SUMMER TRAINING REPORT SUBMITTED TOWARDS THE PARTIAL FULFILLMENT OF POST GRADUATE DEGREE IN INTERNATIONAL BUSINESS

Development and Deployment of Project Management Application and Management Information System For Public Works Department Uttarakhand AT

MBA-IB (2006-2008) Roll No. : A1802006276 (E25)

SUBMITTED BY: SACHIN GUPTA

Mr. Satish K. Tiwari Project Leader, Tata Consultancy Services Limited, Lucknow.

INDUSTRY GUIDE:

FACULTY GUIDE:

Prof. Ravi Prakash Assistant Professor, AIBS, Amity University, NOIDA.

AMITY UNIVERSITY – UTTAR PRADESH

AMITY INTERNATIONAL BUSINESS SCHOOL, NOIDA

TABLE OF CONTENTS

S. No. / Section

Section / Sub-section Executive Summary Certificate From Company Certificate Of Origin Acknowledgement

Page Number 4 8 9 10 11 12 15 21 28 31 32 35 37 46 49 79 83 85 86 87 89 90 91 92 93 94 97 98 99 101 2

A A.1 A.2 A.3 A.4 A.5 A.6 A.7 A.8 A.9 A.10 A.11 A.12 A.13 A.14 A.15 A.16 A.17 B

“Development and Deployment of Project Management Application and Management Information System for Public Works Department Uttarakhand” Introduction To The Project IT Industry In India (Industry Profile) About Tata Consultancy Services Limited (Company Profile) About PWD Uttarakhand (Client Profile) Internship Learning Objectives System Development Life Cycle Of The Project Front End And Back End Design (Tools Used For Development) System Analysis Proposed Architecture And Platform System Design System Testing System Implementation The Recommendations The Responsibilities And Works Assigned To Me Learning During The Internship Initiatives Taken By Me Conclusion “Finding Reasons For Delay In Page Loading Time In IBM Web Sphere Portal” (Research Analysis) Executive Summary Introduction Research Methodology Critical Review Of The Literature About Tata Consultancy Services Limited (Company Profile) IT Industry In India (Industry Profile) SWOT Analysis

B.1 B.2 B.3 B.4 B.5 B.6

B.7 B.8 B.9 B.10 C

The Research Data Findings And Analysis Recommendations Bibliography & References

103 104 109 110

“Creating a Road-map for making an Integrated Organization 111 - UAPWD Vs TCS” (Case Study) Annexure D.1 D.2 Synopsis Of The Project Work Logs 121 122 124

D

3

EXECUTIVE SUMMARY

The customized solution developing and deployment takes so much of functional and technical analysis of the existing system and the requirements of the client which gives the brain good moves for enhancing the analytical ability. And the experience of working in such a project gets even better and challenging when the client-side is tuff and developers are the best on their part. This two months period has been a tremendous time for me working with Tata Consultancy Services Limited in a software development project in which they were developing an online project management application and management information system for public works department (UAPWD) uttarakhand state government. The primary objective for developing the online application at such a big scale is to reduce the time and manpower required for maintaining the project management as well as management related data for the public works department. The online software, which is designed to run on LinuxTM and MS WindowsTM both platforms, is being developed in Java Server Pages (JSP) using the J2EE (Java 2 Enterprise Edition) technology coordinating with the IBM WebSphere portal server to run the JSP portlets. The Oracle server has been used as the backend database handler. The entire project is divided into 12 modules based on the functional sub-systems of the various sub-departments and offices of public works department (UAPWD). The public works department is a premier department of government of uttarakhand which takes care of the various construction, development and maintenance projects of the public utility. It is working towards making the public utility services better and better over time. Since the department has joint ventures with...