Analytics Exercise II: Designing a Manufacturing Process

Topics: Unix, Workstation, Production line Pages: 2 (593 words) Published: February 1, 2015
Business in the 21st Century – MBA 8250

Analytics Exercise II
What is the daily capacity of the assembly line designed by the engineers? Assume that the assembly line has a computer at every position when it is started at the beginning of the day.
Assuming the assembly line has a computer at every position when it started at the beginning of the day, the daily capacity would be 225 units per day (30 units/7.5 hours). The line is operating at 7.5 hours per day and 9th workstation seems to be the jam-up is occurring which in turn limits the cycle time to 2 minutes. When it is running at maximum capacity, what is the efficiency of the line relative to its use of labor? Assume that the supporter is not included in efficiency calculations.

The sum of the task times is 583 seconds. To figure this out, I used the efficiently calculation of only including tasks performed at the work stations using labor and omitted the 310 seconds of software download. Efficiency = work content/(actual number of workstations X cycle time) = 583/6(120) = 80.97% How should the line be redesigned to operate at the initial 250 units per day target, assuming that no overtime will be used? What is the efficiency of your new design?

The cycle time will have to be reduced if overtime will not be used. To come up with the more idealistic cycle time I calculated: cycle time = production time per day/required output per day = 7.5 x 60 x60/250 = 108 seconds/unit. Almost every workstation is below the cycle time except for workstation 6 which is assembly line position number 9. To meet the new cycle time, I believe tasks 16 and 17 need to be split. I recommend moving task 17 into assembly line number 10 to accommodate the new cycle time and adding an additional worker on the line.

What about running the line at 300 units per day? If overtime were used with the engineers' initial design, how much time would the line need to be run each day?
If they were running about 300 units per...
Continue Reading

Please join StudyMode to read the full document

You May Also Find These Documents Helpful

  • Essay about Air Bag Manufacturing Process
  • Essay on Analytic exercise: Designing a Manufacturing Process Toshiba´s Notebook Computer Assembly Line
  • MANUFACTURING PROCESS, TECHNOLOGY, AND MANAGEMENT IN ENGINEERING Essay
  • Essay on Designing a safe process
  • Manufacturing Process Essay
  • Manufacturing Process Essay
  • Manufacturing Process of Fabric Softeners Essay
  • Process Design for Riordan Manufacturing Essay

Become a StudyMode Member

Sign Up - It's Free