Preview

Energy Matter

Good Essays
Open Document
Open Document
402 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Energy Matter
Energy is essential part of this world. Everything in the world runs on energy. It play,s important part in

development of a country.

it is considered to be life line of

any economy and most vital instrument of socioeconomic development of a country.

There are many types of energy in this world which are obtained from different sources,

But in Pakistan main sources of energy are

(fossil fules, petroleum products, natural gas, coal, wind, nuclear, hydro power)

Pakistan is producing very less energy then demand. Main issue of energy is because of

Growing Energy Demand, Lack of proactive and integrated planning for production of Energy

and Imbalanced Energy mix.

Because of energy crices Pakistan is facing many issues like bad economic factors, less agriculture production,

shut down of many industries social issues and the issue which is worse and effecting Pakistan badly is unemployment.

To control these issues Pakistan main project is kalabagh Dam.The energy generated at Kalabagh would be equivalent to 20

million of oil per year.

Kalabagh wit its installed capacity of 2400 MW (ultimate 3600 MW) would add to the system a very large chunk of

cheap hydro-power.

In an average year, 11413 million kilowatts hours (MKWh’s) of electricity would be generated at Kalabagh.

Pakistan needs Kalabagh Dam not only because of energy issues but to control Floods are detrimental.Kalabagh would store

surplus water in the flood season and make it available forcontrolled utilization during the low flow season.

Kalabagh Dam Project was designed in 1984, with the assistance of the United Nations

Development Program; supervised by the World Bank, for the client Water and Power

Development Authority of Pakistan.It was estimated to cost US$ 3.46 Billion at June 1987

level and was scheduled to be completed in 6 years, Kalabagh Dam Project would be

located on river Indus 100 miles south-west of Pakistan’s capital

You May Also Find These Documents Helpful

  • Powerful Essays

    Unit 5 P4 M1

    • 1902 Words
    • 6 Pages

    According to Wright (2007), we need energy for everything we do. Energy can be found in different forms including chemical energy, electrical energy, thermal energy, radiant energy, mechanical energy and nuclear energy. We use energy all the time including when we are sleeping. We use energy for our muscle activity, new cells and blood circulation. (Wright, 2007)…

    • 1902 Words
    • 6 Pages
    Powerful Essays
  • Good Essays

    To first follow is the benefits of a dam, it is known that with a fully functional dam…

    • 1694 Words
    • 7 Pages
    Good Essays
  • Good Essays

    Studying Energy Changes

    • 1039 Words
    • 5 Pages

    Temperature (T) is a measure of the average kinetic energy of the particles that make up a substance (unit of Celsius; oC or Kelvin; K).…

    • 1039 Words
    • 5 Pages
    Good Essays
  • Satisfactory Essays

    ← Build dams to control river flow and hold back monsoon rain water in reservoirs.…

    • 319 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Dependency on Technology

    • 638 Words
    • 3 Pages

    Starting in 1957, the initial phase of the construction was completed in 1962. By this time the dam, spillway, penstock and two 40 MW Kaplan turbine-generators were built within the power station. In August 1982 a 50MW generator was comissioned. In October 1988 the 4th and 5th generating units, both 50 MW Kaplan-type turbines, were installed which raised the total generation capacity to 230MW.[3] The total cost of Unit 1, Unit 2 and a part of Unit 3 was Rs. 503 million and the total cost of extension was Tk. 1,900 million. The project was financed by the East Pakistan…

    • 638 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    Rpps in Pakistan

    • 10126 Words
    • 41 Pages

    This paper therefore intends to explore reasons for Pakistan to increase its power generation capacity through various new measures and incentives to private and foreign investors. The negative fallout of power shortages resulted in closure of industries, low production capabilities leading to unemployment and price escalation. This put a lot of pressure on the new government which was forced to take short term measures for filling in the power gap till its mid-term and long term power generation plans came on ground. The “Vision 2020 Program” of the government was initiated to address the power shortfall over the medium and long term with a view to add around 20,000 MW into…

    • 10126 Words
    • 41 Pages
    Powerful Essays
  • Powerful Essays

    Energy Crisi in Pakistan

    • 5556 Words
    • 23 Pages

    ISLAMABAD (APP) – The total generation capacity of the Tarbela Hydropower Station will touch 4,888 megawatt mark with the addition of 1,410 MW as a result of 4th extension project.…

