An Investigation Into the Major Factors Affecting Project Completion of Upgrading the Infrastructure System in Vietnam
Rationale: The purpose of this paper is to analyse some causes constraining the construction process in Vietnam in recent times, and therefore, to recommend a number of solutions.

1. Introduction
1.1. Background Since economic reformation in the mid 1980s, Vietnam has made efforts to develop market economy, and therefore, this country has achieved many significant goals, especially in the industrial and service sectors. Besides these successes, it cannot be denied that the construction industry has played an important role by contributing a large proportion in the national economy. The General Statistics Office of Vietnam (2007), for instance, showed that capital invested into construction was approximately 21,136 billion VND (1 $US = 16,132 VND), with an improvement of 30% compared with the previous year’s statistics. Moreover, in the same period, the Vietnam Government spent 107,440 billion VND on fundamental construction, accounting for 26.9% of budget. Concurrently, the Vietnam Government also determined developing the infrastructure system, the basic physical and organisational structures or services and facilities needed for economical and social applications, as a momentous factor for national economy soaring. According to Thanh and Dapice (2009), after the financial crisis in Southeast Asia in 1997, investments into infrastructure were 10% of GDP on average, assisting Vietnam in becoming one of the most East Asian economies renown for its expenditure in upgrading infrastructure. On the other hand, although attracting a vast amount of money, the construction industry has not utilised effectively this investment. Many construction projects both in the state-run sector and private ones have faced a series of problems in execution that affected not only cost but also quality of works. Together with other frequent matters such as cost overrun, reduction in profit margin and loss of public belief in state-funded projects, delay is one of the



References: Aibinu, A.A. and Odeyinka, H.A. (2006) Construction delays and their causative factors in Nigeria. ASCE Journal of Construction Engineering and Management. 667-677. BBC News (2007) Inflation in Vietnam passes 27% [online]. http://news.bbc.co.uk/1/hi/world/asia-pacific/7522804.stm [Accessed in 29th August, 2010] Bramble, B.B Long, L. H., Lee, Y. D. and Lee, J. Y. (2008) Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries. KSCE Journal of Civil Engineering, 12(6), 367-377. Online Compact Oxford English Dictionary (2010) Infrastructure [online]. http://www.askoxford.com/concise_oed/infrastructure [Accessed 20th August, 2010] Thanh, N.X Toor, S. and Ogunlana, S.O. (2008) Problems causing delays in major construction projects in Thailand. Construction Management and Economics, 26, 395-408. Tumi, S.A.H., Omran, A. and Pakir, A.H.K. (2009) Causes of delay in construction industry in Lybia. The International Conference on Economics and Administration. Faculty of Administration and Business, University of Bucharest, Romania, 265-272. Vietnam General Static Office (2007) Investments categorised by profession [online]. http://www.gso.gov.vn/default.aspx?tabid=392&idmid=3&ItemID=8699 [Accessed in 19th August, 2010] Vietnam General Static Office (2007) Mechanism of state budget [online]

You May Also Find These Documents Helpful

  • Good Essays

    Jim Brown

    • 770 Words
    • 4 Pages

    From what we can determine so far the main issues revolving around your construction project are unionized workers starting strikes and weather concerns during December. We are also informed that the company will suffer from a $500 per week penalty fee on overhead expenses if the construction project is not finished on time. It is also stated in the contract that a penalty clause of $15,000 per week of delay beyond February 15 of the following year will be implemented.…

    • 770 Words
    • 4 Pages
    Good Essays
  • Good Essays

    many constructional projects had broken its budget. There are a lot of reasons, such as increasing scope, extending time, and inflation.…

    • 311 Words
    • 2 Pages
    Good Essays
  • Good Essays

    First of all, to define the economic performance of Vietnam, I will use GDP or gross domestic product as a basic to evaluate its effectiveness. According to a research of World Bank (2012), Vietnam was ranked 42nd over 178 countries with GDP (PPP) of $320.879 billion. Meanwhile, according to IMF (2012), Vietnam was ranked 51st over 178 with nominal GDP of $141.463 billion. These statistics already show a briefly look about the economic performance of Vietnam, in which can tell that, Vietnam still has a long way to achieve its ambition of becoming a strongly developed country. However, its accomplishment is remarkable.…

