ACKNOWLEDGEMENT
WE HEREBY TAKE THIS OPPORTUNITY TO THANK NTPC LTD. TANDA FOR GIVING US THIS OPPORTUNITY TO CONDUCT OUR TRAINING IN NTPC LTD., TANDA. WE ARE GRATEFUL TO MR. D.N. TIWARI(DGM,C&I) FOR ALLOWING US TO CONDUCT OUR TRAINING IN THE CONTROL & INSTRUMENTATION DEPARTMENT.WE ARE HEARTLY INDEBTED TO OUR PROJECT GUIDE Mr. LALIT KUMAR SINGH (Dy.SUPT,C&I)FOR PROVIDING US WITH DETAILED IN DEPTH KNOWLEDGE AND VERY USEFUL INFORMATION ABOUT THE PROCESSES AND SYSTEMS USED IN THE PLANT.HIS SUPPORT WAS INSTRUMENTAL IN OUR TRAINING BEING FRUITFULL.WE ARE ALSO VERY TANKFUL TO ALL THE OFFICERS AND STAFF OF NTPC LTD., TANDA FOR EXTENDING A HELPING HAND WHENEVER WE NEEDED IT. WITH REGARDS, RAVI KANT BHARTI

B.TECH FINAL YEAR (VOCATIONAL TRAINEE) (B.M.A.S ENGG. COLLEGE, AGRA (U.P))

INTRODUCTION
NTPC is the largest power generation company in India, with comprehensive in-house capabilities in building and operating power projects. It is producing 28,644MW. Its family consists of 18 coal based power plant producing (23209 MW) and 8 gas based power plant having a capacity of (5435 mw). It is also setting up a hydro based power plants having capacity of 2471MW. It is one of the largest Indian companies with a market cap of more than US$50 BILLION and has total assets of around US$ 20 BILLION. In this firm government has 89.5% stake and 10.5% with public. NTPC is ranked 463rd biggest company in the world, 5th biggest Indian company and 2nd largest Asian power generator. It produces 26350MW which is 20.18% of the total 130,539MW of all India consumption. More than one-fourth of India’s generation with one-fifth capacity. The next largest power utility owns 7.9% of market share in terms of capacity and 8.12% of share in terms of units generated. NTPC’s vision is to become world class integrated power major, powering India’s growth, with increasing global presence. It also develops and provides reliable power, related products and services at competitive prices, integrating multiple energy sources with innovative and eco-friendly technologies and contributes to society. NTPC stations are regular recipients of CEA’s meritorious performance awards. This firm is also well concern about the environmental factors. It uses world’s largest ESP’s and also gives emphasis on environmental monitoring along with efforts to increase energy efficiency.

BRIEF HISTORY OF THE POWER PLANT(TANDA)

This prestigious power plant was inaugurated by late Prime Minister “Smt. Indira Gandhi” in 30th December 1981. It is located 22km away from the distt. Of Akbarpur (Ambedkar Nagar) and 60km(Approx) from Faizabad in the state of Uttar Pradesh. The capacity of the Power Plant is 440MW consisting of the four units each of 110MW capacity. This Power plant originally was owned by U.P. State Electricity board but the level of performance that is P.L.F.(Power load factor) deteriorated which was taken over by NTPC at the date of 15th January on the year 2000 and It’s now successfully run by the co-operation work of engineers, workers, helpers and the other people who indirectly help the growth of this power plant and is now running an average of 85-90% (PLF). In the starting period of acquisition the PLF was these units were supplied, erected and commissioned by M/s BHEL. The Power house was located on the bank of river Saryu and West of the existing Mehripur pumping station of the Tanda canal system. Necessary land, water and transport facilities are available. Land facility:-

1 .Land for Power Station including storage yard, Marshalling yard, Switching yard :- 120 hectares 2. Land for ash disposal 160 hectares