Pakistan Electricity: Solutions and Ongoing Projects

Only available on StudyMode
  • Download(s) : 935
  • Published : April 4, 2010
Open Document
Text Preview
Written by: Afreen Baig


After the construction of the Hydro-Electric Tarbela Dam and the Mangla Dam, by General Ayub Khan and General Yahya Khan in the 1960’s, our governments failed to conceive and initiate major electricity projects.

The inept governments of PML-N and PPP, that still consider themselves vital to democratic dialogue within the provinces, failed to create dialogue within provinces, on the most important issue facing Pakistan’s energy survival – the Kalabagh Dam. Their governments failed to plan for the future growth and energy requirements. Recently the government of PPP has scraped the project altogether.

"Unexpected Economic Boom & Energy Consumption in the last 10 years"

Pakistan’s $75 billion economy boomed into a $160 billion economy, with the consumption of gas, electricity and coal increasing YEARLY to an average rate of 7.8 percent, 5.1 percent and 8.8 percent, respectively.

The number of electricity consumers grew from 15.9 million in 2005-06 to 16.7 million in 2007, showing a growth of about 70 percent over the last 10 years.

The major Energy consumption sectors of the country are: Industrial (38.3 percent), Transport (32.8 percent), Residential and Commercial (25 percent), Agriculture (2.5 percent) and others (2.2 percent).

As regards Electricity, the Household sector has been the largest consumer over the last 10 years, on average consuming 44.8 percent, followed by Industrial sector (29.4 percent), Agriculture (12.2 percent), Commercial sector (5.9 percent), Street lights (10.6 percent), the officials say.

"Record Sales of Electronic Items"

Recently, we got good news from Pakistan Haier. In May, Pakistan Haier made new RECORD air-conditioner, refrigerator monthly output. The sale volume reached all time high, the year-on-year sale increase of Air-conditioner, Refrigerator, Washing machine, Micro wave and TV are 136%, 58%, 180%, 210% and 106% respectively. Similarly, many other Electronic Companies have created record sales.

"Projects executed and under Construction"

The first unit of 290-megawatt of Ghazi Brotha Hydel Project (GBHP) went into operation in June 2003, and contributed around 50mw of electricity to the national grid. Four more units were added every quarter, and by 2004 the GBHP was contributing 1,450 mw.

Nuclear power plant Chashma-2, will soon come on-line, and will add another 300MW to the national grid.

Mangla Dam uprising will give another 644 GWh of power. Gomal Zam Dam is under final stage of construction, and upon completion it will produce 17.4MW

In 1999, our installed capacity was merely 15,860 MW. (With Hydel 4826 + Thermal 10,897 + Nuclear 137)

In 2005-06, our installed capacity increased to become 20,495 MW. (With Hydel 6499 + Thermal 13,534 + Nuclear 462)

"Concrete steps under the PML-Q Government"

President Pervez Musharraf launched the Rs 130 billion (US 2.16 billion) Neelum-Jhelum Hydroelectric project aimed at producing 969 MW power.

Work on 11 projects with an accumulative power generation capacity of more than 12,000MW would start by 2009.

These projects include Bunji (5,400MW), Dasu (4,000MW), Kohala (1,100MW), Spatgah and Palas Valley (1,230MW).

Wind and Solar Technology: Pakistan is seeking to explore alternative sources of energy production and use Wind and solar technologies with the aim to produce 9,700 MW wind power by 2030, thereby providing electricity to 7,874 off-grid villages in Sindh and Baluchistan.

225 wind water pumping systems have been installed in Balochistan. Over 140 micro wind turbines of 500 Watts each are operational in Sindh and Balochistan, providing electricity to 691 houses in 18 remote, off-grid villages.

Hydel Power: The government is giving top priority to Hydel power with the potential...