    • 482 Words
    • 2 Pages
    Good Essays
  • Good Essays

    a. Vietnam’s economy has grown significantly, expanding at an average rate of 7.5% per annum over the past decade. In 2010, foreign investors registered capital of nearly $18.6 billion (US), in which the actual disbursed capital came to $11 billion. Vietnam offers a welcoming investment climate, including solid economic grown, political stability, a competitive workforce, a gradually more open and transparent market, abundant natural resources and good geographic positioning in the region. The Vietnamese economy keeps developing at a rapid pace. Exports continued to increase at a high growth rate of 21% in 2003 helped by the strong performance of exports to the USA, which grew by over 60% from a low base.…

    • 934 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    Week 5

    • 548 Words
    • 3 Pages

    b. Government agency permits for construction delays. c. Telecommuting. d. Missing tools for the construction. e.Unstrict management. They would need to…

    • 548 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Annotated Bibliography

    • 680 Words
    • 3 Pages

    Assaf, S.A. and Al-Hejji, S. (2006) Causes of delay in large construction projects. International Journal of Project Management, 24(4), 349-57.…

    • 680 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    Resource Allocation Paper

    • 2410 Words
    • 10 Pages

    Project management is the discipline of defining and achieving targets while optimizing the use of resources: time, money, people, materials, energy, space, etc., over the course of a project. The most important resources that project managers have to plan and manage on day-to-day basis are people, materials, equipment and working capital. Obviously, if these resources are available in abundance then the project could be accelerated to achieve shorter project duration. On the other hand, [Avoid using colloquial language, slang or jargon in formal writing (14)] if these resources are severely limited, then the result more than likely will be a delay in the project completion time. Depending on the type of resources, the costs of providing an abundance of such resources to accelerate project completion time can be very high. However, if resources are readily available and excess premiums are not incurred to use them on the project, then project cost should be low, as some project costs are resource related while others are likely to be time dependent.…

    • 2410 Words
    • 10 Pages
    Powerful Essays
  • Powerful Essays

    References: [1] North S, Winch GM, Dawood N, Heesom D, Kelsey J, Sriprasert S, Technical evaluation: VIRCON Task 12 report UMIST, a VIRCON project report, 2003. [2] Laufer A, Howell GA, Rosenfeld Y. Three modes of short-term construction planning. Constr Manage Econ 1992;10:249–62. [3] Laufer A, Tucker RL. Is construction project planning really doing its job? A critical examination of focus, role and process. Constr Manage Econ 1987;5:243–66. [4] Laufer A, Tucker RL, Shapira A, Shenhar AJ. The multiplicity concept in construction project planning. Constr Manage Econ 1994;12:53–65. [5] Laufer A, Tucker RL. Competence and timing dilemma in construction planning. Constr Manage Econ 1988;6:339–55. [6] Laufer A. A micro view of the project planning process. Constr Manage Econ 1992;10:31–43. [7] Turner JR. The handbook of project-based management. 2nd ed.. London: McGraw-Hill; 1999. [8] Winch GM. Managing construction projects: an information processing approach. Oxford: Blackwell Science; 2002. [9] Goldratt EM. Critical chain great. Barrington: The North River Press; 1997. [10] Barber P, Tomkins C, Graves A. Decentralised site management – a case study International. J Proj Manage 1999;17:113–20. [11] Ballard G, Howell G. Shielding production: essential step in production control. J Constr Eng Manage 1998;124:11–7. [12] Faniran OO, Love PED, Li H. Optimal allocation of construction planning resources. J Constr Eng Manage 1999;125:311–9. [13] Kelsey J, Winch G, Penn A. Understanding the project planning process: requirements capture for the virtual construction site Bartlett research paper 15, a VIRCON project report: University College London; 2001. [14] Heesom D, Mahdjoubi L. Technology opportunities and potential volume 2: project planning software, a VIRCON project report: University of Wolverhampton; 2002. [15] Rummler GA, Brache AP. Improving performance: how to manage the white space on the organization chart. San Francisco: Jossey-Bass; 1995. [16] Winch GM, Carr B. Processes maps and protocols: understanding the shape of the construction process. Constr Manage Econ 2001;19:519–31.…

    • 6037 Words
    • 25 Pages
    Powerful Essays
  • Powerful Essays

    Research Paper

    • 17807 Words
    • 72 Pages

    DETR (1998), Rethinking Construction, Report of the Construction Industries Task Force chaired by Sir John Egan…

