FACILITY
• 7,000 guest rooms across 5 separate buildings
• City Center resort & casino will tower 60 stories
• 165,000 sq ft casino
• 70,000 sq ft spa
• 2,000 sq ft theatre
PROJECT SCOPE
Hollow Metal Doors, Hollow Metal Frames, Architectural Wood Doors, Architectural Hardware, Rolling Steel Doors, Architectural Mouldings and Trim.
Project Owner: MGM Mirage
General Contractor: Perini Construction Architect: HKS Architects, Inc. Project Amount: $9.8 Billion
Completion Date: December 2009
60% of the remains of the former hotel that occupied the lot, The Boardwalk hotel, were used for the construction of the