Cost Estimation and Budgeting

Topics: Costs, Cost, Variable cost Pages: 5 (3379 words) Published: October 25, 2014
Chapter 8 Cost Estimation and Budgeting 8.1 True/False 1) Direct costs are those clearly assigned to the aspect of the project that generated the cost. Answer TRUE 2) Material is an example of a cost that is recurring, variable and direct.Answer TRUE 3) An expedited cost is one that does not vary with respect to their usage.Answer FALSE 4) An order of magnitude estimate is usually more accurate than a ballpark estimate. Answer FALSE 5) Comparative estimates are more accurate than definitive estimates when applied to the same project.Answer TRUE 6) A learning rate of 90 means that for every doubling of output, the time required by the activity falls by 10.Answer FALSE 7) There is a tendency for different departments or functions to compete for scarce resources in a zero-sum game when bottom-up budgeting is used to develop a project budget. Answer FALSE 8) Activity-based costing is based on the notion that projects consume activities and activities consume resources.Answer TRUE 9) A time-phased budget allocates costs across both project activities and the anticipated time in which the budget is to be expended.Answer TRUE 10) A budget contingency of 1 million on a 10 million project means that the project will be planned for a cost of 10 million, but the project organization receives an extra 1 million to guard against unforeseen cost overruns.Answer FALSE 8.2 Fill in the Blank 1) Employing an overhead multiplier is sometimes referred to as the __________ rate for direct labor costs.Answer fully-loaded 2) __________ costs might be those associated with charges applied once at the beginning or end of a project.Answer Nonrecurring 3) Unplanned costs incurred when steps are taken to speed up the projects completion are __________.Answer expedited costs 4) The unofficial rule of thumb for __________ estimates is to aim for an accuracy of plus or minus 30.Answer ballpark or order of magnitude 5) __________ cost estimates can only be given upon the completion of most of the design work at a point when the scope and capabilities of the project are well-understood. Answer Definitive 6) Cost estimates can be too low if issues outside a firms control affect the project organizations ability to complete the project. These __________ might include inflation or political instability. Answer external factors 7) The __________ is a plan that identifies the allocated resources, the projects goals, and the schedule that allows an organization to achieve those goals.Answer project budget 8) __________ begins with the work packages of the work breakdown structure and specifies funds that are needed to support the tasks. These costs are aggregated by managers and duplicate costs are removed as managers budgets are combined.Answer Bottom-up budgeting 9) Activity-based costing is a budgeting method that identifies __________ associated with activities that consume resources.Answer cost drivers 10) __________ is typically added to the projects budget following the identification of all project costs that is, the project does not include __________ as part of the activity-based costing process.Answer Contingency money (funds), contingency 8.3 Multiple Choice 1) Which of the following is a direct cost A) labor B) rent C) depreciation on equipment D) health benefits 2) Which workers wages would constitute a direct cost for a construction project A) the projects cost accountant B) the brick mason C) the architects assistant D) the foremans 3) Three workers complete a full 8-hour day finishing concrete for a terrace. All three workers are paid 12 an hour and the job bills to the customer for 450. What are the total direct labor costs A) 450 B) 12 C) 288 D) 96 4) Which of these indirect costs is typically classified as an overhead cost A) advertising B) shipping C) sales commissions D) taxes 5) Which of these indirect costs is typically classified as a...
Continue Reading

Please join StudyMode to read the full document

You May Also Find These Documents Helpful

  • Budgeting Cost and Estimation Essay
  • Essay about Cost Estimation Methods
  • Strategic Role of Cost Estimation Essay
  • Essay on Cost Estimation
  • Cost Estimation Research Paper
  • Process Planning and Cost Estimation Essay
  • Costs Essay
  • Project Scope And Estimation Of Time And Cost Essay

Become a StudyMode Member

Sign Up - It's Free