    • 17807 Words
    • 72 Pages
    Powerful Essays
  • Best Essays

    Abstract: Although China is often hailed by the rest of the world because of their quick decision-making and execution there is also the other side of China 's construction policy. There are a lot of cases where decision-making takes a long time. Because of the many actors involved and many layers of government who need to approve a project before it starts, delays can easily take years. This paper unveils the different actors involved and their interactions in Chinese construction policy. It also tries to find an answer to the research question: How do delays in Chinese construction policy occur? It will do so by analyzing the actors and their problematic ties in the Harbin subway case. Introduction: China is building complete cities within years, while other projects take years and years to even start. Where does this difference come from and which actors are involved. In order to examine the problem I 've selected the Harbin subway case. The main question in this paper will be: What caused the huge delays in the Harbin subway project? In order to examine the problem I 've split the paper into 3 parts. First I 'll give a history overview in which the events in the Harbin subway case are chronologically shown. Secondly I 'll look at all the actors involved and examine their role, interactions with other actors and complicated ties to other actors. At the end of the document I 'll finish by discussing the problem and giving my conclusion. History: The Harbin metro system has a long history of decision making. The first steps to create the Harbin subway system date back to the year 1973. In this year political tensions between Soviet Russia and China rose. In a reaction to this China decided to start "Project 7381" an air…

    • 4684 Words
    • 19 Pages
    Best Essays
  • Best Essays

    Construction Contract

    • 3895 Words
    • 16 Pages

    Is it possible for one standard form of construction contract to meet the need of every project? Discuss by reference to at least two forms in common use in industry.…

    • 3895 Words
    • 16 Pages
    Best Essays
  • Powerful Essays

    The construction industry generally plays a vital role in national economy due to the usage of its products such as roads, buildings and dams for the production of goods and services. Enhanced productivity has a positive effect on the Gross Domestic Product (GDP) of the nation. In spite of the immense size and significance of the construction industry to the economies of most nations, its productivity is one of the controversial and least understood factors.…

    • 7975 Words
    • 32 Pages
    Powerful Essays
  • Good Essays

    Most of the Consultant put aside the preparing payment work because the work itself is a very tedious work and requires a maximum attention, because it involves the Client’s money, therefore it is understandable that why most of the Consultant tend to postpone the job. According to Wa’el Alaghbari, Mohd. Razali A. Kadir, Azizah Salim, Ernawati (2007) “From the consultant’s side, the first component that seems to be the cause of delay in construction projects is ineffective or lack of supervision, followed by slowness in giving instructions and lack of consultant’s experience”. A survey carried out by Wa’el Alaghbari, Mohd. Razali A. Kadir, Azizah Salim and Ernawati proved that the ineffectiveness of Consultant was one of the reasons of delay in a construction project. We can see that the effectiveness of Consultant with their job also play an important role in delivering a successful project. Consultant need to change their attitude in work and be more productive especially when it comes to prepare payment for Contractor because they must be paid on time to deliver a quality work. Consultant need to understand the important of preparing payment to the Contractor and not classify the work as not important compare to other works. Give payment early can prevent the…

    • 1083 Words
    • 5 Pages
    Good Essays
  • Good Essays

    In the last years there was a raising concern among managers about the many slippages and budget overruns of key projects, while in several cases the promised benefits were not realized after project ends. Understanding the importance of smooth project delivery ability of GE, I – as the Project Management Office Manager of Budapest Bank, GE – propose in this document to initiate a research project to answer questions about reasons of project failures.…

    • 4309 Words
    • 18 Pages
    Good Essays
  • Good Essays

    Private and Publie Job

    • 786 Words
    • 4 Pages

    There are always different points of view between the needs of clients for public and for private sectors. There are 4 major factors affecting the choice of different procurement and contractual arrangement in both the public and private sectors. They are “Prestige”, “Profitability”, “Expectation” and “Quality”. The factor will be different in every case or project with different humanity, person, company… Prestige is very important especial for those project by public sector. It could be one of the factors that would affect a company for many years. For an example, many of the government projects is over budget as they thought before, that was not because they had a poor management and arrangement, it was because they will always try to do the best as they can to afford others people negative command. Therefore, change and change happened during the civil work or building time but still need to be finished on time. In this case, the public sectors had to invest more and more money into the project and try to maintain the quality of wok, finishing time on the project and the expectation for public. However it is not usually happened in the private sectors side, because for most of them the major factor affecting them is “Profitability” Profitability is the other major factor, without it no one will get in to the business. Most of the clients on private sectors side will put this factor on the top of their project. Sometime they will decrease the building time for the project. They want to finish it faster mostly because of two issues. First it could save money in their pocket and also they will have more people go for another project. In the positive side it is mean that they can use less time and limited people or workers and less money to work on the projects in hand. Second is the market. In an open market like Hong Kong that we are living right now, the unit price is different in every day. Every single developer want to sell it in a higher price to gain as…

    • 786 Words
    • 4 Pages
    Good Essays