Draft form of project study

Topics: Relay, Energy conservation, Efficient energy use Pages: 16 (2816 words) Published: September 29, 2014

EE Project Study (EEPD 5511)

A Project Study
Presented to the Faculty of the
College of Engineering
Manuel S. Enverga University Foundation

In Partial Fulfillment of the Requirements
For the degree
Bachelor of Science in Electrical Engineering
Expanded Tertiary Education Equivalency and Accreditation Program

By:
Fabilane, Rommer C.

August 2014
Unit I
Introduction
Energy plays important role in achieving the desired economic growth. Energy was used for economic production. But one of the major problems concerning today is its supply since the depleting nature of the extraction of fossil resources, makes the supply reach an alarming stage. That’s why energy conservation was driven to compensate the gap between energy’s supply and demand. This study will contribute to energy conservation since the prototype design will use only enough time for the pre-heat process using TDR or Time Delay Relay. The conceptual framework is also presented in this unit as well as the significance of the study including the scope and delimitation and definition of terms and acronyms use in entire study. Background of the Study

The company was founded in 1987 with the acquisition of Bach Engineering (annual revenues of less than $3 million). In 1989, its primary competitor in the avionics business, EECO, Inc., was acquired and the name was changed to B/E Avionics. In April 1990, the company went public on NASDAQ, raising nearly $12 million. In 1992, the asset acquisition of PTC Aerospace, Inc. (seating products) and Aircraft Products Company (galley structures and inserts) transformed B/E Aerospace into a cabin interiors provider, and the company name was changed to B/E Aerospace, Inc. Over the next 10 years, B/E Aerospace continued to acquire cabin interior equipment companies to strengthen its position as an interiors provider. In 2001, B/E Aerospace entered the distribution business with the acquisition of M&M Aerospace. In 2008, Honeywell’s Consumables Solutions business was acquired, creating one of the world’s leading distributors of aerospace fasteners and consumables, and providers of logistics services. Thanks to a culture that champions tireless innovation, uncompromising performance, and strategic growth, B/E Aerospace has evolved into a $3.5 billion industry leader with over 10,000 employees and more than 35 major facilities around the world. B/E Aerospace designs, develops, and manufactures a broad range of products, including aircraft cabin seating, lighting systems, oxygen systems, food and beverage preparation and storage equipment, galley systems, water and waste systems, and advanced lavatory systems. The Company also provides cabin interior reconfiguration, program management, and certification services. B/E Aerospace in the Philippines have three major business units including ALCI Advance Lavatory and Cabin Interiors, Galleys, and Ovens. It is located at Lot 18 3rd Street, First Philippine Industrial Park, Brgy. Ulango, Tanauan City, Batangas. The main functions of Equipment Engineering in Advance Lavatory and Cabin Interiors, ALCI Division, are the following Preventive maintenance- religiously performing PM to prevent major damage in production equipments, Troubleshooting or repair – Repair of equipments in case of machine breakdown. Generate improvement – equipment project to improve machine performance. The focus of this study is to conserved energy through implementation of the proposed design circuit which can eliminate one type of waste. The determined area for the study is the pre-heat process in Press area. In pre-heat process, the mold dies was heated prior loading to the press machine. The researcher will start the study through current process mapping to better understand and identify the main causes of problem. The appropriate solution to address the defined root causes of the problem is to design a circuit modification of the equipment. The researcher will focuses on the...


References: Tat W (Alan) Leung, 2007. Predictive Maintenance of Circuit Breakers. Retrieved from https://uwspace.uwaterloo.ca, Waterloo, Ontario, Canada, 2007
M.Shamir Ramli, M.Eng Thesis, QUT,2008. Investigation of circuit breaker switching transients for shunt reactors and shunt capacitor. Retrieved from http://eprints.qut.edu.au/, Queensland University of Technology, 2008
H. S. Ryu, S. Y. Park, G. H. Han, Y. I. Kwon, N. S. Yoon, “Design and Analysis of an Accelerated Life Test for Magnetic Contactors”, Journal of Electrical Engineering & Technology, vol.2, no.2, pp.188-193, Jun. 2007.
Hannan, M. A., Chan, K. W. (2004). Modern Power Systems Transients Studies Using Dynamic Phasor Models, Proceeding of the International Conference on Power System Technology (POWERCON), 2004, November, 21-24, Singapore.
Antônio Flavio Licarião Nogueira1 & Leonardo Jose Amador Salas Maldonado2 (2013). Analysis of AC Contactors Combining Electric Circuits, Time Harmonic Finite Element Simulations and Experimental Work. Retrieved from http://www.arpapress.com/Volumes/Vol14Issue3/IJRRAS_14_3_04.pdf
Continue Reading

Please join StudyMode to read the full document

You May Also Find These Documents Helpful

  • Effective and Efficient Project Management: Trophy Project Case Study Essay
  • Project Firecracker Case Study Essay
  • Essay on Project Management Case Study 5
  • Essay on Project Management Case Study 3
  • Alternative forms of project delivery Essay
  • project Essay
  • 7 Mavuno Project Case Studies Essay
  • Project draft Essay

Become a StudyMode Member

Sign Up - It's Free