Specialist Diploma in Workplace Safety & Health Course
PROJECT REPORT
COURSE

Specialist Diploma in Workplace Safety & Health Course
Competency Unit

Construction Elective Manage WSH Risk In Construction Industries

Submitted By Name NRIC : Mohd Ali Bin Supati : S7402037B

Student Id : S10071529 Contact no.: +62 811 700 2102

Trainer/Assessor Mr. Tan Aik Nan DATE 01102009

Elective Unit : Manage WSH Risk In Construction Industries

Page 1

Elective Unit: Manage WSH Risks in Construction Industries Project Report This Report defines the works carried out by PT. McConnell Dowell Services in the fabrication of pipe modules in Batam Fabrication Facility. It covers the nature, hazards, controls and legislative compliance in ensuring the safe operations in the delivery of final products to satisfied clients.
Work Activities Inventory

Company

Person-in-Charge/Inspector

Date

PT. McConnell Dowell Services

Mohd Ali Supati

30 Sep 2009

Worksite: PARS Project – Batam Fabrication Facility S/No 1 Location/Process PARS Project Assembly Area Architectural and finishing works Painting works on the fabricated spool joints for finishing Work Activities

a. Wire brushing of welded joints on the fabricated spool. b. Cleaning welded joint section using solvent prior paint application. c. Applying paint onto the welded joints.

2

PARS Project Assembly Area Civil and Structural works Steel structure fit up for fabrication

a. Selection of approved lifting gears used for putting the steel beam in position for fabrication. b. Apply softeners at the edges of the beam before rigging with flat slings. c. Anchor beam clamp above the beam where lever or chain block needs to be hanged.

d. Hook the sling eye onto a chain or lever block. e. Lift the beam into its position and secure with G clamps. f. Protect the sling from damage from fabrication.

g. Weld the joints.

3

Fabrication Workshops Mechanical and a. Installation of torches onto cylinder with hoses

Elective Unit : Manage WSH Risk

You May Also Find These Documents Helpful

  • Better Essays

    Mt 435 Unit 6 Assignment

    • 1125 Words
    • 5 Pages

    (03) Separate manufacturing areas for the snag hook anchor and the bell anchors to increase production. This will tie the technology portion as well as the new equipment portion altogether to create two separate manufacturing areas.…

    • 1125 Words
    • 5 Pages
    Better Essays
  • Good Essays

    d. Placing of a metal T square on the arrow rest and clipped to the string.…

    • 535 Words
    • 3 Pages
    Good Essays
  • Good Essays

    The classification of medicines are all related to the medicines act 1968, while working with medication it is good to have an understanding and working knowledge of the common types of medication.…

    • 866 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    Duties: Assist to day to day cleaning of rooms to high standard. Making of rota, ordering cleaning products and linens. Managing the house keeping department and reporting complaints and queries to superior authorities. Assist with all aspects of daily cleaning and in the kitchen when the need arise.…

    • 350 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Unit 8 Lab 1

    • 662 Words
    • 2 Pages

    3. Install strain relief boot on cable end, small diameter first; must be placed on the cable first before connector.…

    • 662 Words
    • 2 Pages
    Good Essays
  • Powerful Essays

    Unit Title: Unit sector reference: Level: Credit value: Guided learning hours: Unit expiry date: Unit accreditation number:…

    • 2792 Words
    • 12 Pages
    Powerful Essays
  • Satisfactory Essays

    1. Assemble apparatus as shown, making sure the meter ruler is absolutely vertical, and that the clamps of the retort stand are tightened enough to hold the apparatus in place.…

    • 406 Words
    • 2 Pages
    Satisfactory Essays
  • Better Essays

    The apparatus involved a mild steel portal frame, which had been clamped into a loading rig…

    • 1039 Words
    • 5 Pages
    Better Essays
  • Satisfactory Essays

    Donner

    • 357 Words
    • 4 Pages

    Donner Company. Yan Anantakusumo Yudistiawan Septima Nurlailia Rizki Setyo P Company History  Donner Company, started in 1985, manufactures printed circuit boards, technically called as “soldermask overbare copper” boards  It faces a competition from around 750 manufacturers in United States.  The firm has developed new processes and application and holds patents for these.…

    • 357 Words
    • 4 Pages
    Satisfactory Essays
  • Good Essays

    Suspension Bridge

    • 517 Words
    • 3 Pages

    The main cables are stretched from one anchor over the tops of the tower(s) and attached to the opposite anchor. The cables pass over a special structure known as a saddle (illustration #2.) The saddle allows the cables to slide as loads pull from one side or the other and to smoothly transfer the load from the cables to the tower.…

    • 517 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Kiln Shell Replacement

    • 771 Words
    • 4 Pages

    1. V-Groove preparation of New Shell. 2. Assembly of New Shell. 3. Run-out measurement of Old shell. 4. Obstruction while shell removal. 5. Marking and cutting of Old shell. 6. V-Groove preparation of old shell. 7. Positioning of new shell. 8. Alignment of New shell using aligning blocks and Clits. 9. Piano wire reading. 10. Welding of shells. 11. Non-destructive testing.…

    • 771 Words
    • 4 Pages
    Satisfactory Essays
  • Better Essays

    Manufacturing ProcessSee Appendix A for the detailed manufacturing process. In short, fasteners begin as wires, rods and bars which are then cut to length, headed and finally threaded. What should be noted is that this particular manufacturing process called cold forming is high-speed, high-volume, economical and has low wastage. Such economies of scale will allow Berkshire to offset the very high costs of cold-forming equipment.…

    • 3559 Words
    • 11 Pages
    Better Essays
  • Satisfactory Essays

    Beam Experiment

    • 890 Words
    • 4 Pages

    Set up the beam AC with a span of 675mm (as shown in Figure 1).…

    • 890 Words
    • 4 Pages
    Satisfactory Essays
  • Good Essays

    3 . Installation site needs to have sufficient lifting capacity of lifting equipment . Hanging in the rope on both sides of the body lugs ( not hanging other parts ) , between the side plates 120 × 120 square timber with a support to prevent distortion.…

    • 425 Words
    • 2 Pages
    Good Essays
  • Powerful Essays

    Project Report Escorts

    • 1615 Words
    • 7 Pages

    Certified that the Mini Project work entitled “Welding and Fabrication” is a bonafide work carried out by Rishabh Shah-1RV08IM053 in partial fulfilment of the academic requirements of VII semester in the engineering course in Industrial Engineering and Management during the year 2010-11.…

    • 1615 Words
    • 7 Pages
    Powerful Essays