Preview

Awpt Myanmar

Good Essays
Open Document
Open Document
871 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Awpt Myanmar
MANAGEMENT The first private port terminal in Myanmar owned and operated by National Entrepreneurs. Managed and operated by Asia World Port Management Co. Ltd. A subsidiary Company of Asia World Co. Ltd.

LOCATION OF AWPT

ASIA WORLD PORT TERMINAL

Located upstream of the Yangon River, about 47 miles away from the Pilot Station. Terminal facilities lie right in the heart of Yangon City.

YANGON RIVER ESTUARY
Sea access channel: 32 km long between port and river mouth near Elephant Point. Port is accessible to ships of LOA 167 metres. Permissible draft around 9 metres, controlled by available depths at the Inner and Outer Bars. Entry and exit from the harbour subject to the tidal conditions, generally timing with high tides to enable cross Inner and Outer bars.

AWPT

DEVELOPMENT OF AWPT

Developed on BOT basis as permitted by the Myanmar Investment Commission, under the Myanmar Citizens Investment Law. 4 phases of development as per the Master Plan. First 3 phases completed. 4th Phase under development. BOT Contract signed on 21 Nov 2006.

FIRST PHASE DEVELOPMENT (1)

A No (1)HLONE RICE AHLONE WH RICE WH ARF AR F

Wharf length: 156 metres of Island type jetty with 3 trestles. Land area: 1.32 acres, permitting only for direct receipt and direct delivery operation. Project investment cost: Kyat 439.3 M and US$ 4.6 M.

RICE MILL

FIRST PHASE DEVELOPMENT (2)

COMPLETION OF FIRST PHASE PROJECT

Project started in April 1996 and completed in December 1997. Concession period: 25 years lease with the option to extend additional 15 years to be approved by the Government.

SECOND PHASE DEVELOPMENT (1)

Wharf length: 198 metres (after dismantling the old No. 1 Ahlone Rice Wharf) for multi-purpose operations. Land area: 15.39 acres (including area occupied by 7 palm oil tanks and an old rice mill which were relocated). Project investment cost: Kyat 2.34 B and US$ 21M.

SECOND PHASE DEVELOPMENT (2)

COMPLETION OF SECOND PHASE PROJECT

You May Also Find These Documents Helpful

  • Satisfactory Essays

    Bob goes to school

    • 273 Words
    • 2 Pages

    5. Quantify the costs and benefits for NCC’s investment for the fifth Kiwanee dumper in…

    • 273 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    The Boat Harbour element of the project is proposed to be developed in three stages and includes an Inner…

    • 2444 Words
    • 10 Pages
    Powerful Essays
  • Powerful Essays

    Superior Grain

    • 1659 Words
    • 7 Pages

    After careful consideration and analysis, using the ROI, NPV, FV formulas and @Risk, we do not recommend for SGE to build a third wharf. Even though the construction of the third wharf will provide the company a mean of savings of $230,115 per season, or $1,150,575 in five years, it does not offset the cost of building the new wharf ($1,500,000).…

    • 1659 Words
    • 7 Pages
    Powerful Essays
  • Good Essays

    * About 3000 km ( 1865 mi) wide and has, 7000 km (4350 mi ) along the Bay of Bangal on the east and the Arabian Sea on the west.…

    • 1931 Words
    • 8 Pages
    Good Essays
  • Powerful Essays

    7, Jalan USJ 21/7, 47620 UEP Subang Jaya, Selangor. PI Supply Sdn Bhd (PIS) was…

    • 1313 Words
    • 6 Pages
    Powerful Essays
  • Satisfactory Essays

    fwfq

    • 358 Words
    • 2 Pages

    For any questions related to the property, you can contact Hanoi Palom a Hotel directly on: +84437184861 or at…

    • 358 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Philippine Flour Mill

    • 3428 Words
    • 21 Pages

    The factory located in Barangay Hondagua, Lopez, Quezon. It is approximately 223 kilometers from Manila by the south road, which is a part of PAN-PHIL Highway. The Company’s Private Pier is capable of accommodating ocean-going vessels carrying wheat imported from United State of America and Canada. The Plant Facilities includes storage silos for wheat a total capacity of 20,000 metric tons and standby Power Plant capable of operating the Mill and wheat in case of NPC power failure.…

