Cranberry Litlefield Simulation
Littlefield Technologies Simulation Report

Team Name
Group A

Section
Operations Management
September 2012

Problem Statement

Littlefield Technologies is a low volume, high margin manufacturer and distributor of digital satellite system receivers. Littlefield Technologies seeks to minimize production costs and sell at the highest price the market will allow, with the end result of maximizing profit, or value for shareholders.

In order to be successful they needed to maximize utilization of every stage of the process from inventory control to shipping. With the negotiated contracts available in order to maximize profits Littlefield has little room for inefficiencies and must meet all delivery requirements.

At the time of change over, Littlefield was not maximizing the capacity of the plant. It was not effectively processing items through station 2 and was exceeding the utilization of all stations in the production process. In addition, it did not have a delivery agreement with suppliers that would maximize raw product inflows at the least cost. Finally it did not have a contract negotiated with customers that maximized the price the market was willing to bear given taking into account the order lead time the customers required.

Capacity Management

In order to determine the number of machines to purchase for each station we started by pulling all historical data for the plant to analyze the potential bottlenecks. We analyzed the utilization and capacity of each station and determined the current number of machines was inadequate and would not meet demand even if inventory levels were under control.

We started with only adding one additional machine to station 1 which had a large backlog, had the highest utilization, and was the starting point for the production process. Soon after we noted the backlog of the equipment in all other stations began to exceed station 1 so one machine was purchased for station 2

You May Also Find These Documents Helpful

  • Good Essays

    Unit 3 Ip Econ 220

    • 697 Words
    • 3 Pages

    This paper will provide an analysis of 2 production scenarios. We will calculate costs associated with running a production facility. Furthermore, the analysis will be used to provide a basic understanding of how changes in staffing and productivity impact profit and loss.…

    • 697 Words
    • 3 Pages
    Good Essays
  • Good Essays

    A. Calculate the capacity of each machine center and the capacity of the system. Machine Center…

    • 783 Words
    • 3 Pages
    Good Essays
  • Best Essays

    Traffic Simulation

    • 1468 Words
    • 6 Pages

    A toll bridge spans the Black Warrior River connecting Interstate 20/59 to Northport, Alabama. The bridge is privately owned by Tuscaloosa By-Pass and its website is http://www.tuscaloosabypass.com/Default.aspx. The bridge was installed as a means of streamlining and expediting traffic to Northport and reducing truck traffic from the…

    • 1468 Words
    • 6 Pages
    Best Essays
  • Good Essays

    The machines from Guarulhos were stated to be more reliable than the current machines in Jaboatão. A partly or a complete takeover of these machines would allow to adapt to the needed capacity. Unused machines could be sold.…

    • 1193 Words
    • 5 Pages
    Good Essays
  • Satisfactory Essays

    The Goal Book Questions

    • 558 Words
    • 3 Pages

    There were many problems with the company. The company did not have a concrete process that was aligned with the goal. Some of the problems is increased inventories, increased operational expenses and reduced throughput. The company's focus was only on increasing efficiencies. The reason behind this to be more specific, is the installment of new robots that were used to produce more and more finished goods that were not needed in the market and in the case of products needed, there aren't any parts that were available. The plant was unbalanced as it was not balancing the capacity of its resources with the demand from the market. Another reason are bottlenecks that the plant had to deal with.…

    • 558 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    Bayonne Case

    • 3035 Words
    • 13 Pages

    First of all we started to answer the guideline questions. We computed the current capacity utilization in the work centres, and then we found the capacity in pieces of the die-cut work centres, in the different ganging choices (no gangins, ganging pairs of orders or ganging all of the orders). After this we had to focus on the differences between partialed and non-partialed orders of the Royal/Queen work centres so we could analyze the changes in capacity. Concerning the Fold&Glue department, Bayonne Inc. can choose between Royal/Queen and Staude machines, we computed the optimum batch quantity, according to orders’ volume. To conclude about the efficiency of some work centres we…

    • 3035 Words
    • 13 Pages
    Powerful Essays
  • Good Essays

    Fondiera Di Torino Spa

    • 1110 Words
    • 6 Pages

    2) Operating cash flow for the company for the both machines across their useful lives i.e. 6 remaining years for semi-automated machine and 8 years for Vulcan Mold maker…

    • 1110 Words
    • 6 Pages
    Good Essays
  • Satisfactory Essays

    Allan

    • 476 Words
    • 3 Pages

    An ability to use and apply advanced methods to optimize technical management decision making, and…

    • 476 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Operation Management

    • 538 Words
    • 3 Pages

    |Trident University Module 1 Case Assignment 1Course Number: OPM300Intro. to Operations Mgmt Professor: Dr. Nicholas BowersoxDate: 10 April 2013…

    • 538 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    The scarcity of resources, time, ease of implementation and costs has always been a major…

    • 1194 Words
    • 5 Pages
    Good Essays
  • Good Essays

    Capacity

    • 2643 Words
    • 12 Pages

    Some procedural strategy can be adopted to minimize ill effects of capacity-related problems. Foremost should be a credible forecast of demand which will subsequently be the basis of ascertaining the capacity requirement. It is as well relevant to know the type of capacity required and the time when it is needed. To properly choose the most desirable capacity plan, alternatives must be made. These alternatives should be each evaluated on the basis of efficiency and technical capability.…

    • 2643 Words
    • 12 Pages
    Good Essays
  • Good Essays

    case

    • 934 Words
    • 4 Pages

    demand in the last decade. The company has three main plants that are dedicated to produce two…

    • 934 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    Hakuto Singapore Problem

    • 400 Words
    • 2 Pages

    What do you think was the reason for introducing an additional machine and expand capacity each time?…

    • 400 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Operations Management

    • 2465 Words
    • 14 Pages

    principles and best practices related to managing operations. It is designed to serve as the…

    • 2465 Words
    • 14 Pages
    Powerful Essays
  • Powerful Essays

    Following satisfactory technical validation and market research, additional capital injection is required to build up a small network of stations. Extensive hardware and software testing and modification will be conducted.…

    • 950 Words
    • 4 Pages
    Powerful Essays