Top-Rated Free Essay
Preview

Cost Optimization for Workforce Scheduling Iet4405

Powerful Essays
1563 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Cost Optimization for Workforce Scheduling Iet4405
COST OPTIMIZATION FOR WORKFORCE SCHEDULING

An Operations Research Report
IET4405
Submitted to Gregory Wiles

By
Group 3:
Amanda Bathe
Eminue Eminue
Danielle Harmon
Theophilus Holley
Coltan Palmer
Abigale Vining

April 24, 2013

EXECUTIVE SUMMARY This report presents a recommendation for a hiring schedule that would allow Davis Instruments to hire temporary employees based on the product demand that varies from month to month for the six months of January to June, at the lowest cost.
Figure 2
Full-time and Temporary Employee Suggested Schedule
Figure 2
Full-time and Temporary Employee Suggested Schedule
Temporary Employee Suggested Schedule
Figure 1
Temporary Employee Suggested Schedule
Figure 1 In order to find the hiring schedule that would result in the least incremental training and salary costs, a linear programming model was formulated and solved. Temporary employees can be hired under three options. Option one allows the temporary employee to work for one month, Option two for two months, and Option three for three months. The training for all temporary employees occurs once, each time they are hired, even if they have worked for Davis before. The recommended hiring schedules for temporary workers is displayed below, next to a recommended hiring schedule for temporary workers assuming Davis first hired 10 full-time positions.

Figure 1 suggests 43 temporary workers for the 112 available positions. The total cost of this 6 month option is $313,525.00. Figure 2 suggests 10 fulltime positions and 23 temporary positions at a 6 month cost of $313,175.00. In the course of the 6 months, the full-time, part-time mix will save Davis $350.00.

PROBLEM DESCRIPTION
Davis Instruments (Davis) has manufacturing plants in Atlanta, Georgia. The customer demand for Davis’s products fluctuates considerably each month. The constant change in product demand makes it difficult for Davis to schedule its workforce. Davis started hiring temporary workers to help fill in the needs of the fluctuating product demand. Ultimately, Davis would like to simplify its workforce scheduling in relation to its expenses. Davis is currently hiring temporary workers from WorkForce Unlimited. WorkForce Unlimited offers Davis three options: Option | Length of Employment | Cost | 1 | One month | $2000 | 2 | Two months | $4800 | Figure 3
Figure 3
3 | Three months | $7500 |

Davis Instruments needs a profitable solution. Based on Davis’s projected employee needs for the six month period from January to June, a hiring schedule that minimizes cost is needed. Davis requires all employees, even if previously hired by the company to first go through the company’s $875.00 training course. Option | Length of Employment | Cost | Training | Cost per Month | 1 | One month | $2000 | $875 | $2875.00 | 2 | Two months | $4800 | $875 | $2837.50 | Figure 4
Figure 4
3 | Three months | $7500 | $875 | $2791.67 |

Because this part of Davis’s hiring expenses is a deciding factor in minimizing cost, as displayed in Figure 4, Davis would also like to know whether or not reducing training costs, and by how much, would greatly impact the hiring schedule. Finally, Davis is considering hiring ten full-time employees. These full-time employees would reduce the need for temporary positions over the six month period from 112 positions to 52 positions. Davis also needs a hiring schedule that minimizes costs for the 52 position potential. Ultimately, the hiring schedules associated with each of the two possible hiring strategies need to be evaluated based on their costs to help further suggest ways to minimize the cost of hiring at Davis.
ANALYSIS
MIN 2875(T11 + T12 + T13 + T14 + T15 + T16) + 5675(T21 + T22 + T23 + T24 + T25) + 8375(T31 + T32 + T33 + T34)
MIN 2875(T11 + T12 + T13 + T14 + T15 + T16) + 5675(T21 + T22 + T23 + T24 + T25) + 8375(T31 + T32 + T33 + T34)
In order to discover the optimal solution for reducing Davis’s costs while hiring temporary employees to fill each of the 112 needed positions, the following objective function was created:

T11+T21+T31=10
T21+T31+T12+T22+T32=23
T31+T22+T32+T13+T23+T33=19
T32+T23+T33+T14+T24+T34=26
T33+T24+T34+T15+T25=20
T34+T25+T16=14

T11+T21+T31=10
T21+T31+T12+T22+T32=23
T31+T22+T32+T13+T23+T33=19
T32+T23+T33+T14+T24+T34=26
T33+T24+T34+T15+T25=20
T34+T25+T16=14

With the use of LINDO- an optimization modeling program- and the following constraints,

Temporary Employee Suggested Schedule
Figure 5
Temporary Employee Suggested Schedule
Figure 5 optimal hiring strategy was discovered (see Appendix A and Figure 5). The hiring schedule according to each month and per each of the three options is mapped out in Figure 5.

