Preview

Resume Quest

Powerful Essays
Open Document
Open Document
841 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Resume Quest
AMREEN RAHMAN
Apt#47, 11255-31 Avenue, Edmonton, AB, T6J 3V6 | 514-638-6841 | amreen.rahman@mail.mcgill.ca

SUMMARY OF QUALIFICATIONS
• Recent Mechanical Engineering graduate with over a year of combined oil & gas and mining experience.
• Sharpened analytical and problem solving capabilities through work in academic and industry projects requiring extensive analysis of data to find solutions to problems.
• Demonstrated ability to work effectively both in teams and autonomously.
• Enthusiastic learner, possessing excellent verbal and written communication skills developed by producing technical reports and specifications, proposals, team collaborations and delivering management presentations.
EDUCATION
Bachelor of Mechanical Engineering, Internship Program, McGill University
Graduation: May 2014
WORK EXPERIENCE
Contractor Project Engineer: Design Change and Configuration Management - Halliburton
Present, Edmonton AB
 Maintained and oversaw configuration and product lifecycle management of Halliburton’s Sperry Drilling products within the Enovia product data management system.
 Managed and controlled routing of component and assembly configuration items such as Bill of Materials for engineered systems, manufacturing specifications, engineering drawings and procedures in compliance with
Global Sperry Standards to ensure quality control and assurance.
 Evaluated Sperry’s Request for Technical Assistance for all change requests and proposals and managed modifications to the product’s design, hardware, firmware and documentation.
 Provided structure reports in preparation for transition from prototype to production and ran production release validation checks for product lines such as rotary steerables, mudmotors, MWD/LWD sensors, etc.
Mechanical Engineer (Co-op) – Vale
May 2011-September 2012, Sudbury ON
Engineering Experience:
 Led a spares optimisation project for pumps in the furnace gas cleaning circuit to minimise production delay due to component failure.

You May Also Find These Documents Helpful

Related Topics