Decision Analysis Study Guide Scheduling

Only available on StudyMode
  • Download(s) : 115
  • Published : January 5, 2012
Open Document
Text Preview
this is the best study guide I could find. Just match the questions with the answers for the study guide.

Chapter 15: Multiple Choice Questions 1. Which of the following is true regarding forward scheduling? Forward scheduling is the scheduling of a. the end items or finished products b. jobs as soon as the requirements are known c. the start items or component parts d. the final operation first beginning with the due date Which of the following best describes how short-term schedules are prepared? Short-term schedules are prepared a. directly from the aggregate plans b. directly from the capacity plans c. from inventory records for items that have been used up d. from master schedules which are derived from aggregate plans Which scheduling technique should be employed when due dates are important for a job order? a. forward scheduling b. loading c. dispatching d. backward scheduling e. master scheduling Which of the following is not an effectiveness criterion for scheduling? a. maximizing flow time b. minimizing completion time c. minimizing WIP inventory d. maximizing utilization Forward scheduling a. begins with a delivery date, then each operation is offset one at a time, in reverse order b. is well suited where the supplier is usually able to meet precise delivery dates c. tends to minimize in-process inventory d. assumes that procurement of material and operations start as soon as requirements are known Which file contains important information regarding an item's flow through the shop? a. routing file b. work center master file c. control files d. item master file Which of these is not part of the planning files of a production planning and control system? a. a progress file b. a work center master file c. an item master file d. a routing file Which of the following files tracks work order progress? a. work center master files b. routing files c. item master files d. control files









The production database containing information about each of the components that a firm produces or purchases is the a. routing file b. work center master file c. control file d. item master file The short-term scheduling activity called loading a. assigns dates to specific jobs or operations steps b. specifies the order in which jobs should be done at each center c. assigns jobs to work centers d. assigns workers to jobs The assignment method is a. a method to highlight overloads in a given work center b. a computerized method of determining appropriate tasks for an operation c. a form of linear programming for optimally assigning tasks or jobs to resources d. the same thing as the Gantt schedule chart A scheduling technique used to achieve optimum, one-to-one matching of tasks and resources is a. the assignment method b. Johnson's rule c. the CDS Algorithm d. the appointment method Which of the following is an aid used to monitor jobs in process? a. a Gantt load chart b. the assignment method c. a Gantt schedule chart d. Johnson's Rule If an assignment problem consists of 6 workers and 7 projects, a. one worker will not get a project assignment b. one worker will be assigned two projects c. each worker will contribute work toward the seventh project d. one project will not get a worker assigned Orders are processed in the sequence in which they arrive if (the) ______ rule sequences the jobs. a. earliest due date b. slack time remaining c. first come, first serve d. critical ratio







16. Which of the following dispatching rules ordinarily gives the best results when the criterion is lowest time for completion of the full sequence of jobs? a. shortest processing time (SPT) b. critical ratio (CR) c. first in, first out (FIFO) d. first come, first serve (FCFS) 17. Sequencing (or dispatching) a. assigns dates to specific jobs or operations steps b. assigns jobs to work centers c. specifies the order in which jobs should be done at each center d....