/or changes made, this allows room for flexibility.…

    • 1117 Words
    • 5 Pages
    Good Essays
  • Good Essays

    Dongfeng A60 Case Study

    • 1461 Words
    • 6 Pages

    When produce one final product DongFeng A60 need pay royalty to Nissan company. A60 is took design from Nissan company, pay back to every product sold for one unit royalty charge in price. Nissan company give permission to DongFeng produce their own design or take inside part of the vehicle components. These two company has sign contact to each others and working together for many years. Other direct expenses is rental plant and machine is rent for the plant in many years. The purpose of rent this plant is for suitable place produce vehicle and store the final products. The machine is direct expenses because it direct to produce the vehicle like wiring, welding and install framework. Management will let machine do some difficult stage to install vehicle for high accurate and precise make no mistake or error. The purpose of bought in machine is to produce vehicle and replace some workers and reduce production cost. These both direct expenses also immediate to the product DongFeng A60, can trace directly to the…

    • 1461 Words
    • 6 Pages
    Good Essays
  • Satisfactory Essays

    300mm Réume

    • 684 Words
    • 3 Pages

    31/14 Hoang Du Khuong Str., Phường 12, Quận 10 Thành phố Hồ Chí Minh DĐ: 0908734119 michaelshackelford70@gmail.com PROFILE Diverse professional background includes over seven years working as a Lead Technician in the cable field, cable and control panel production, process and research and design engineering and property management. Supervised up to 85 people. Self-motivated, energetic problem- solver. Proven organizational, leadership and communications skills.      TECHNICAL SKILLS Expertise in cable network engineering Possess Military certification (J-Spec) for through-hole (SMT) soldering, cable harnessing and QC/QA certified up to ISO 9001 standard 568 networks certified, and Cable Network Engineer Strong knowledge and skill set in technical manufacturing in ICO 9001 setting Proficient in Microsoft Office, Oracle, Blue Moon, AMSI, Rent Roll, Access and DOS EXPERIENCE Hopewell Junction, NY…

    • 684 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Orgnizational Behaviour

    • 555 Words
    • 3 Pages

    In the years 1990-91 XYZ had grown into the largest Indian HARDWARE company with revenues of over Rs. 1100 crores and racing towards achieving its vision of being global top ten. As pioneers in the industry, XYZ’s strengths included on time delivery, premier position in the industry in terms of revenues, focus on training programs, quality initiatives, use of good technical tools and procedures and encouragement of individual excellence in performance.However, XYZ’s was also, at that point in time, grappling with a few areas of concern with regard to its operational paradigm.…

    • 555 Words
    • 3 Pages
    Satisfactory Essays