ICo5

1542''BUILDING COST INFORMATION CENTRE
ELEMENTAL COST ANALYSIS - Form 1

F-Educational, Cultural, Scientific Buildings

JOB TITLE
LOCATION

I

IA-3-2125
CLIENT:
TENDER DATE:

Cadangan Membina Bangunan 3 Tingkat Pusat Asuhan Kanak-Kanak & Tadika Mukim Setapak, Kuala Lumpur

Private
12 April 1999

INFORMATION ON TOTAL PROJECT
Project and Contract information
Project Details and Site Condition:

Contract:

The Project comprises the construction and completion of one block of 3

Standard Form of Contract P. W.D Form 203A (Rev 10/83)

storey childcare centre and kindergarten building complete with

With quantities

infrastructure and external works. The Site is located within the existing

Period of honouring certificates - 30 days from date of Architect's Certificates

campus area is accessible via the campus main entrance.
Market Condition:

Competitive

Contract Particulars:

Com~etitive

Cost Fluctuation:

P'wD. 203A (Rev 10/83)

Basis of Tender

Yes

QJ

RM
1,657,244.85

Open/Selected

Sched. Of Rate/
Spec. & Drawings

Negotiated

QJ

Private

D

Provisional Sum

RM

Prime Cost Sum

RM
RM

Contingencies

RM

-

RM

1,657,244.85

QJ

Competition

0
0

Contract Period Stip. by Client:

L

QJ

Serial

Int/(JV)/L

0

Contract Sum

Bills Of Appr. Quant.

D

Government

Preliminaries

Bills Of Quantities

Tender List

0

No

Type of Contract:

44 wks

225,000.00
134,074.56

Contract Period Offered by Bulider:
Number Of Tenders Issued:

1

Number Of Tenders Received:

1
ANALYSIS OF SINGLE BUILDING
Design/Shape Information

Accommodation and Design Features:
Administration Office, Classrooms,library,Dining Hall, Kitchen, Store and Toilet. The building is almost U-Shape on plan and measures approximately 39M long x 37M wide.
Areas:



Design/Sha~e:

Functional
U nit:

Lower Ground Floor

1393.30 M2
Percentage of Gross Floor Area

m2

Ground Floor

730.00 m2

Upper Floor

1,395.00 m2

GROSS FLOOR AREA

1,393.30 m2

=

1,227.00

2,125.00 m2

Usable Area

External Wall Area

a)

=

Below Grd. Floor

-%

b)

2,125.00

Gross Floor Area

Single-storey

2%

c)

2-storey

-%

d)

3-storey

98%

- e)

4-storey

-%

.577

Storell Heights

Circulation Area

528.72 m2

Av. Below Grd. Level

Ancillary Area

194.84 m2

At. Grd. Floor

3.50m

At 1st Floor

3.00m

Above 1st Floor

3.00m

Internal division

8.14 m2

GROSS FLOOR AREA

2,125.00 m2

Floor Space NOT Enclosed

m2

Roof Area

916.00 m2

(Structural & Plant Rooms)
Brief Cost Information
Contract Sum

RM

Provisional Sum

RM

225,000.00

Prime Cost Sum

RM

Preliminaries

RM

Contingencies

RM

Functional Unit Cost

1,657,244.85

Contract Sum less Contingencies

134,074.56

excluding external works:

being
being

RM

1,657,244.85

8.80 % of remainder
- % of Contract Sum

1,052.11 per m2

·.

BUILDING COST INFORMATION CENTRE
ELEMENTAL COST ANALYSIS· Form 2

7 - Educational, Cultural, Scientific Buildings
A-3-2125

SUMMARY OF ELEMENT COSTS
GROSS FLOOR AREA:

TENDER DATE:

2,125.00 m2

12 April 1999

Preliminaries Shown Separately
Total Cost Of
Element
RM

1

Piling

1B

Work Below Lowest Floor Finish

Element
Unit
Quantity
tracking img