Feasibility Study

Topics: Tour de Georgia, The Alternative, Environment Pages: 10 (1544 words) Published: July 23, 2013
FEASIBILITY

STUDY

Project or System Name

Computer Engineering Department
Bulacan State University

Month, Year
FEASIBILITY STUDY

TABLE OF CONTENTS

Page #

1.0GENERAL INFORMATION1-1

1.1Purpose1-1
1.2Scope1-1
1.3System Overview1-1
1.4Project References1-1
1.5Acronyms and Abbreviations1-1
1.6Points of Contact1-1
1.6.1Information1-1
1.6.2Coordination1-1

2.0MANAGEMENT SUMMARY2-1

2.1Environment2-1
2.1.1Organizations Involved2-1
2.1.2Input/Output2-1
2.1.3Processing2-1
2.1.4Security2-1
2.1.5System Interaction2-1
2.1.6Physical Environment2-1
2.2Current Functional Procedures2-1
2.3Functional Objectives2-1
2.4Performance Objectives2-1
2.5Assumptions and Constraints2-1
2.6Methodology2-1
2.7Evaluation Criteria2-1
2.8Recommendation2-1

Page #

3.0PROPOSED SYSTEM3-1

3.1Description of Proposed System3-1
3.2Improvements3-1
3.3Time and Resource Costs3-1
3.4Impacts3-1
3.4.1Equipment Impacts3-1
3.4.2Software Impacts3-1
3.4.3Organizational Impacts3-1
3.4.4Operational Impacts3-1
3.4.5Developmental Impacts3-1
3.4.6Site or Facility Impacts3-1
3.4.7Security and Privacy Impacts3-1
3.5Rationale for Recommendations3-1

4.0ALTERNATIVE SYSTEMS4-1

4.xDescription of [Alternative System Name]4-1

1.0GENERAL INFORMATION

NOTE TO AUTHOR: Highlighted, italicized text throughout this template is provided solely as background information to assist you in creating this document. Please delete all such text, as well as the instructions in each section, prior to submitting this document. ONLY YOUR PROJECT-SPECIFIC INFORMATION SHOULD APPEAR IN THE FINAL VERSION OF THIS DOCUMENT.

The Feasibility Study is used to provide an analysis of the objectives, requirements, and system concepts of the proposed system, including justification, schedule, and end products. During this analysis, the objectives of the system are defined based on the needed functions described previously. Included in these system objectives are the high-level functional and performance objectives and any assumptions and constraints. When the system objectives have been identified, the various alternatives for satisfying those objectives are determined. For each alternative, the costs in time and resources are estimated. A determination is then made as to the most feasible development alternative.

GENERAL INFORMATION

1 1.1Purpose

Describe the purpose of the Feasibility Study.

2 1.2Scope

Describe the scope of the Feasibility Study as it relates to the project.

3 1.3System Overview

Provide a brief system overview description as a point of reference for the remainder of the document. In addition, include the following:

1. Responsible organization
2. System name or title
3. System code
4. System category
1. Major application: performs clearly defined functions for which there is a readily identifiable security consideration and need 2. General support system: provides general ADP or network support for a variety of users and applications

5. Operational status
3. Operational
4. Under development
5. Undergoing a major modification
6. System environment or special conditions

4 1.4Project References

Provide a list of the references that were used in preparation of this document. Examples of references are:

7. Previously developed documents relating to the project 8. Documentation concerning related projects

5 1.5Acronyms and Abbreviations

Provide a list of the acronyms and abbreviations used in this...
Continue Reading

Please join StudyMode to read the full document

You May Also Find These Documents Helpful

  • Boeing Perrier Case Study Essay
  • What Is Feasibility Study? Essay
  • Essay on Case Study Mercy Corps
  • Ms Consultancy Case Study Essay
  • Eden Project Case Study Essay
  • Contents of Project Study 1 Essay
  • Case Study Guide Ukzn Westville South Africa Essay
  • Drexler’s World Famous Bar-B-Que Case Study Essay

Become a StudyMode Member

Sign Up - It's Free