Desired Cycle Time
A company is setting up an assembly line to produce 192 units per eight-hour shift. The following table identifies the work elements, items, and immediate predecessors. Work element
Time (seconds)
Immediate predecessor(s)
A
40
None
B
80
A
C
30
D, E, F
D
25
B
E
20
B
F
15
B
G
120
A
H
145
G
I
130
H
J
115
C, I
Total
720

Solution : First we draw the precedence diagram :

Calculation of Desired Cycle time

Cd = Production Time Available Desired Units of Output

Cd = 8 hours x 60 minutes / hour 192 units = 2.5 minutes

Calculation of Theoretical Minimum Number of Work Stations :
N = ∑t Cd = (40 + 80 + 30 + 25 + 20 + 15 + 120 + 145 + 130 + 115) / 60 2.5 = 720/60 = 4.8 2.5
Since we cannot have any portion of a workstation, we round up upto 5 workstations.

You May Also Find These Documents Helpful

  • Better Essays

    JGT Task 1

    • 1830 Words
    • 6 Pages

    The assembly line is budgeted to produce six work boots in a 40 hour week. This is equivalent to 480 minutes of production time in one eight hour day. The line can make 48 boots in an eight hour shift. This leaves a cycle time per boot of 10 minutes. In order to figure how many workstations are appropriate for the cycle time of 10 minutes, I calculated the total task time of the boots by the cycle time. The total task time is 46 minutes, divided by the cycle time of 10 minutes; leaves minimum necessary workstations of 4.6 or 5. This gives the production line the most efficiency. The assembly line was previously working with 8 stations with the longest cycle time of 10 minutes. There were several stations that had over 5 minutes of idle time. Idle time increases waste through not using employee’s time efficiently. By combining several of the work stations less idle time was created making the process more efficient. The fewer work stations also decreases the amount of time used to move items from station to station which is additional wasted time in production. When figuring the efficiency rate of the assembly line I multiplied the number of stations by the longest cycle time, and then divided that by the overall task time to make a pair of boots. The original process of the assembly line was operating at 58% efficiency. When I recalculated this using the 5 stations with a cycle time of 10 minutes, the efficiency rate was 92%. This is a significant increase. It would be recommended that the employees cross train in performing the tasks to help keep the process moving…

    • 1830 Words
    • 6 Pages
    Better Essays
  • Satisfactory Essays

    NT1210 Lab 1

    • 473 Words
    • 3 Pages

    = 1 + 2 + 0 + 0 + 16 + 32 + 64 = 115…

    • 473 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    Eco 550 Week 4 Paper

    • 565 Words
    • 3 Pages

    We explored three different options, given the need to create a division of work that would maximize the number of tables manufactured per day by either utilizing four or five employees and allowing the employees to either be part of the manufacturing process or manufacture tables on their own. We first decided to combine the finishing step with the packaging step since packaging required a very minimal amount of time and because the employee assigned to this function was being severely underutilized , therefore one employee could handle both job duties. We also decided that Cathy should be excluded from the manufacturing process and George should manufacture tables on his own, since he is the one that can assemble a table using the least amount of time. Using the Assignment method and the different times that it would take each individual to perform each job duty we concluded that it will take 260 minutes to manufacture one table given that assembly was assigned to Tom (60), finishing and packaging was assigned to Leon(90), and preparation was assigned to Randy(110). By utilizing this approach Tom, Leon, and Randy could manufacture 4.36 tables in 480 minutes( total time available divided by longest job time), given that they work an eight hour shift, meanwhile George could manufacture…

    • 565 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Pm3110 Unit 4

    • 854 Words
    • 4 Pages

    (10 pts) A processor makes two components, A and B, which are then packaged together as the final product (each product sold contains one A and one B). The processor can do only one component at a time:…

    • 854 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    M1 Week 3

    • 1315 Words
    • 6 Pages

    In order to find the minimum makespan for the two macines we can apply Johnson’sRule:…

    • 1315 Words
    • 6 Pages
    Satisfactory Essays
  • Satisfactory Essays

    The second production plan is the chase aggregate plan. In this plan, the aggregate production rate is equal to the demand forecast. As you can see in Table 2, we will hire 26 employees and lay off 18 employees during these 8 months. From these results, they indicate a fluctuation in the size of the workforce, ranging from a high of 21 employees to a low of 3 employees. This means the company must have enough space, tools, and equipment for up to 21 employees during 8 months. In addition, the total cost of this plan is $331,800, and the unit cost is $18.64 ($331,800 divided by 17,800 units).…

    • 177 Words
    • 1 Page
    Satisfactory Essays
  • Good Essays

    14. You have just determined the actual number of workstations that will be used on an assembly line to be 6 using the assembly-line balancing procedure. The cycle time of the line is 5 minutes and the sum of all that tasks required on the line is 25 minutes. Which of the following is the correct value for the resulting line's efficiency?…

    • 1392 Words
    • 6 Pages
    Good Essays
  • Good Essays

    ECO 550 FINAL EXAM

    • 1177 Words
    • 4 Pages

    7. A plant manager is attempting to determine the production schedule of various products to maximize profit. Assume that a machine hour constraint is binding. If the original amount of machine hours available is 200 minutes., and the range of feasibility is from 130 minutes to 340 minutes, providing two additional machine hours will result in the:…

    • 1177 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    Shuzworld Analysis

    • 5851 Words
    • 19 Pages

    A. Workflow: Shuzworld produces Rugged Wear Work Boots at its Shanghai production facility using an 8-step process and an assembly line of 8 workstations. Each workstation performs a single task that can range from 3 minutes to 10 minutes to complete, resulting in a total time of 46 minutes to fully assemble one pair of steel-tipped work boots. The facility has a budget to produce 6 work boots an hour, with a 40-hour work week (48 work boots a day). The following table shows the task schedule, along with the time required for each task and predecessor information to complete the 8-step process. The graph shows the current layout of the 8 workstations in the production line:…

    • 5851 Words
    • 19 Pages
    Powerful Essays
  • Satisfactory Essays

    Chap 2 E14 JE T Accounts

    • 327 Words
    • 4 Pages

    The company applies manufacturing overhead cost to production on the basis of $8 per machine-hour. A total of 30,000 machine-hours were recorded for October. g. Production orders costing $520,000 according to their job cost sheets were completed during October and transferred to Finished Goods. h. Production orders that had cost $480,000 to complete according to their job cost sheets were shipped to customers during the month. These goods were sold on account at 25% above cost.…

    • 327 Words
    • 4 Pages
    Satisfactory Essays
  • Satisfactory Essays

    A production manager for an exercise equipment manufacturing company needs to schedule an order for 50 UltimaSteppers, which are to be shipped in week 8. Using the following table and product structure for the UltimaSteppers:…

    • 1101 Words
    • 5 Pages
    Satisfactory Essays
  • Satisfactory Essays

    3. Assuming that processing starts at 7 am on a “busy” day, present the situation during such a day, by constructing an inventory build-up diagram for bins and trucks.…

    • 449 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    d) The case description of how many workers are needed when the plant runs over time is vague. Assume that there are 20 workers and that they are evenly split between full time and seasonal employees.…

    • 426 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Deloitte & Touch

    • 709 Words
    • 3 Pages

    (f) This assignment is a sampling of question types. Preparation for Test #2 should include all questions…

    • 709 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Network Design

    • 534 Words
    • 2 Pages

    On the first floor, there are 60 student computers (INST), 13 teacher/admin computers (ADM), 4 servers (ADM), and WIFI in the student lobby (PUB) with 253…

    • 534 Words
    • 2 Pages
    Satisfactory Essays

Related Topics