University Of Arizona
2011 ASME Human Power Vehicle – Utility Class
Critical Design Report
Team 4674
December 2, 2010
Rev-8
Sami Abbas – Team - Correspondence Lead
Roy Green – Mechanical Lead
Christian Schultz – Resource Utilization Lead
Andrew Laverty – Documentation Lead
Josh Kaliszewski – Electrical Lead
[pic]
Table of Contents
1. Introduction 3
i. Scope of the document 3
ii. Changes made since Preliminary Design Review 3
iii. Problem statement and background information 3
iv. Scope of Project 3
v. What is and what is not going to be accomplished 4
vi. What the product is expected to do 4
vii. Description of customer 4
2. System Requirements 5
i. Summary of the requirements 5
3. Summary of Preliminary Design Results 5
i. Concepts considered 5
ii. Preferred concept 6
iii. Changes since PDR 7
4. Top-level Design of Final Design Concept 8
i. Overview of system 8
5. Subsystem/Sub-assembly and Interface Design (Hardware) 10
i. Drive Train 10
ii. Fairing 11
iii. Aerodynamics: 12
iv. Electrical 13
v. Brakes 18
vi. Steering 20
vii. Regenerative energy 21
viii. Center of gravity 23
ix. Frame 24
x. Roll cage 24
xi. Wheel Design 26
xii. Suspension 27
6. Algorithm Description and Interface Document (Software) 28
i. Describe each module in detail (N/A) 29
ii. Electrical flow diagrams (N/A) 29
iii. Give basis for the number of lines of code estimate (N/A) 29
iv. Trade studies and analysis (N/A) 29
v. Technical interface information (N/A) 29
vi. Input and output files (N/A) 29
7. Analysis 29
i. System Performance Analysis 29
8. Development Plan 29
i. Build Milestones 29
9. Budget and Suppliers 30
i. Budget 30
ii. Bill of Materials. 30
iii. Estimated cost and delivery dates of the components 31
iv. Long-lead-time items 31
10. Requirements Review / Acceptance Test Plan 31
11. Summary... [continues]
2011 ASME Human Power Vehicle – Utility Class
Critical Design Report
Team 4674
December 2, 2010
Rev-8
Sami Abbas – Team - Correspondence Lead
Roy Green – Mechanical Lead
Christian Schultz – Resource Utilization Lead
Andrew Laverty – Documentation Lead
Josh Kaliszewski – Electrical Lead
[pic]
Table of Contents
1. Introduction 3
i. Scope of the document 3
ii. Changes made since Preliminary Design Review 3
iii. Problem statement and background information 3
iv. Scope of Project 3
v. What is and what is not going to be accomplished 4
vi. What the product is expected to do 4
vii. Description of customer 4
2. System Requirements 5
i. Summary of the requirements 5
3. Summary of Preliminary Design Results 5
i. Concepts considered 5
ii. Preferred concept 6
iii. Changes since PDR 7
4. Top-level Design of Final Design Concept 8
i. Overview of system 8
5. Subsystem/Sub-assembly and Interface Design (Hardware) 10
i. Drive Train 10
ii. Fairing 11
iii. Aerodynamics: 12
iv. Electrical 13
v. Brakes 18
vi. Steering 20
vii. Regenerative energy 21
viii. Center of gravity 23
ix. Frame 24
x. Roll cage 24
xi. Wheel Design 26
xii. Suspension 27
6. Algorithm Description and Interface Document (Software) 28
i. Describe each module in detail (N/A) 29
ii. Electrical flow diagrams (N/A) 29
iii. Give basis for the number of lines of code estimate (N/A) 29
iv. Trade studies and analysis (N/A) 29
v. Technical interface information (N/A) 29
vi. Input and output files (N/A) 29
7. Analysis 29
i. System Performance Analysis 29
8. Development Plan 29
i. Build Milestones 29
9. Budget and Suppliers 30
i. Budget 30
ii. Bill of Materials. 30
iii. Estimated cost and delivery dates of the components 31
iv. Long-lead-time items 31
10. Requirements Review / Acceptance Test Plan 31
11. Summary... [continues]
Cite This Essay
- APA
-
(2011, 02). Chapter 8 Review. StudyMode.com. Retrieved 02, 2011, from http://www.studymode.com/essays/Chapter-8-Review-586316.html
- MLA
-
"Chapter 8 Review" StudyMode.com. 02 2011. 02 2011 <http://www.studymode.com/essays/Chapter-8-Review-586316.html>.
- CHICAGO
-
"Chapter 8 Review." StudyMode.com. 02, 2011. Accessed 02, 2011. http://www.studymode.com/essays/Chapter-8-Review-586316.html.