Cist Control
Cost Control In Construction
Friday, 06 May 2011 00:00 administrator Hits: 2775
Cost Control is an obvious objective in Construction Management and Construction Scheduling. It should be recognized that no amount of paperwork achieves this construction cost control. The actual control is achieved through the ultimate decision of the manager that something should be done differently and the translation of that decision into practice.
The elements of a cost control system are:
* Observation
* Comparison of observation with some desired standard
* Corrective action to take if necessary.
A construction cost control system should enable a manager to observe current cost levels, compare them with a standard plan or norm, and institute corrective action to keep cost within acceptable bounds.
Most construction cost control systems have an inordinately long response time. Even the best cost control system would provide information on what was happening last week or last month. Since, in construction projects some activities might finish in a week or a month, then nothing could be done if the performance of such activities was reported to overrun estimates of respective costs.
Developments in Cost Control Systems
There are three developments in construction management which show promise of improving cost control system in the construction industry

1. Short term scheduling and control.
This system was developed at Lough borough University in association with a contractor. It aims to merger the planning and supervision and hence to obtain a more or less zero response time.
. 2. Project Cost model.
This a system developed by Dr Martin Barnes for simulating future actions and thus guiding the manager in his choice between them
. 3. Quantitative Scheduling
One of the unique Construction Software that provides a futuristic construction cost control tool for construction management is the CFF3 for cash flow forecasting. Version three has taken into consideration the possible

You May Also Find These Documents Helpful

  • Good Essays

    Cost control outputs involve cost performance baseline updates, cost estimate updates, performance measurements, and requested changes.…

    • 1088 Words
    • 5 Pages
    Good Essays
  • Powerful Essays

    Mcbride Financial Services

    • 4240 Words
    • 17 Pages

    References: APEGBC, (2009). Project Cost Control Basics. Retrieved July 22, 2010 from APGE website at…

    • 4240 Words
    • 17 Pages
    Powerful Essays
  • Satisfactory Essays

    One of the most important factors to the success of a project is how well the project is estimated, as well as how overall costs are managed during the execution phase by the project manager. Project costs and estimates are vital to the success of any organization to remain competitive in the market. Cost estimating for organizations rely heavily on resources that can sometimes be difficult to obtain. Forecasting and utilizing historical return costs are just a couple of ways that organizations rely on estimating. Experienced planners are often a sought trade within the market; this paper will discuss some often used project cost estimating techniques.…

    • 746 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Bmgt 485 Ch 5

    • 300 Words
    • 2 Pages

    What are the major types of costs? Which costs are controllable by the project manager?…

    • 300 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    • Cost Management: the processes that ensure the project does not deviate and/or exceed from its budget.…

    • 597 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Silver Fiddle

    • 1304 Words
    • 6 Pages

    * Silver Fiddle routinely subcontracts build work to local subcontractors. As previously discussed, Silver Fiddle is scheduled to build eleven homes this year, and these homes will be built in a local housing market which can be described as “booming”. Since the Czopek home is scheduled to be built within five months, our concern is that there will be a lack of subcontractors available to work on the home, given the booming housing market and the multiple homes being constructed simultaneously. We feel a well-designed time estimation based upon parametric procedures would help identify when specific subcontractors would be needed, allowing Silver Fiddle to “book” each subcontractor for the correct time required in advance. Simply put, parametric procedures are methods of estimating based upon data from past projects. This old data is then used to devise a cost, or in this case, a timeline, which is relevant to the new procedure. This is based upon the similarities between the legacy project data and the current project scope. These similarities are key for parametric procedures to yield accurate estimates. An alternate means of mitigating this risk is to identify a secondary set of subcontractors who are not in the local area and likely to be available during the forecasted time.…

    • 1304 Words
    • 6 Pages
    Good Essays
  • Powerful Essays

    project

    • 6946 Words
    • 41 Pages

    Copyright © 2007 All rights reserved. No part of this document may be reproduced or transmitted in any form or…

