METHOD STATEMENT FOR CONSTRUCTION OF GROUND BEAM AND FLOOR SLAB SITE DETAILS
Contractor name and contact details:
Segi 3 Construction Sdn. Bhd., Jalan Yong Shook Lin, 46050 Petaling Jaya, Selangor Darul Ehsan, Tel: 603-79858288 , Fax: 603-79529388 Project name and site address:
Cadangan membina dan menyiapkan 1 unit Gudang di Fakulti Alam Bina Universiti Malaya, 50603 Kuala Lumpur. Site manager name and contact details:
Arthur Davis Lim, Tel: 6013-8816633, Email: art90@gmail.com

Transfer of information from client/contractor to relevant sub-contractor -

Attendances
-

Work activity
Pre-start checks:
Checks the availability of plant and equipment to be used; ground conditions; and proximity hazards. Ensure the excavation area has been checked for overhead and underground services prior to the commencement of work. Description of the contract:

1.Excavation of trenches and casting of concrete ground beams as per drawing 2. Casting of concrete floor slab as per drawing (detail and information on the size, thickness and etc. is taken from the structure drawings) Sequence of work:

a) Ground Beam
1. Excavate trench to receive ground beam by labors. Remove excavated material from site by dumper. 2. Separate and level lean concrete Gr. 15 to receive beam
3. Install formwork as per working drawing including all necessary work 4. Erect and fix reinforcement bars Y12 to the installed ground beam’s formwork 5. Pour and spread the ready mixed concrete Gr. 30 directly into the trenches via the chutes on the mixer truck. The ready mixed concrete is supplied by a local ready mixed concrete supplier. 6. Cover the finished concrete surface by wet sacks and left them for 14 days for curing process 7. Remove and dismantle formwork from the ground beam by labors

b) Floor Slab
1. Place, spread, compact and level the clean broken granular hardcore to receive sand blinding 2. Place, spread, compact and level sand blinding to receive damp proof membrane...
Continue Reading

Please join StudyMode to read the full document

You May Also Find These Documents Helpful

  • Structural Design of a Building Essay
  • Essay about health and safety
  • Building Construction Essay
  • Risk Management in Construction Projects Research Paper
  • Construction Management Homework Essay
  • Building Tech SBA Essay
  • Road Construction Essay
  • construction industry Essay

Become a StudyMode Member

Sign Up - It's Free