As you can see in Figure 5, the best hiring plan includes hiring seven employees under option 1, three employees under option 2, and thirty-three employees under option 3. This brings the total of temporary employees to hire, in order to fill the 112 positions, to 43. Using all of the costs associated with each of the three options, previously shown in Figure 4, the total cost associated with hiring 43 temporary employees was calculated to be $313,525.00. All data used in calculations can be reviewed in Appendix B.
T11+T21+T31=0
T21+T31+T12+T22+T32=13
T31+T22+T32+T13+T23+T33=9
T32+T23+T33+T14+T24+T34=16
T33+T24+T34+T15+T25=10
T34+T25+T16=4

T11+T21+T31=0
T21+T31+T12+T22+T32=13
T31+T22+T32+T13+T23+T33=9
T32+T23+T33+T14+T24+T34=16
T33+T24+T34+T15+T25=10
T34+T25+T16=4

Because Davis was interested in hiring ten full-time positions as another option for reducing costs, an additional set of constraints was used with the previously stated objective function.
Figure 6
Full-time and Temporary Employee Suggested Schedule
Figure 6
Full-time and Temporary Employee Suggested Schedule
Running the new program in Lindo gave a new optimal hiring schedule shown in Figure 6 (full results in Appendix C). According to Figure 6, other than hiring ten full-time employees, Davis would need to hire seven employees under option 1, three employees under option 2, and 13 employees under option 3. According to this hiring plan, Davis has now filled 52 needed temporary positions with 23 temporary employees. Both part-time and full-time employees work approximately 160 hours per month. Full-time employees would work for $16.50 per hour. The total cost of the ten full-time employees, over the six month period, comes out at $167,150.00. The total cost of the accompanying 23 temporary employees is $146,025.00. The total combined cost for the six months is $313,175.00. This strategy for hiring would ultimately save Davis $350.00 over the six month period. All data and calculations associated can be viewed in Appendix B.
As seen in Figure 4, the costs of hiring under Options 2 and 3 through WorkForce Unlimited are higher than hiring an employee for just one month under Option1. However, once Davis’s one-time $875.00 training cost is added in, Options 2 and 3 become more affordable than Option 1. Through this information alone, it is evident that the cost of training is an important deciding factor when minimizing cost. For example, dropping the training cost to $700.00 per new employee would significantly change the hiring plan for Davis Instruments. By reducing the training cost this much, the most affordable solution would be for Davis to hire 112 Option 1 employees through WorkForce Unlimited. This would now only cost Davis $302,400.00, which is $10,125 cheaper than the previous optimal solution (see Appendix B). Cutting the cost of training from $875.00 to $700.00 may not actually be feasible. Knowing this, the amount of reduction in training cost necessary to change the optimal hiring schedule was drawn from the output of Lindo (Appendix A and C). If Davis reduced the training cost by $75.00 per new employee, Option 1 and Option 2 would cost the same for the company. Reduction in training cost of more than $75.00 would make hiring under Option 1 always cheaper than Option 2.
RECOMMENDATIONS
Based strictly on the costs for the six month period only, it is most financially favorable for Davis to first hire ten full-time employees and then continue to fill the remaining positions needed with temporary workers. As the chart in Appendix B shows, the full-time employee plan would save the company $350.00 over the six month period. However, it is necessary to review past experiences and projections of employment needs beyond the six month period to know for sure whether or not the ten full time employees will later cost the company extra money because they are not all needed. Additionally, Davis should evaluate its training cost. With a reduction in the cost of training of $75.01 or more, Davis could greatly impact its optimal hiring plan and also further reduce cost over the six months. Because $75.01 is only 8.6% of the total cost of Davis’s training it may be possible to invest in different materials or locations for training that would make the training cost less than $800.00. At that point Davis would be able to further optimize its hiring strategy based on cost.