    • 6946 Words
    • 41 Pages
    Powerful Essays
  • Powerful Essays

    Road Construction

    • 2374 Words
    • 10 Pages

    International Infrastructure Project Cost Estimating Work Breakdown Paul Hewitt, International Project Estimating Limited Introduction Construction Cost Estimating Work Breakdown Structure (WBS) The term WBS has become a common term in all fields related to Cost Engineering including Construction Cost Estimating, Scheduling and Project Cost Control. A well defined WBS is the backbone of good Construction Estimating Software and can take several forms including the breakdown of items within an estimate, the layout of groups within a schedule or the rollup of accounts within a cost report. It usually starts with a client’s desire to breakdown a tender into definable pay items, followed by the project manager’s wish to schedule activities of work in a logically and efficient manner and the contract cost control engineer’s goal to track and forecast costs. In each case a properly organized WBS is required. The Phases of a Civil & Infrastructure Project The cycle of developing, designing, constructing and maintaining Civil & Infrastructure projects includes many phases and participants. The projects usually originate with a developer or government body who formulate a concept design and budget. If the project is approved it then moves on to preliminary design and a more detailed budget is estimated. Depending on the financing options available, the project may go out as a traditional Detailed Design and Bid Build project or proposals may be solicited for Design Build or Design Build and Finance options. Participants within the Project Cycle The life of a major international infrastructure project can involve many participants and span across many years. These projects involve developers, government agencies, engineers, contractors, operators, environmentalists and community stake holders. It is essential for the success of a project that all participants within the project cycle communicate and transfer data efficiently and consistently. Lack of a Standard Industry Wide…

    • 2374 Words
    • 10 Pages
    Powerful Essays
  • Good Essays

    Project Delays

    • 4262 Words
    • 18 Pages

    In a perfect world, all construction projects would finish on time, without changes or disruptions. Despite the common public perception that contractors cannot wait for the changes to start on a project because that is where they allegedly “make their money”, most contractors would prefer their projects to complete without changes. Changed work complicates a project, invites delays and increases the project cost — all things that make owners unhappy.…

    • 4262 Words
    • 18 Pages
    Good Essays
  • Powerful Essays

    It will also attempt to explain in brief but concise about the project control plans, cost controls, cost estimation and cost budgeting of the project…

    • 3699 Words
    • 15 Pages
    Powerful Essays
  • Powerful Essays

    These causes as well as the strategies to avoid them are discussed in greater details in the subsequent sections of this paper.…

    • 3333 Words
    • 14 Pages
    Powerful Essays
  • Satisfactory Essays

    Construction Management - II / Basics of Engineering Economics Performance:Slide501.doc Engineering Economics Principles § During our examinations we assume a consolidated economy. ( Free of extremities, such as war, hyperinflation, corruption, etc., and fundamentally operated by pure market mechanisms and by stabil legal and regulations’ systems ) § Our examinations are aiming at economic comparisions of functionally equivalent technical and/or financial options. Figures resulted by any analysis of any option can not be evaluated as themselves but as values to be measured against others.…

    • 2150 Words
    • 9 Pages
    Satisfactory Essays
  • Good Essays

    Max Bierman’s proposed are tighter fiscal and supervisory control will be placed over the subcontractors. They have to meeting deadlines and for quality of workmanship will be increased. Next, work tempo will be increase by abolishing the siesta break. Then, his assistant John Perkins will work with the project’s chief engineer and construction supervisor for overseeing efficiency. Finally, costs have to remain the same.…

    • 368 Words
    • 2 Pages
    Good Essays
  • Good Essays

    Pm0015

    • 2765 Words
    • 12 Pages

    Q1. In order to include the cost aspects in the project scheduling, it is very…

    • 2765 Words
    • 12 Pages
    Good Essays
  • Satisfactory Essays

    Vrushank

    • 502 Words
    • 3 Pages

    | Autodesk Navisworks 2013, Autodesk Revit Architecture 2013, Autodesk Civil - 3D, Primavera P6, Microsoft Project 2010, Multi Project Planner 3.3, AutoCAD 2012, Microsoft Office 2010…

    • 502 Words
    • 3 Pages
    Satisfactory Essays