660 MW WARM STARTUP PROCEDURES
WARM START UP AFTER 36 HRS SHUTDOWN AND HPC TEMPERATURE 340 C AND IPC 320 C WITH BOILER PR 1 TO 30 KSC

|NO |ACTIVITY SEQUENCE |
|1 |All HT, LT SWGR ,Battery chargers are charged |
|2 |Raw water pump in service & Clarified water treatment plant in service.- Pr. 2.5 ksc |
|3 |SACW pump in Service- Pr. 4.5 ksc |
|4 |Instrument and Service Air Compressors in service- Pr. 7 ksc |
|5 |Service water pump in service -Pr. 6 ksc |
|6 |CW pumps in service- Pr. 2 ksc, All Condenser pass charged., CT fan in service |
|7 |TG-ECW , SG-ECW & ACW pumps in service – Pr.7, 10 & 4 ksc |
|9 |Generator PSW System in service- Tank level>500mm, disch pr. 7.5 KSC. Stator water flow 110 -120 T/hr.Winding DP is 1.4 to 2.2 |
| |KSC. Conductivity 2.5-5 micro siemens/cm. |
|10 |Gen Filling with Air & Gen Seal Oil system charging Pp Disch Pr 10 KSC, Seal oil to Hydrogen DP is 0.6 to 0.9 KSC |
|11 |TG Lub Oil pump,& JOP in sevice- Lub Oil pr 1.2 ksc, JOP pr 80 ksc, Lub oil Temp 40-42 0C,DP across plate filter (150 to 300 mm) & |
| |Duplex filter are normal

You May Also Find These Documents Helpful

  • Satisfactory Essays

    Wheaton Case

    • 533 Words
    • 3 Pages

    Peak demand request are dealt by Wheaton Sanitary District by keeping recourses at their most elevated levels for both equipment and man-power. They have four screw pumps, which work autonomously. In any case, in the midst of top season each of the four could be in operation.…

    • 533 Words
    • 3 Pages
    Satisfactory Essays
  • Better Essays

    Hilcrest Auto Case

    • 973 Words
    • 3 Pages

    In this case, the production output of Hilcrest Auto ranges from 1,000 to 2,000 heater core…

    • 973 Words
    • 3 Pages
    Better Essays
  • Powerful Essays

    Case Review: Rohm and Haas

    • 1255 Words
    • 6 Pages

    Product name Treatment capacity Market potential Sale Volume Actual sale during 1st five month K 886 MW 1,000 gal $18M $5.4M (1983) $2.1M K MWX 50-100 gal reservoirs $20M $0.2M (target in 1984) $12,000!!!…

    • 1255 Words
    • 6 Pages
    Powerful Essays
  • Satisfactory Essays

    Jenny Wilson is a buyer at Flextron, a manufacturer of large industrial pumps. She has a…

    • 834 Words
    • 4 Pages
    Satisfactory Essays
  • Powerful Essays

    barrel of crude oil, 4 barrels of water must contaminated (Brecher). The extraction and refining…

    • 1635 Words
    • 7 Pages
    Powerful Essays
  • Good Essays

    *If circuit is loaded up to 80% ampacity, then 6 phase wires can be put in one conduit. Neutral conductors supplying balanced loads do not have to be counted.…

    • 1961 Words
    • 8 Pages
    Good Essays
  • Good Essays

    6. Equipped with oversized three layers of filter system, dust filtering ratio up to 99.99%, extending engine's life.…

    • 479 Words
    • 2 Pages
    Good Essays
  • Good Essays

    Demonstration Speech

    • 937 Words
    • 4 Pages

    Consult your owner’s manual or your mechanic to find out the amount of oil and type of oil…

    • 937 Words
    • 4 Pages
    Good Essays
  • Good Essays

    Apc Net Shelter

    • 1328 Words
    • 6 Pages

    Governor regulation class Voltage regulation, no load to full load Random voltage variation Frequency regulation Random frequency variation EMS compatibility ISO 8528 G2 +/- 1% +/- 1% Isochronous +/- 0.25% EN…

    • 1328 Words
    • 6 Pages
    Good Essays
  • Satisfactory Essays

    The Company is producing 3 major products – Valve, Pump and Flow Controller. The Company is concerned about the price cutting of Pumps going on in the market every month. It is also surprised to see no change in sales of Flow Controller despite 12 ½% increases in prices.…

    • 338 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    | 1.3 - Introduction to the company – Water Mart Systems (Pvt.) Ltd |5 |…

    • 2734 Words
    • 11 Pages
    Powerful Essays
  • Powerful Essays

    plant. The project is a run-of-river type 100 MW hydro electric power plant designed with a 4 Meter…

    • 2094 Words
    • 10 Pages
    Powerful Essays
  • Good Essays

    Tender for machinery– tenders to three approved pump manufacturers and installers, and three different companies specializing in compressors…

    • 953 Words
    • 4 Pages
    Good Essays
  • Good Essays

    Mr. Siva Krishnan has a few concerns on the product mix. First and foremost, Mr. Siva urges for the company not to expand itself so fast and sudden. This is mainly because, the company’s profit has seemed to diminish assiduously, and this has cause chaos for the company. Moreover, another concern of Mr. Siva would be that there was a diminished of 2 percent of sales in the net income of pumps, where the actual percentage should be 10 percent. And so with this issue, Mr. Siva vigorously advocates that Mahis Industrial should be concentrating more on their coeval products of valves and as well as flow controllers.…

    • 2103 Words
    • 9 Pages
    Good Essays
  • Good Essays

    Bac Bac Bac-Palaw

    • 4548 Words
    • 19 Pages

    START-UP PROCEDURE (SUP)PURPOSE AND SCOPEThis procedure provides the conditions for the start-up of the Turbine- Generator of Bacman I for the following conditions: * Cold Start-up; * Warm Start-up; and * Hot Start-upThe procedure covers the activities required in the start-up of the power facility from cold, warm or hot conditions, establishment of power generation with the generator synchronized to the grid and recovery from power facility trip-outs to normal operation. DEFINITIONSCold Start-up – refers to the sequence of operations to be performed for starting up the turbine when the initial turbine metal temperature is almost equal to the ambient temperature. This condition usually happen if the turbine is shut down 4 to 6 days after a high-load operation.Warm Start-up - refers to the sequence of operations to be performed for starting up the turbine when the initial metal temperature is almost equal to 100 degree centigrade. This condition usually happen if the turbine is shut down thirty six hours after a high-load operation.Hot Start-up - refers to the sequence of operations to be performed for starting up the turbine when the initial metal temperature is above 100 degree centigrade. This condition usually happen if the turbine is shut down twelve hours or less after a high-load operation.…

    • 4548 Words
    • 19 Pages
    Good Essays

Related Topics