Design and Construction of House in a Flood-Prone Area
NSPE Board of Ethical Review
2/15/12 – APPROVED
Case No. 11-9
Pg. 1

Conflict of Interest—Public Health and Safety—
Design and Construction of House in Flood Area
Case No. 11-9
Facts:
First Owner wants to build a house and hires Architect A and Engineer B. Following disagreements over the location of the house due to potential flooding and drainage issues, First Owner terminates Architect A and Engineer B after paying their fee. First
Owner then hires Architect C and Engineer D to design the house. After the house construction is completed, First Owner then sells the House to Second Owner.
Following a heavy rain, Second Owner discovers that the house has serious flooding and drainage issues and sues First Owner. Second Owner hires Architect A and
Engineer B to perform redesign services for the house. Engineer B is a fact witness and could also serve as an expert witness in the lawsuit.
Questions:
1.
In light of Engineer B’s concerns, did Engineer B have any ethical obligation to report to appropriate public authorities First Owner’s decision to locate the house in an area subject to potential flooding and drainage issues?
2.

Would it be ethical for Engineer B to perform redesign services for the house?

3.

Would it be ethical for Engineer B to serve as an expert witness in connection with the litigation between First Owner and Second Owner?

References:
Section II.1.c.

-

NSPE Code of Ethics:

Engineers shall not reveal facts, data, or information without the prior consent of the client or employer except as authorized or required by law or this Code.

Section III.4.

-

NSPE Code of Ethics:

Engineers shall not disclose, without consent, confidential information concerning the business affairs or technical processes of any present or former client or employer, or public body on which they serve.

Section III.4. a.

-

NSPE Code of Ethics:

Engineers shall not, without the consent of all interested

You May Also Find These Documents Helpful

  • Powerful Essays

    Once the owners and the general contractor have selected an electrician, plumber, and master carpenter, they will all meet to review the architectural plan and make any necessary changes. At this time the plan will be submitted to the city for approval. After approval is received, excavation is completed, and the actual construction has begun, the owners will have weekly meetings with the general contractor to closely monitor the progress of the…

    • 1988 Words
    • 8 Pages
    Powerful Essays
  • Good Essays

    Angus Cartwright III was an investment advisor based in Arlington, Virginia which main role in this particular scenario was to act as the intermediary between the DeRight brothers and potential local real estate properties. There was history already established between the DeRight and Cartwright family as they had been involved in business in the past, and there was full confidence of Angus expertise on arriving to an adequate deal. Cartwright had fully prepared a detailed financial analysis of four properties and was intending to best fit each DeRight’s goals and future expectations.…

    • 1499 Words
    • 5 Pages
    Good Essays
  • Good Essays

    Dan purchased the home identified by Pat and the following week Pat moved in and began living in the house. During the first six months after moving in, Pat installed new carpeting, window coverings and a patio cover at a cost of $8,000. Pat also mailed to Dan a check for $1,000 each month, with a note enclosed with each payment. In each note, Pat asked Dan, "Tell me what a fair commission isI want to finalize our deal." Dan cashed the checks each month, but failed to respond to Pat's notes.…

    • 1017 Words
    • 5 Pages
    Good Essays
  • Good Essays

    Adm 1300 Individule Case

    • 2880 Words
    • 12 Pages

    Problem: Derek and Sal needed to decide how to structure the ownership of their business.…

    • 2880 Words
    • 12 Pages
    Good Essays
  • Satisfactory Essays

    David Crockett was chosen by Jim Bowie as the contractor, to build Bowie’s house for $ 166,000. Between Crockett and Bowie there was a promise to build Bowie’s house. Crockett was required by contractual duty to finish Bowie’s house for the given amount of $ 166,000. Whether or not Crockett needed more money to finish Bowie’s house he was still obligated to continue the original agreed bid Crockett had with Bowie. Bowie did raise a fuss to Crockett regarding the extra $ 15,000 he had to pay in order for Crockett to finish building his house.…

    • 250 Words
    • 1 Page
    Satisfactory Essays
  • Good Essays

    Triangle Shirtwaist Fire

    • 873 Words
    • 4 Pages

    The building owners, Max Blanck and Isaac Harris- subcontracted much work to the individuals hired and pocketed a portion of the profits…

    • 873 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    Disaster mitigation measures are those that eliminate or reduce the impacts and risks of hazards through proactive measures taken before an emergency or disaster occurs.…

    • 112 Words
    • 1 Page
    Satisfactory Essays
  • Good Essays

    Rapid City’s Flood destroyed buildings, and even ruined half of the population, just like any other flood, Rapid City’s had many common details, and caused damage and destruction to property and lives that affected the region. But the area has recovered in its aftermath.…

