Use the spaces below to take notes on the key concepts presented in this study.…
include detailed repair information, such as a circuit diagram. Pt1420 Lab 6.3 Answers for simpler…
|Holden acts immature but can also act mature |Mr. Spencer states “do you feel no concern for your future.” |Holden does not want Phoebe to go to the museum and change every|…
Equipment Description...............................................................................................3 Inspection Zones ....................................................................................................4-5 Reading Tags..........................................................................................................5-7 Pre-Trip Process ........................................................................................................7 Post Trip Process.......................................................................................................7 Child Check ...............................................................................................................7 Engine Check ............................................................................................................7 Reviewing Inspections ............................................................................................7-8 Admin and GPS Training.......................................................................................8-12 Review and Clearing Inspections..............................................................................12 GPS.........................................................................................................................13 Reports ..............................................................................................................14-16 Appendix A.........................................................................................................17-19…
Where H_2 is the horsepower transmitted between shafts, Ks is the strand correction factor, Kr is the roller correction factor, N_1 is the number of teeth of the driving sprocket, n_1 is the rpm of the driving sprocket, p is the pitch of the chain, Lp is the length of the chain in pitches, and h is the life in hours of the…
The diameter of the shaft must be uniform throughout and there are two further design requirements : - the angle of twist between A and C must not exceed 1.5o; - the maximum permissible shaft shear stress is (MAX = 60 MPa. Determine the minimum shaft diameter that may be used, G = 77 GPa.…
Machine requirements hours per unit: Model S: (Stamping-0,3/Forming-0,25) Model LX: (Stamping-0,3/Forming-0,5) are given and known,…
7. When you have the coil in place, score the top, and add some slip.…
5. Inspect the drive pinion gear bearing cup on the torque converter and differential housing…
End item P is composed of three subassemblies: K, L, and W. K is assembled using 3 Gs and 4 Hs; L is made of 2 Ms and 2 Ns; and W is made of 3 Zs. On-hand inventories are 20 Ls, 40 Gs, and 200 Hs. Scheduled receipts are 10 Ks at the start of week 3, 30 Ks at the start of week 6, and 200 Ws at the start of week 3. One hundred Ps will be shipped at the start of week 6, and another 100 at the start of week 7. Lead times are two weeks for subassemblies and one week for components G, H, and M. Final assembly of P requires one week. Include an extra 10 percent scrap allowance in each planned order of G. The minimum order size for H is 200 units. Develop each…
The JET Copies assignment is similar to the Bigelow Manufacturing Company machine breakdown example in the textbook. Hence the example was used as a guide.…
4. Check that the circular bubble remains central when the instrument is rotated180°. If not, correct half the error with the foot screws and half with…
Page 1 of 6 Learner Id Card Report: RS-CIT-September 2012 Patel Career Point (45290083) Patel Career Point (45290083) BABU LAL PRAJAPAT HAPU RAM PRAJAPAT RS-CIT-September 2012 Learner Code: 811094411282213 DoB: 05/08/1974 Gender: Male Batch Timings: Computer Name: Mobile No.: 9829576185 www.rkcl.in/rscit.htm Authorised Signature Patel Career Point (45290083) SHAREEPH KHAN RASHID KHAN RS-CIT-September 2012 Learner Code: 811094911282213 DoB: 10/07/1987…
The Big “O” Company manufactures large hydraulic units. One of the most difficult items to manufacture is the hydraulic cylinder. The cylinder housing is fabricated from a malleable iron casting. The housing is machined to close tolerances, and the slightest discrepancy in either material or machining means a total loss. Machine cycle time on a typical housing is approximately sixteen hours. For several years, castings had been purchased from the Macon Foundries in Georgia. Macon had been a Big “O” supplier for many years, and during that time it produced thousands of castings at acceptable quality levels. Eight months ago, however, when its founder and president, George Chapel, died, Macon announced that it was discontinuing foundry operations. The supply department at Big “O” undertook a search for new sources. At first, few suppliers could be found who were either capable or willing to meet the exacting specifications and tolerances required. Ultimately, however, three foundries were selected and invited to submit bids on 4,000 castings. The low bidder, at $76.17 a unit, was the Barry Foundry of Muncie, Indiana. Barry was a small concern with a good reputation for doing quality work and fulfilling every delivery promise. Barry was given a purchase order for the full 4,000 units, with the stipulation that Big “O” approve the first 100 units. Within two weeks the first 100 castings were received. They were subjected to initial inspection and then dispatched to the floor for machining. In the words of the shop foreman, “They machined like butter.” Barry was told to proceed with the entire order and a four-month delivery schedule. It was about this time that problems began to develop in the shop. Some hard castings had damaged both grinding wheels and cutting tools. Also, cracks from casting porosity appeared on newly machined surfaces and slots. Although these conditions were not present in all castings, they occurred in a sufficient number to…
-For switchbot,you have in the right side of the screen(near inventory) a mini-menu with bonuspage and switchbot…