Padma Bridge
Padma Multipurpose Bridge

Carries| Motor vehicles, Railway|
Crosses| Padma River|
Locale| Louhajong, Munshiganj to Shariatpur and Madaripur, Bangladesh| Maintained by| Bangladesh Bridge Authority|
Designer| Maunsell AECOM|
Design| Truss bridge|
Material| Steel|
Total length| 6,150 m (20,180 ft)|
Width| 21.10 m (69.2 ft)|

The Padma Bridge is a multipurpose road-rail bridge across the Padma River to be constructed in Bangladesh. When completed it will be the largest bridge in Bangladesh and the first fixed river crossing for road traffic. It will connect Louhajong, Munshiganj to Shariatpur and Madaripur, linking the south-west of the country, to northern and eastern regions. The project covers three districts — Munshiganj (Mawa Point/North bank), Shariatpur and Madaripur (Janjira/South bank). The total area of land to be acquired and required for its components is 918 hectares. The requisition of land for the construction yard will be for six years on a rental basis. As per the new design, an additional 144.04 ha has been identified for acquisition, bringing the total to 1062.14 hectares. This additional land is required because project site lost significant land due to erosion, for transition structures and due to a change in railway alignment. The two-level steel truss bridge will carry a four-lane highway on the upper level and a single track railway on a lower level. The project will include 6.15 km long and 21.10 m wide bridge,15.1 km of approach roads, toll plazas and service area.

Previous Source of Financing
Project cost is estimated to be US$3.00 billion. Funding for the project is provided by the Asian Development Bank (US$615 m), the World Bank ($1.5 billion), Japan International Cooperation Agency ($415 m), Islamic Development Bank ($140 m). The government also signed another $14.84 million agreement with the IDB for the implementation of the water-supply and sanitation project in cyclone-prone coastal areas, and Abu Dhabi Development Group ($30 m). Of the total amount, the government will provide Tk 50 million while the rest will come in the form of project aid. The Bangladesh Bridge Authority (BBA) invited the pre-qualification tender for the project in April 2010.] Construction of the bridge was expected to commence by early 2011 and be ready for major completion in 2013 (and complete all sections by late 2015). The proposed Padma Multipurpose Bridge Project will provide direct connectivity between the central and southwestern part of the country through a fixed link on the Padma River at Mawa-Janjira points. The bridge will contribute significantly towards facilitating the social, economic and industrial development of this relatively underdeveloped region with a population of over 30 million. The area of influence of the direct benefit of the project is about 44,000 km2 or 29% of the total area of Bangladesh. Therefore, the project is viewed as very important infrastructure towards improving the transportation network and regional economic development of the country. The bridge has provisions for rail, gas, electric line and fibre optic cable for future expansion. The project will be co-financed by the government of Bangladesh, the World Bank, the Asian Development Bank, the Japan International Cooperation Agency (JICA) and the Islamic Development Bank. The Bangladesh Bridge Authority is the executing agency of the project.

Padma Bridge financing vs. word-of-mouth strategy
THE Padma Bridge is a high priority national project of the Awami League government. It is a 6.15-kilometre long and 21.10-metre wide bridge with 15.1-kilometre approach roads to connect the south-western districts with the capital. It will be a very important infrastructure for economic development of more than 30 million people. The construction work of the $2.9 billion project was expected to begin in 2012 with financial assistance of the World Bank ($1.2 billion), the Asian...