DELAYS FACTORS IN CONSTRUCTION PROJECTS
DEVELOPMENT: THE CASE OF KLANG VALLEY,
MALAYSIA
ABDELNASER OMRAN
School of Housing, Building and Planning,
Universiti Sains Malaysia, Pulau Pinang
Email: naser_elamroni@yahoo.co.uk
OOI AI LING
School of Housing, Building and Planning,
Universiti Sains Malaysia, Pulau Pinang
ABDUL HAMID KADIR PAKIR
School of Housing, Building and Planning,
Universiti Sains Malaysia, Pulau Pinang
MAHYUDDIN RAMLI
School of Housing, Building and Planning,
Universiti Sains Malaysia, Pulau Pinang
Abstract
The problem of project delays in construction industry is a global phenomenon; Malaysia is no exceptional. Delays are always considered as costly to all parties involved in the project and very often it will results in dispute, claims, total abandonment and blight the feasibility for project owners and retard the development of construction industry. Therefore, the objectives of this paper are to identify the main causes and contributor to the project delays because delays can be minimized only when their causes are identified. Moreover, it is also aimed to investigate the most critical stage throughout the process of project development pertaining to the project delays as well as to recommend various methods that could be adopted by the construction industry players to mitigate the problems. In order to achieve the said objectives, a total of twenty one factors of delays which was then grouped under owner related, contractor related and consultant related delay factors and ten methods to mitigate the project delays were based on literature review. The structural questionnaires were distributed to the targeted respondents in Klang Valley, Malaysia. The findings from this paper shown that owner’s slow in decision making was perceived to be the most significant factor and main causes to the project delays. All of the respondents claimed that working drawing stage being the most critical stage in governing all of these

You May Also Find These Documents Helpful

  • Good Essays

    Risk Management Plan Devry

    • 1424 Words
    • 6 Pages

    5. Equipment delay. Equipment needed to complete the project is delayed. Un-availability of equipment. Equipment availability is important as well.…

    • 1424 Words
    • 6 Pages
    Good Essays
  • Powerful Essays

    Pm592 Course Project 2

    • 3890 Words
    • 16 Pages

    After entering the data and setting the project to 40% completion, we noticed that the project is behind schedule. This was apparent by the Schedule Variance and the SPI (Schedule Performance Index). The Schedule Variance for the project is ($570,977.84) with a Schedule Variance Percentage of -35%. We also noticed that…

    • 3890 Words
    • 16 Pages
    Powerful Essays
  • Good Essays

    My partners and I have made a list of areas that might cause the project delays or failure with their respective outcomes. We have listed the risk below that can prevent the project to finish on time.…

    • 1078 Words
    • 5 Pages
    Good Essays
  • Satisfactory Essays

    SCIC’s objective to such meeting is to discuss and determine the causes of such delay and what are the action plans to recover the delay and move forward.…

    • 109 Words
    • 1 Page
    Satisfactory Essays
  • Satisfactory Essays

    Termination for Cause

    • 324 Words
    • 2 Pages

    1) If the project has slipped into delays from which the contractor can make no reasonable recovery, and those delays significantly impact the project.…

    • 324 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Ariba case study 2

    • 6000 Words
    • 47 Pages

    problems figuring out what was delaying the project. He had been aware of some potentially…

    • 6000 Words
    • 47 Pages
    Good Essays
  • Best Essays

    Grant, K. P. et al. (2006, November-December). Delivering projects on time: Risk management can help managers anticipate the delays that make their development projects late. Research-Technology Management.…

    • 3043 Words
    • 13 Pages
    Best Essays
  • Satisfactory Essays

    A&D HIGH TECH

    • 263 Words
    • 2 Pages

    What is your opinion on the potential for the project to be completed on time?…

    • 263 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Project management has been in the construction industry since man started erecting buildings; little attention was given to the management of people and activities within the project. The main aim then was to get the building erected until recent times the management and organisation of people started being taken into consideration.…

    • 1904 Words
    • 8 Pages
    Powerful Essays
  • Good Essays

    Most of the Consultant put aside the preparing payment work because the work itself is a very tedious work and requires a maximum attention, because it involves the Client’s money, therefore it is understandable that why most of the Consultant tend to postpone the job. According to Wa’el Alaghbari, Mohd. Razali A. Kadir, Azizah Salim, Ernawati (2007) “From the consultant’s side, the first component that seems to be the cause of delay in construction projects is ineffective or lack of supervision, followed by slowness in giving instructions and lack of consultant’s experience”. A survey carried out by Wa’el Alaghbari, Mohd. Razali A. Kadir, Azizah Salim and Ernawati proved that the ineffectiveness of Consultant was one of the reasons of delay in a construction project. We can see that the effectiveness of Consultant with their job also play an important role in delivering a successful project. Consultant need to change their attitude in work and be more productive especially when it comes to prepare payment for Contractor because they must be paid on time to deliver a quality work. Consultant need to understand the important of preparing payment to the Contractor and not classify the work as not important compare to other works. Give payment early can prevent the…

    • 1083 Words
    • 5 Pages
    Good Essays
  • Good Essays

    Overall decision making and schedule completion were the successes of this project. Decision making based on project management development, resource allocation, communication styles and team dynamics were highlights of the ultimate scores. The project was completed after the optimum deadline, although not totally out of the window of opportunity.…

    • 1509 Words
    • 7 Pages
    Good Essays
  • Powerful Essays

    19 Appendix A INTRODUCTION SCOPE Focus of the term paper is to describe the several project delivery methods used in the industry and the complications arrived while in construction phase. While not the focus of this document, there is a brief discussion that touches on how contract strategies align with the various delivery methods. OBJECTIVES Purpose of the term paper is to identify the areas those effect the project delivery methods and resulting in dispute generation. In addition to that, term paper will include the recommendations that may use to resolve the disputes, which arises pre construction or during construction phase. METHODOLOGY The research employed combination of almost all of the techniques of data collection. Besides own observations, questionnaires were served, structured and…

    • 8095 Words
    • 25 Pages
    Powerful Essays
  • Powerful Essays

    Internal Marketing

    • 6006 Words
    • 25 Pages

    Correspondence: Ahmad Rasmi Suleiman AlBattat, School of Housing, Building and Planning, Universiti Sains Malaysia, Penang, Malaysia. Tel: 60-19-595-4499. E-mail: battat_ahmed@yahoo.com Received: November 28, 2012 doi:10.5539/ijbm.v8n5p62…

    • 6006 Words
    • 25 Pages
    Powerful Essays
  • Satisfactory Essays

    Bella Healthcare India

    • 551 Words
    • 2 Pages

    3. The project was far behind the schedule, causing heavy cash burden on the company.…

    • 551 Words
    • 2 Pages
    Satisfactory Essays
  • Better Essays

    national mosque

    • 5562 Words
    • 23 Pages

    The Putrajaya constructed wetland system comprises of six arms with 23 cells as described in Figure 1. All the arms (except of Upper Bisa) eventually discharge to the Central Wetland, which make the 24 cells in all, before the water flows down into the Putrajaya Lake. They straddle the water courses of Sungai Chuau, Sungai Bisa and three tributaries. A series of rockfilled weirs was constructed along the six arms of the wetland to divide the 24 cells. Although all the six arms are connected, they differ in size, depths, plant communities and pollutant loads that it is designed to handle.…

    • 5562 Words
    • 23 Pages
    Better Essays