Contents
Table of Contents.....................................................................................................................................1 Task.........................................................................................................................................................2 List of Abbreviations................................................................................................................................3 TASK2

1.1Project Title4
1.2Introduction4
1.3Project Location Map5
1.4Terms of Reference6
1.4.1Project Details6
1.4.2Reporting Structure6
1.4.3Personnel Duties7
1.5Schematic Layout7
2.1DELIVERABLES8
2.1.1Dam8
2.1.2Water Treatment Works9
2.1.3Elevated Steel Tank10
2.1.4Water Transmission10
2.1.5Metering11
3.1Project Management Process12
3.1.1Initiating12
3.1.2Planning12
3.1.3Executing13
3.1.4Controlling14
3.1.5Closing14
List of references....................................................................................................................................16

List of Annexure

Annexure 1 - Project Budget
Annexure 2 - Work Breakdown Structure
Annexure 3 - Project Network Diagram
Annexure 4 - Project Gantt Chart
Annexure 5 - Project Summary

TASK

You are a consultant of a firm that has won a tender to develop a turnkey water project in Kajiado County. Using necessary tools including Ms Project prepare a WBS, and do a schedule of project tasks, their resources and assume a tracking of the project progress. Hence do a status report in a PDF file. The completed work should not exceed 20.

LIST OF ABBREVIATIONS

WBS- Work Breakdown Structure
WARMA - Water Resource Management Authority
NEMA - National Environmental Management Authority
ToR - Terms of Reference
GI - Galvanized Iron
RCC - Reinforced Cement Concrete

1.1Project Title

Proposed Water Supply Project in Kajiado Town
1.2Introduction

A project is one-time, multitask job with a definite starting point, definite ending point, clearly defined scope of work, a budget and usually a temporary team. A project is therefore a series of activities which are meant to achieve particular goals or objectives using specified resources and in a specified period of time. A turnkey project refers to a project that is built and handed over ready for use. The proposed water project in Kajiado County being a turnkey project will entail the consultant to take up construction from the initial stages of the project and hand it over when water has been connected to individual residents and/or users. Kajiado town lies at the intersection of the Nairobi – Kajiado road along the A 104 highway, and the railway line that serves Magadi Soda Company in Magadi. The town is situated 80 KM South of Nairobi. It is the administration centre for Kajiado County. Kajiado Town has a mean annual rainfall ranging from 450mm to 900mm. The major rivers found in Kajiado are among others Athi River, Ewaso Ngiro South River, Olekejuado River, Nool-Turesh River, Esokota River. The project involves construction of a dam along Olekejuado River, a water treatment plant, an elevated tank, a generator room, water transmission and distribution lines and water meter chambers. The presenter intends to use tools of Project Management Information Systems including MS Project 2010 software in achieving the implementation framework. The paper will be guided by Project Management processes of Initiating, Planning, Executing, Controlling and Closing to achieve set deliverables of the proposed project.

1.3Project Location Map

Figure1 - Map of Kajiado County

1.4Terms of Reference

This contractual document outlines the terms and conditions for the contracted project team. The process of initiating a project...