Appendix A

Appendix B

Appendix C

You May Also Find These Documents Helpful

  • Good Essays

    Ac505 Project B

    • 901 Words
    • 4 Pages

    The company would hire three new employees. These three individuals would be full-time employees working 2,000 hours per year and earning $12.00 per hour. They would also receive the same benefits as other production employees, 18% of wages, in addition to $2,500 of health benefits.…

    • 901 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    Kooool

    • 716 Words
    • 3 Pages

    the number of capable new hires in production engineering, and to assist with the packaging…

    • 716 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Tanglewood Case 1

    • 571 Words
    • 3 Pages

    It is in Tanglwoods best interest to acquire new talent. If our managers are able to find the right people the new talent will be able to be flexible in numerous areas of the business which should cut cost on training. The new employees will work in different departments as needed. This plan should cut cost on training.…

    • 571 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Tanglewood Case #3

    • 573 Words
    • 3 Pages

    hire of $3,369.00. 26% of applicants via referrals were hired at an average cost per hire of $3,339.00.…

    • 573 Words
    • 3 Pages
    Satisfactory Essays
  • Best Essays

    Rwt 1

    • 3982 Words
    • 16 Pages

    ABC Manufacturing Co., Inc. is a small company with 120 full time employees. We produce aluminum doors and windows. Although we are highly successful, we find that it can be difficult to retain our valued employees. Human resources has decided to evaluate several compensation plans and see if any options exist that can help retain employment and improve productivity.…

    • 3982 Words
    • 16 Pages
    Best Essays
  • Satisfactory Essays

    1.(Tco a)

    • 380 Words
    • 2 Pages

    (TCO A) Suppose you are hired to manage a small manufacturing facility that produces Widgets.…

    • 380 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    HRM 598 Phase 1 final

    • 927 Words
    • 4 Pages

    Establish a staffing plan. Determine the positions needed. There is to be a minimum of 35 employees…

    • 927 Words
    • 4 Pages
    Good Essays
  • Good Essays

    Best Shot Offer

    • 530 Words
    • 3 Pages

    We are delighted to offer you the position of manager at 3Cs’ north-side facility, beginning on December 1, 2012.…

    • 530 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    The Workforce Matters guide for New York State agencies is a very valuable guide and relevant in 2012. It provides insight into the agency staff by recognizing the aging workforce and upcoming retirement; it recognizes the knowledge, experience and institutional memory that will leave the company once these long term employees leave. The plan addresses the changing demographic of its customers and the potential need for “new methods of service delivery and a workforce that reflects its customers”. They did not make the mistake of trying to solve staffing problems across the entire agency, but chose only those areas that they knew would have “considerable change in services delivered and the way in which they were delivered”. The agency also created “What If” scenarios by viewing the process through a narrow scope and broad scope.…

    • 1405 Words
    • 6 Pages
    Powerful Essays
  • Satisfactory Essays

    One of the most important thing in workforce management is relations between employer and employee, because as a managers we wanted to save our budget; however, sometimes retrenchment negatively affects workers attitudes. Thus one of the most significant things that we have learned is the importance of capability to measure the benefits of investments in training, programs, wages and many other aspects of HRM. Good workforce management will apply good investment strategy and focus on essential issues which should be solved in order to increase business results. That is why, we tried to find out the cost and benefit relationship to increase the effectiveness of our decisions. Managers should allocate their budget very smart, so that performance and loyalty of workforce will increase and, as a result, increase business profits. If company provides good conditions for employees, workers will have high morale, which leads to decrease in turnover, absenteeism, grievances and unit labor cost. That is why the appropriate amount of money should be invested in benefits and programs. Also it is very important to have qualified workers, because they will increase company’s productivity and quality. Thus, we invested a significant part of our budget in training. Generally, we…

    • 483 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    References: Bechet, T.P. (2008). Strategic Staffing: A Comprehensive System for Effective Workforce Planning (2nd ed.). NY, NY: AMACOM…

    • 2114 Words
    • 9 Pages
    Powerful Essays
  • Good Essays

    Forecasting of employment factors are based on historical data and projecting the future by following past trends. Classification of salaries and wages are projected, and discussed before the budgeting for the next fiscal year. The costs incurred by different departments within the organization are fixed and variable. The variable costs are based on workers’ salaries and the increase or decrease in productivity. Staff pools or float pools work more variable schedules consistent with work demands so contract labor is looked at as more cost productive.…

    • 481 Words
    • 2 Pages
    Good Essays
  • Powerful Essays

    Srinivasan, T., & Kleiner, B. H. (2002). How to hire employees effectively. Management Research News, 25(5), 65.…

    • 1232 Words
    • 5 Pages
    Powerful Essays
  • Good Essays

    Workforce Planning

    • 640 Words
    • 3 Pages

    a. Identify 10 characteristics of best practice succession planning systems and management that ensure desirable workers are developed and retained.…

    • 640 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Omm 618

    • 777 Words
    • 4 Pages

    Walker, W. Human Resource Planning. 1999, Vol. 22 Issue 2, p5-7. 3p. PERSONNEL management; INDUSTRIAL management; STRATEGIC planning; Human Resources Consulting Services; Administration of Human Resource Programs…

    • 777 Words
    • 4 Pages
    Good Essays