    • 226 Words
    • 1 Page
    Good Essays
  • Better Essays

    Contract Breach

    • 1284 Words
    • 6 Pages

    Situations that involve written and oral contracts between clients and contractors happen every day. Quite often, a price is agreed upon based on a completion date and the performance that happens along the way. One such situation that I have experienced was when my Dad decided to purchase a brand new townhouse in a downtown Cincinnati residential redevelopment project. A private contractor named Drees had won the rights from the city to be the only firm that could be used in the construction project and they are very popular there. A contract was signed between my parents and the developers that a new home would be built to their specifications and delivered within a six month period and upon that date they could move in. The focus of this analysis is to bring the contract under scrutiny that existed between Drees and my parents and how the contractor performed their duties.…

    • 1284 Words
    • 6 Pages
    Better Essays
  • Satisfactory Essays

    This is the story that I have witnessed in my community. The dispute between the boundaries of houses led to the misunderstanding of each other. Since I do not own any rights to appear theirs real name in this paper, let’s assume they are James and Taylor. James and Taylor were longtime neighbors and best friends before the dispute happened. One day, Taylor had done some changes in her front gate, which included laying a concrete slab. This concrete slab intruded on James’ property line. Taylor and James had many strong emotions about what was the best way to resolve this property line dispute. For Taylor it was only a few cm. But for James it was a very important few cm. James, concerned about maintaining his current property rights, insisted that Taylor to remove the concrete. Taylor felt that in the spirit of being good neighbors the cm should be overlooked. On the top of the issue, there was a third party, “the property line agency” that was called by Taylor to mediate this issue. James felt betrayed that Taylor had called the property line agency on him a few months earlier. Taylor had called property line agency to get help with the property line issue. Shockingly, while investigating the property line, the agent noticed that James had constructed a concrete grave of his father 5cm in the backyard of Taylor’s property land. James was forced to move his father grave from Taylor’s land. James blamed Taylor. Taylor hadn’t meant for that to happen. Then she understood James’ anger towards her. In the end, James and Taylor made several apologies to one another and let go these past transgressions. Concrete slab of Taylor was still constructed and James’ father grave was also not removed. As a result of the mediation, James and Taylor were spared the expense of the property line agency and more importantly, returned to being good…

    • 324 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    I told him that a work order for this shall be put in with the building engineer.…

    • 557 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    a. What is the estimated cost for the Toltoy’s house if they use contractors to complete the house?…

    • 283 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    compare and contrast

    • 472 Words
    • 2 Pages

    The National Society of Professional Engineers (NSPE) and the Biomedical Engineering Society Code of Ethics states that biomedical engineers must uphold principles of ethical conduct in their professional practice, research, patient care, and training. NSPE categorically covers three areas of ethics which include fundamental canons, rules of practice and professional obligation. On the other hand, biomedical engineering code of ethic only categorize covers obligations in the area of health care, research, and training. Although both categorize their code of ethics in different heading, the concepts and rules of practice are very similar.…

    • 472 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Engineers are responsible for creating the everyday tools that everyone uses. Because engineers create the tools that people use, of course there needs to be an ethical code which every engineer must respect and follow. The film (Henry’s Daughters) takes a peek into many of the ethical issues raised by engineers. However, all of them might be solved by the proper moral propositions. Some ideas are in establishing: the proper environment, ethics as a priority when adding new employees, and…

    • 777 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Effect of Flood and Cyclone

    • 3124 Words
    • 13 Pages

    Bangladesh is prone to a variety of natural hazards. It has witnessed the havoc of some of the worst natural disasters of the world due to tropical cyclones and storm surges. Floods and local seasonal storms are annual events which cause loss of lives and damage to housing, agriculture and economy. The country is also exposed to the risk of earthquakes. There are other natural hazard concerns such as coastal erosion and sea level rise due to global warming, which have been in the limelight in recent years. Bangladesh is exposed to threat of hazards resulting from a number of natural disasters and remains classified as one the most vulnerable countries. Majority of the country is affected by cyclone, drought and floods. Bangladesh is prone to the natural disaster of flooding due to being situated on the Ganges Delta and the many tributaries flowing into the Bay of Bengal. The coastal flooding twinned with the bursting of Bangladesh's river banks is common and severely affects the landscape and Bangladeshi society. 75% of Bangladesh is less than 10m above sea level and 80% is flood plain, therefore rendering Bangladesh a nation very much at risk of further widespread damage despite its development. Whilst more permanent defenses, strengthened with reinforced concrete, are being built, many embankments are composed purely of soil and turf and made by local farmers. Flooding normally occurs during the monsoon season from June to September during the monsoon. The convectional rainfall of the monsoon is added to by relief rainfall caused by the Himalayas. Melt-water from the Himalayas is also a significant input and flood every year.…

    • 3124 Words
    • 13 Pages
    Powerful Essays