Preview

Orion Controls Case

Good Essays
Open Document
Open Document
2273 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Orion Controls Case
Orion Controls Case

Executive Summary

Faced with the challenge of continuing to remain the leader in industrial valve systems, Orion Controls is required to decide whether or not to carry out product improvement redesigns. A successful redesign will secure the company an initial level of sales of 50 or 90 units to two new customers followed by the benefits of enjoying an innovator’s reputation.

An expected profit of $262,900 resulting from a product redesign given the information available with Orion and current commitments, the company is advised to carry out the redesign and sell to Avion Chemicals and Kemikal. Orion can make a profit of up to $655,000 if successful in achieving dramatic changes in its existing model SV44A-10 given successful software upgrade adopting the short-cut approach. With hitches through the software upgrade and product redesign, Orion might achieve lower profits or even incur losses, the worst scenario being a loss to the tune of $440,000 should the software update as well as product redesign both fail.

There is a 72% chance that Orion will make a profit; however, a 28% chance it will incur losses. The benefits clearly outweigh the losses, making this a favorable project for the company. Another advantage is that the company might be able to recover all of its redesign expenses thereby making upcoming production and sales more profitable in the future. The premium of being the innovating company is high.
Companies must invest in Research & Development. Orion is a $600 million company and a R&D cost of $440,000 (the maximum cost to produce the valve) is a relatively minor cost.
Body

This report presents profitability possibilities, risks and detailed analyses to assist Orion Controls to decide whether or not it should invest in improving its existing smart valve systems SV44A-10. Orion has contracted with Avion to redesign its current valve system whereby Avion will purchase 50 units of the redesigned valve

You May Also Find These Documents Helpful

  • Good Essays

    Orion Controls Case

    • 653 Words
    • 3 Pages

    There are two factors we need to reconsider and evaluate if we go for building new valve: percentage of premium and the possibility for successful shortcut software development. One of Orion’s biggest risks involves the software development. Using a short-cut approach and developing the software within three months, the software development phase of the project has a 75% chance of being completed at a cost of $120,000. However, if they are unsuccessful, it will cost Orion three times as much, i.e., $360,000 and take eight months to complete. If the possibility for success will increase from 75% to 80%, the EMV of building new valve will go up from $105,500 to $117,500. In addition, if both Gide and Armstrong agree to pay a 110% premium for a dramatically improved valve and 10% premium for a modestly improved one instead of the original proposal, the EMV will significantly go up to $144,500 (See Figure 2).…

    • 653 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    AstroPower Case

    • 2789 Words
    • 20 Pages

    market share (Figure 1). The firm supplied products worldwide, and had regional offices in the US,…

    • 2789 Words
    • 20 Pages
    Powerful Essays
  • Better Essays

    Executive Summary Project management is the science of planning, organizing, executing, and managing the resources needed to achieve a specific goal. Effective project managers (PM) strategically facilitate the entire project management process to ensure the project’s success. To do this the PM must adequately meet the specific requirements (i.e., time, scope, quality, and cost) set forth by the project and its stakeholders. It is theorized that PM must possess a set of core competencies in order to successfully manage a project. Those competencies are development of project management knowledge areas, application of appropriate project management tools and techniques, understanding of the project environment, possession of leadership skills, and general managerial and human relations skills. This paper will critically analyze the performance of a newly appointed project manager, Gary Allison, through his response to various issues that arose during the management of The Orion Shield Project. In my analysis, I will thoroughly discuss the technical, ethical, legal, contractual, and change issues and Gary’s response to each. I will conclude my analysis with a reasoned deduction of what competencies Gary lacks that prohibit him from being an effective project manager.…

    • 1613 Words
    • 7 Pages
    Better Essays
  • Powerful Essays

    Wilkerson Case Study1

    • 1513 Words
    • 9 Pages

    1. Valves- high quality and highest tolerances in the industry; this product is what the company started from.…

    • 1513 Words
    • 9 Pages
    Powerful Essays
  • Good Essays

    Destin Brass

    • 853 Words
    • 4 Pages

    Based on the information in the case, the cost of valves is $39, the cost of pumps is $81 and the costs of flow controllers is $147. The breakdown of the analysis is below.…

    • 853 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    Destin Brass Essay

    • 460 Words
    • 2 Pages

    If you take a look at Exhibit 2, you can see the new costing Activity-Based Costing (ABC) System that we are proposing should be used to cost and price your products. The new costing system estimates the cost of the valves to be $37.75, the pumps to be $48.87, and the Flow Controllers to be $100.57.…

    • 460 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    with a number of strategic issues facing a capital-intensive, mature industry. Their product costing system was…

    • 2271 Words
    • 13 Pages
    Powerful Essays
  • Better Essays

    The 255 and Performa series provide water conditioning professionals with a valve solution for virtually every residential application. • Engineered to outperform other brands in performance and service life • Built with the business professional in mind – fast installation and quicker service calls increase profit • Multiple controller options available at a variety of price points • Noryl®, the thermoplastic resin developed by GE, provides exceptional corrosion resistance…

    • 1578 Words
    • 7 Pages
    Better Essays
  • Good Essays

    Miss

    • 800 Words
    • 4 Pages

    ORION system had just been awarded the government contract to build the next generation of high-speed, light-rail trains. The project would be a high-profile project that would affect procurement of future contracts with the government.…

    • 800 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    set points, sensors, and control valves as a result of the methodical analysis, testing, modeling, and prototyping that are part of the best practices…

    • 1310 Words
    • 6 Pages
    Powerful Essays
  • Satisfactory Essays

    Managerial Prospective

    • 393 Words
    • 2 Pages

    R&D activities fall into four pools. The four activity pools are market analysis, product design, product development, and prototype testing. The annual costs are $1,050,000 for market analysis, $2,350,000 for product design, $3,600,000 for product development, and $1,400,000 for prototype testing. The total estimated drivers for each activity are 15,000 hours of market analysis, 2,500 designs, 90 products, and 500 tests. Per the computed activity-based overhead rate for each activity cost pool, market analysis is $70 per order including 940 product designs with 40,000 products, and an estimated 2800 tests. With these alarming numbers, R&D management has decided to explore different possibilities.…

    • 393 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Doc1

    • 1320 Words
    • 6 Pages

    Assumptions 3 8.4 The Project Plan 3 8.5 Quality Responsibilities 3 8.6 Key Product Quality and Acceptance Criteria 3 8.7 Tolerances 3 8.8 Standards 3 8.9 Quality Control and Audit Processes 3 8.10 Change Management Procedures 3 8.11 Configuration Management Plan 3 8.12...…

    • 1320 Words
    • 6 Pages
    Satisfactory Essays
  • Good Essays

    case: CMI

    • 4826 Words
    • 36 Pages

    The company’s big boost came with the introduction of exhaust gas recirculation (EGR) valves on…

    • 4826 Words
    • 36 Pages
    Good Essays
  • Satisfactory Essays

    Valve as one of the key devices in flow control system is principally applied in petroleum & gas, energy & power and chemical areas. Subject to slackening economic growth and weakening downstream demand around the globe, sales of valve industry worldwide posted a CAGR of merely 3.3% during 2008-2013.…

    • 706 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    Currently, USS’s continuous flow manufacturing system is a critical (key) component of its business. As mentioned in the case, USS manages its entire supply chain via a single integrated system.…

    • 891 Words
    • 4 Pages
    Good Essays