Littlefield Lab Simulation Essays and Term Papers

  • Littlefield Simulation

    Littlefield Simulation Littlefield Technologies (LT) is a producer of newly developed Digital Satellite System (DSS) receivers. One contingency LT relies heavily on is their promise to ship a receiver with 24 hours of receiving the order. If they are late to this, the customer will receive a rebate...

    557 Words | 3 Pages

  • Littlefield Lab

    LITTLEFIELD LABS ANALYSIS Global Strategy Since the beginning the team decided to try an aggressive strategy to win the game, assuming a riskier position with higher potential benefits and costs. For that, it was necessary to identify key parameters of the process and design a dashboard to analyze...

    826 Words | 3 Pages

  • Littlefield Labs

    Littlefield Labs 1 Capacity Management at Littlefield Labs I. Introduction There are 3 stations in the game called sample preparing, testing, and centrifuging, while there are 4 steps to process the jobs. Before the game started, we tried to familiarize with the process of the laboratories and...

    766 Words | 3 Pages

  • Littlefield Simulation Report

    Executive Summary Our team operated and managed the Littlefield Technologies facility over the span of 1268 simulated days. Our team finished the simulation in 3rd place, posting $2,234,639 in cash at the end of the game. We did intuitive analysis initially and came up the strategy at the beginning...

    1533 Words | 6 Pages

  • Simulation Lab

    Simulation Lab Group #5 Dynamic Systems 1, ME3211 David Cramer Percentage of Work_______________________________________ Cory Spelman Percentage of Work_______________________________________ Table of Contents Objective Calculations Experimentation Results Appendices Objective The...

    1191 Words | 4 Pages

  • Littlefield Labs Report

    progress. On each team member’s day they would be responsible for monitoring all stations in the Little Field simulation. It was up to that team member to locate our weaknesses within the simulation and to bring it up to the entire group. Once the group was notified of a change that needed to be made,...

    548 Words | 2 Pages

  • Littlefield Technologies Simulation: Batch Sizes

    Littlefield Simulation 2: Occupylittlefield With our second littlefield simulation complete, we have reinforced many of the concepts and lessons learned in class. We had a better understanding of the operation of the littlefield facility and how certain modifications would affect the throughput and...

    501 Words | 2 Pages

  • PEPPERED MOTH SIMULATION LAB

    PEPPERED MOTH SIMULATION LAB SANTIAGO JACOME THE VICTORIA SCHOOL BIOLOGY SL Data and Analysis Life Cycle of the Peppered Moth: Because their light wings are peppered with small dark spots. Predators of the peppered moth are flycatchers, nuthatches and the European robin. Larvae feed on the leaves...

    702 Words | 2 Pages

  • Lab Simulation Exercise 7: Respiratory System Mechanics

     1.) When you forcefully exhale your entire expiratory reserve volume, any air remaining in your lungs is called the residual volume (RV). Why is it impossible to further exhale the RV (that is, where is this air volume trapped, and why is it trapped?) This "dead space" of air needs to stay in...

    1123 Words | 9 Pages

  • Littlefield

    LITTLEFIELD TECHNOLOGIES 2nd edition The Return of The Honeybadgers ------------------------------------------------- Executive Summary Over the span of 168 simulated days, team Honeybadgers managed the Littlefield Technologies job shop. The team’s objective was to maximize the firm’s cash position...

    963 Words | 3 Pages

  • Littlefield

    Littlefield Game Prof. Mellie Pullman Online Registration & Game Overview Why are we doing this? • Instead of a “textbook” problems, you will apply analysis techniques in a simulated service process environment. • More “real” and more “fun” • A team effort Getting on to the game, come ...

    789 Words | 10 Pages

  • Littlefield

    Managing Customer Responsiveness at Littlefield Labs Background Littlefield Laboratories (LL) has opened another lab. The new lab uses the same process as the lab in the assignment “Capacity Management at Littlefield Labs” — neither the process sequence nor the process time distributions at each machine...

    831 Words | 3 Pages

  • Littlefield Overview

    ittlefield Simulation #1: Capacity Management Team: Computronic When the simulation began, we quickly determined that there were three primary inputs to focus on: the forecast demand curve (job arrivals,) machine utilization, and queue size prior to each station. Specifically we were looking...

    863 Words | 3 Pages

  • Littlefield Technologies

    Managing Customer Responsiveness at Littlefield Technologies Background Littlefield Technologies (LT) has developed another DSS product. The new product is manufactured using the same process as the product in the assignment “Capacity Management at Littlefield Technologies” — neither the process sequence...

    809 Words | 3 Pages

  • Littlefield Overview

    MGT 9702 – SERVICE OPERATIONS I  LITTLEFIELD TECHNOLOGIES – OVERVIEW             Littlefield Technologies (LT) produces Digital Satellite System (DSS) receivers.  These  receivers  are  assembled  from  kits  of  electronic  components  procured  from  a  single  supplier...

    485 Words | 1 Pages

  • Littlefield Technology

    Littlefield Technologies Game 2 Strategy – Group 28 1. CUSTOMER ORDERS AND ORDERS WAITING FOR MATERIAL: When considering the demand level and changes, we would configure a time series of that data using short range forecasting. Time series are important because they are often the drivers of decision...

    1057 Words | 3 Pages

  • simulation

    rP os t 7007 REV. NOVEMBER 7, 2011 TEACHING NOTE Do No tC op yo Universal Rental Car - Pricing Simulation ________________________________________________________________________________________________________________ This guide was prepared by Professors Professors John...

    13785 Words | 89 Pages

  • Littlefield Technologies

    Littlefield Simulation1 Team Synergy discussed our strategy for the Littlefield Simulation. Following is the timeline summarizing the decisions we made and the justification for those decisions. Day 50 – Bought machine for Station 1 When we first evaluated our factory, we noticed from days 1 to...

    328 Words | 1 Pages

  • simulation

     1. What did you observe in inventory and back order levels when you play the game in uncoordinated and coordinated modes? What are the underlying reasons for the problems associated with uncoordinated decision-making? Based on the results you found in the previous part, list the...

    813 Words | 10 Pages

  • Simulation

    Summary of Lecture 4 The new material discussed in Lecture 4 was forecasting / time series analysis. This is a method that can be used to predict future events based on previous occurrences. It is useful when you don’t have the time, money or data to build a regression model. Additionally, forecasting...

    1834 Words | 6 Pages