    • 5556 Words
    • 23 Pages
    Powerful Essays
  • Good Essays

    Tarun Bharat Sangh

    • 560 Words
    • 3 Pages

    Mangu lal Patel, an old man of the nearby village of Gopal pura told them to dig tanks and build johads., Which they did and got results. The people of the region had a rich tradition of building Johads, small earthen check-dams which capture and conserve rainwater, improving percolation and ground water recharge.…

    • 560 Words
    • 3 Pages
    Good Essays
  • Good Essays

    That’s such a shameful reality of our present power generation scenario, false promises are made in every session for no use and its now obvious to everyone that energy will never be available with such absurd advertisements about electricity trafficking and operating air conditioner at 26 degrees what an excuse they have put forward..Although they have got loads of water reservoirs which can serve as huge hydro power generating plants in the north of the country, but again it’s a sorry condition of not utilizing the nature’s reservoirs. I remember the last year’s experience of 17 hours straight breakdown of electric power in the whole Karachi vicinity. That was such an impudent condition of our recent government that shows off the 21st century Pakistan. News are full of scandalous predictions as well as real facts but with a tag of complaint only and not for its solution. New graduates in the technology whenever tries to work on it, are highly condemned by the excuse of limited resources that shows the lack of interest in Pakistan’s prosperity.…

    • 572 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Need of Dams in Pakistan

    • 1713 Words
    • 7 Pages

    Natural gas and oil supply 80 percent of Pakistan’s energy needs but current energy consumption vastly exceeds the supply. For instance, Pakistan currently produces about 18 percent of the oil it consumes, fostering a dependency on imports that places considerable strain on its financial position. Meanwhile, hydropower and coal are underutilized, though Pakistan has potentially ample supplies of both.…

    • 1713 Words
    • 7 Pages
    Good Essays
  • Satisfactory Essays

    4.The biggest threat Pakistan has, is its power shortage problem. Power can be out for up to 20 hours a day in the summer. Households cannot rely on their refrigerators and at factories, the workers say that they can’t operate their machines for enough hours to earn their daily bread.…

    • 275 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Energy Cricis in Pakistan

    • 267 Words
    • 2 Pages

    In addition to that the long term reform include the construction of new dams, electricity production through cheaper sources, exploring alternative energy solutions and an efficient and in time completion of Iran-Pakistan pipeline and Thar coal project. Pakistan is blessed with natural energy sources like solar and wind. The extreme sunny weather in summers can be exploited to make maximum out of it. The coastal line is an inexhaustible source of wind energy. Another solution is to increase the ratio of power generation by nuclear plants.…

    • 267 Words
    • 2 Pages
    Good Essays
  • Satisfactory Essays

    Electicity Load Shedding

    • 270 Words
    • 2 Pages

    Minister of water and power Raja Pervaiz Ashraf failed to fulfill his promises. Electricity load-shedding is one of the biggest issues in Pakistan including poverty and unemployment. Government should take drastic measure to finish this electricity load-shedding. Pakistani nation is unhappy that government and opposition are busy in other legislative issues instead of resolving these primary issues.…

    • 270 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Kalabagh Dam

    • 366 Words
    • 2 Pages

    Kalabagh Dam is a dam which will add more than 3,500 megawatts to the national grid and it will be able to solve the problem of load shedding. The project was proposed many years ago, but different governments of the country have had conflicting views regarding the dam.…

    • 366 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Energy crisis in Pakistan are one of the major reasons which are hindering the economic growth of Pakistan. Unavailability of power is affecting directly or indirectly on every sector of life. Making people feel frustrated as well as helpless. The load shedding span has mounted to almost 12 hours a day to industries and about 8 hours to domestic consumers. This destructive power shortage has brought the industrialist as well as the local people on roads for an urge of protest, but despite of all such anti government actions this struggle is in vein as there is no progress in the electricity supply to the consumers. Due to unavailability of electricity Pakistan’s export is highly affected as industries are unable to meet up to the orders leaving their clients with no other option instead of switching to other vendors in other countries.…

    • 365 Words
    • 2 Pages
    Satisfactory Essays