1.0 General Description
1.1 General
1.1.1 Project Capacity This project is planning to install 2×300MW units, The configuration of unit is Pulverized coal fired boiler with condensing steam type turbine, and Limestone-gypsum wet Flue Gas Desulphurization system adopted.
1.1.2 Site Conditions(supposed for the technical proposal for the present.) 1. Location The power station is located at Boalkhali Chittagong Bangladesh 2. Fuel & Transportation The source of coal for the power station and oil for starting and operating will be supplied from Indonesia by ship and transferred from the unloading seaport to the site 3. Water Source The source of make-up water for the whole plant will be from a river near the power plant . 4. Geological Conditions The earthquake and the foundation treatment are considered as per in this technical proposal , however, the subsoil treatment measures we adopted at present is based on previous engineering practice which need to be further optimized or modified after the geological data is available .
1.1.3 Main Equipment 1) The boilers are of subcritical pressure, once reheat, natural circulation, single drum, single furnace, double gas pass, tangential firing, balanced draft, steel suspension structure type.
2) The turbines are of subcritical, reheat, double cylinder, double exhaust, condensing steam type.
3) The generators are of H2O-H2-H2 cooling, static type excitation type.
The Main Equipment will be manufactured by China.
1.1.4 Electric Power Systems The power plant shall be consists of two set 300MW TG units. The one generator shall be connected to 230kV GIS type switchyard through one own generator transformer. One line diagram of 230kV switchyard shall be double bus connected. Two (2) 230kV outgoing lines can be inleted the 230kV GIS type switchyard.
1.1.5 Traffic & Transportation The main/auxiliary equipment, materials will be transported by sea.
1.1.6 Auxiliary Facilities There

You May Also Find These Documents Helpful

  • Powerful Essays

    Unit 4222-371

    • 20924 Words
    • 84 Pages

    CONVENTIONAL FLUE AND ROOM SEALED BF FLOOR STANDING COMBINATION BOILER FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER…

    • 20924 Words
    • 84 Pages
    Powerful Essays
  • Powerful Essays

    Chemistry of Natural Waters

    • 3362 Words
    • 21 Pages

    in boilers inefficient, and eventually corrode the metal of the pipes. Scale is considered to…

    • 3362 Words
    • 21 Pages
    Powerful Essays
  • Satisfactory Essays

    Direct to Home

    • 1307 Words
    • 6 Pages

    and accessories. General layout of steam power plant. Different systems such as fuel handling system,…

    • 1307 Words
    • 6 Pages
    Satisfactory Essays
  • Good Essays

    unnatural disaster coal

    • 1181 Words
    • 5 Pages

    Power stations that utilize coal need large amounts of fuel. In other words, they not only need truckloads but trainloads of coal on a regular basis to continue operating and generating electricity. This only means that coal-fired power plants should have reserves of coal in a large area near the plants location. The present and…

    • 1181 Words
    • 5 Pages
    Good Essays
  • Powerful Essays

    Finishing

    • 861 Words
    • 5 Pages

    Calendering is a finishing process used on cloth where fabric is folded in half and passed under rollers at high temperatures and pressures. Calendering is used on fabrics such as moiré to produce its watered effect and also on cambric and some types of sateens.…

    • 861 Words
    • 5 Pages
    Powerful Essays
  • Good Essays

    or stoker, Induced draught fan, Boiler valves. Package biomass fired boiler is also developed for…

    • 380 Words
    • 2 Pages
    Good Essays
  • Powerful Essays

    Steam Generators and Boilers

    • 7567 Words
    • 31 Pages

    Boilers  Boiler may be defined as a closed vessel in which steam is produced from water by combustion of fuel.  According to ASME a steam generating unit is defined as: “ A combination of apparatus for producing, furnishing or recovering heat together with the apparatus for transferring the heat so made available to the fluid being heated and vapourised ”.…

    • 7567 Words
    • 31 Pages
    Powerful Essays
  • Good Essays

    Ta Energy Case Study

    • 1790 Words
    • 8 Pages

    Long-term stable customer was a key for the success of the project. Ayhan made a contract with RG Holding to sell 19MW for 10 years. From the purchase contract of RG Holding, he could finance in total $32million from bank loans. The supply of gas and oil was also important to run the power plant. Ayhan made 20 years’ contracts with BOTAS and British Petroleum for the supply at fixed prices. For the opertation of the plant, he made an agreement with International Power Corporation for three years.…

    • 1790 Words
    • 8 Pages
    Good Essays
  • Good Essays

    The results of this sampling program were used to determine the final location of the groundwater extraction wells. After that, URS initiated on-site construction activities in August 1999. They firstly uncovered seven dry wells approximately 3 m in diameter and 4.5 m deep which were abandoned before, as monitoring wells. Then three extraction wells and two monitoring wells were drilled. Besides, some other RA activities were performed. They trenched and installed the pipeline and electrical cables from the treatment facility to the extraction wells, and installed the reinjection trench, which were necessary for pumping groundwater into treatment facility. A building in which the treatment facility would be installed was constructed, firstly the building foundation and concrete slab, and secondly the pre-engineered metal building. After the construction of the building, the process equipment was installed. Then, an approximate two-inch thickness of stone cover was placed. Finally, they tested the groundwater treatment facility. The grading of this site was also done at this…

    • 822 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    Cochran Boiler

    • 1493 Words
    • 6 Pages

    It is one of the best types of vertical multi-tubular boiler, and has a number of horizontal fire tubes it also a Low Pressure Boiler.…

    • 1493 Words
    • 6 Pages
    Powerful Essays
  • Powerful Essays

    Bagasse cum coal co-generation plants, in partnership with the cane sugar industry of Mauritius have become major players in the electricity production sector. In the larger plants, coal is used as fuel during the off-crop season to enable electricity export all year round, ensuring optimal plant operation and profitability. In the year 2003, power sales to the utility, using bagasse and coal as fuel was around 300 GWh and 430 GWh, respectively. The development phase is approaching completion, and the energy optimization stage has started.…

    • 3611 Words
    • 15 Pages
    Powerful Essays
  • Satisfactory Essays

    SZS series of boiler are design by double drum, longitudinal type, full water pipe structure. It is…

    • 414 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Steam Turbine

    • 409 Words
    • 2 Pages

    The steam turbine is design based on the Rankin Vapor Cycle shown in Figure 1…

    • 409 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    In the purchase process of industrial steam boiler, companies need to pay attention to the technical parameters of the model of the boiler, which is the basis of the reference that companies need to focus on. This article from the rated evaporation of industrial steam boilers (t / h), rated steam pressure (MPa), rated steam temperature (℃), water temperature (℃), applicable to analyze industrial steam boilers:…

    • 409 Words
    • 2 Pages
    Good Essays
  • Satisfactory Essays

    - Major Power Plants (assets) – summarized and detailed information about the power plants (assets).…

    • 500 Words
    • 4 Pages
    Satisfactory Essays