Jha of Cable Laying and Pulling

Topics: Occupational safety and health, Personal protective equipment, Cable Pages: 3 (472 words) Published: December 22, 2012
JOB HAZARD ANALYSIS AND CONTROL PROGRAMME

ELECTRICAL INSTALLATION

|ITEM # |ACTIVITY |HAZARDS |CONTROL MEASURES | |1. |CABLE LAYING AND PULLING. |BODY INJURIES |Personnel shall wear Personal Protective Equipment such as Hardhat, Eye Protection, Hand Gloves and Safety Shoes during CABLE LAYING,| | | | |PULLING and or TERMINATION. | | | | |Supervisor or Foreman shall give TOOLBOX talk to his workers prior to start of work. | | | |CABLE DRUM FALLING |Cable Drum’s Steel Roller shall be provided with END STOPPER to prevent cable drum from falling. | | | | |Do not use Steel Roller made of RSC or Pipe tubing. | | | | |Assessment of the weight of cable to be pulled and numbers of workers required shall be defined. | | | | |Workers shall keep distances to the cable drum being pulled. | | | |...
Continue Reading

Please join StudyMode to read the full document

You May Also Find These Documents Helpful

  • QSFP Cables • QSFP+ Cables Essay
  • cables Research Paper
  • Pulling the Plug Essay
  • BRB CABLES Essay
  • Essay on Ace Cable
  • Essay on Cable Codes
  • Essay on Coaxial Cable
  • Essay on Jumper Cables

Become a StudyMode Member

Sign Up - It's Free