    • 3428 Words
    • 21 Pages
    Powerful Essays
  • Best Essays

    Sample Project Proposal

    • 1273 Words
    • 8 Pages

    The Municipality of Boston is identified as one of the conflict affected area in the province of Davao Oriental. This municipality was badly devastated by the Super Typhoon Bopha. Barangay Sibahay is situated along the National Highway connecting the Municipality of Cateel and Boston and fronting the Pacific Ocean. Last December 4, 2012 typhoon Pablo left the barangay a picture total devastation, almost all houses and the crops – coconut trees, fruit trees, banana, abaca and other commercial trees and cash crops are damaged. Fishermen’s boat and other fishing gears are also destroyed.…

    • 1273 Words
    • 8 Pages
    Best Essays
  • Satisfactory Essays

    General arrangement

    • 2144 Words
    • 9 Pages

    This chapter describes the general layout of the ship. The ship has two decks – main deck and upper deck. It is designed to carry 450 passengers and has 8 crew members. For details refer, Drawing No: XXVII/02.…

    • 2144 Words
    • 9 Pages
    Satisfactory Essays
  • Powerful Essays

    Jenis pengguna pelanggan rumah tangga dengan volume penggunaan 1300 - 5500 VA mengalami kenaikan 18% Jenis pengguna pelanggan sosial dengan volume penggunaan 1300 - 200000 VA mengalami kenaikan 10% Jenis pengguna pelanggan bisnis dengan volume penggunaan 1300 - 5500 VA mengalami kenaikan 16%, diatas 200000 KVA mengalami eknaikan 12% Jenis pelanggan industri dengan volume penggunaan 1300 - 2200 VA mengalami kenaikan 6%, antara 2200 - 200000 VA mengalami kenaikan 9%, sementara diatas 200000…

    • 1378 Words
    • 6 Pages
    Powerful Essays
  • Good Essays

    The land acquisition work had been suspended in the area after violent protests on 10 June 2011. The state government has acquired about 2,000 acres for the project and requires an additional 700 acres for the project to start.…

    • 834 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    Resort Research Paper

    • 473 Words
    • 2 Pages

    It is unfortunate that structures such as cement houses or buildings can’t be built behind its shores, due to the fact that seasonal rain and monsoon softens the ground beneath it and waves brought about by the typhoons can easily reach the main campsite. Also, a stream flows from the…

    • 473 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    船 厂/ SHIPYARD: SHIPYARD: 船 名/ SHIP NAME: NAME: 产品名称/ PRODUCT: 产品名称 PRODUCT: 名称/ 产品数量/ Quantities: 产品数量/ Quantities: DAI DUONG JOINT STOCK COMPANY, YIETNAM DYNAMIC OCEAN 05 (油轮/ OIL TANKER) (油轮/ CDV-2 甲板阀/ CDV-2 DECK VALVE 甲板阀/ / 12 只/ 12 PIECES PIECES、…

    • 1376 Words
    • 6 Pages
    Powerful Essays
  • Satisfactory Essays

    PROJECT : CADANGAN MEROBOH DAN MEMBINA SEMULA 1 BLOK 7 TINGKAT BANGUNAN BENGKEL DAN MAKMAL FAKULTI KEJURUTERAAN UNIVERSITI MALAYA DI ATAS SEBAHAGIAN LOT 5270 MUKIM KUALA LUMPUR WILAYAH PERSEKUTUAN Item Description Quantity Unit Price (RM) Total Project Price (RM)…

    • 322 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Lone Pine Cafe

    • 516 Words
    • 3 Pages

    Address: Jl. Kampung Bali XV/No.2 Jakarta Pusat - 10250 Mobile : +62-081317170114 +62-817-5100-114 Email : tientien_na@yahoo.com…

    • 516 Words
    • 3 Pages
    Satisfactory Essays