Swimming Pool

Only available on StudyMode
  • Topic: Waterproofing, Swimming pool, Waterproof paper
  • Pages : 12 (1949 words )
  • Download(s) : 110
  • Published : December 11, 2010
Open Document
Text Preview
Quotation For - Swimming Pool Area

|Water – Proofing Work Flow Details of Swimming Pool Area | |SR. # |D E S C R I P T I O N |QTY |Unit |Rate |AMOUNT | |A. |Breaking/dismantling and Removal Work |1708 Cu. Ft. |Cu. Ft. |40/- Cu ft |Rs 68,320/- | | |Dismantling the existing cast to RCC Slab area. | | | | | | |Dismantling of wall up to one ft above the floor level. | | | | | | |Carting off, unserviceable material / debris to dumping yard of hotel. | | | | | | |Cost includes providing sacs for carting off unserviceable material / debris to | | | | | | |dumping yard. | | | | | | | | | | | | | |Area = (61 Ft. x 28 Ft.) x 1 Ft. = 1708 Cu. Ft. | | | | | |B. |Cleaning Work |1708 Sq. Ft. |Sq. Ft. |15/- Sq. Ft. |Rs 25,620/- | | |Cleaning the surface of the exposed slab. | | | | | | |The dismantled area is further cleaned of loose particles, dust, alkaline salt | | | | | | |deposition and fungal growth, removed by both hand scraping and power tool | | | | | | |cleaning method. | | | | | | |All joints in between the vertical wall and horizontal floor are opened, widened | | | | | | |and cleaned thoroughly by power tool cleaning method. This step is the most | | | | | | |important stage. Through cleaning ensures successful bonding and cure of the | | | | | | |applied waterproofing material. | | | | | | |All vertical cracks, vertical joints, depth of the crack is identified, and a | | | | | | |u-groove is created. | | | | | | | | | | | | | |Area = (61 Ft. x 28 Ft.) x 1 Ft. = 1708 Sq. Ft. | | | | | |Poly - Sulphide Waterproofing System To Be Applied on the Mother slab Swimming Pool Area...
tracking img