Introduction i- Rezzen Realty Sdn Bhd has appointed to manage a piece of land with size of 50 acres, into a mixed development project at Sepang. I have been requested to incorporate green concepts design and sustainable features from inception and completion into the whole project. The whole of the project divided into three (3) phases, span over 5 years. The first phase is to a proposal to construct a high rise luxury condominium project on the hilly slope. I have been requested to look into selection of suitable retaining wall system for this project.

In this assignment, I will: 1. Discuss the importance of retaining wall and construction methods 2. Illustrate and briefly elaborate the design concept of retaining wall and preventive measures to mitigate functional failures 3. Evaluate the types of retaining wall available and justify which one is the most suitable for the hilly project

The Importance of Retaining Wall The Retaining wall is a stabilizing structure that used to hold sloping ground in place. However, it is to prevent the erosion and the movement of soil. Beside that a retaining wall is a structure designed and constructed to resist the lateral pressure of soil when there is a desired change in elevation that exceed the angle of repose of the soil. To accommodate and redistribute lateral pressure caused be sloping so that the retaining wall must be firm and substantial in structure.
Allow to collect ground water to escape so it normally will design with seepage hole. To keep the retaining wall stable so it has to releases the additional pressure that created by the accumulated water.

There are several types of materials that can be used to construct a retaining wall such as stone and concrete. These two materials are the most common materials used in constructing a retaining wall. Besides that, light concrete and aggregate materials used to make special retaining walls which are designed purposely for this. Building

You May Also Find These Documents Helpful

  • Powerful Essays

    Regarding to our meeting dated July 30, 1993; WestBan Construction Limited needs City’s approval for extra time and cost to precede with additional scope of the construction work (changing slope in North and East banks, adding required shoring for stabilizing the soil, leaving shoring in the ground, pouring tank concrete walls instead of shotcrete), according to the option B for both North and East Slopes (Attachment F2), the chosen schemes for slope remedies are attached in this document.…

    • 1987 Words
    • 12 Pages
    Powerful Essays
  • Good Essays

    * Erosion along Belongil has created major obstacles for the construction of new buildings, and the preservation of pre-existing estates; with many having already been destroyed due to the instability of sand/soil structure.…

    • 783 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    adjacent structures. As an alternative, I-walls and T-walls were built. Though the T-walls, shaped like…

    • 2785 Words
    • 12 Pages
    Powerful Essays
  • Good Essays

    Task 1 And 3 Combined

    • 893 Words
    • 3 Pages

    Task 1 + 3 – Describe and compare fundamental techniques, processes, plant and materials used in groundworks, foundations and substructures.…

    • 893 Words
    • 3 Pages
    Good Essays
  • Good Essays

    It is a series of fortifications made of stone, brick, tamped earth, wood and other materials, generally built along an east to west line across the historical northern borders of china in part to protect the Chinese empire. Several walls were being built as early as the 7th century BC; these later joined together and made bigger and stronger.…

    • 529 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Gully Erosion

    • 1174 Words
    • 5 Pages

    Structures might also be required along gully floors since some grades can be quite steep and allow water to rush down under peak flows, ripping away soil and vegetation. These may take the form of rock barrages, wire netting or logs across gullies. Sediments held in the water will then be deposited along the flatter grades as a result of slower water flow, allowing vegetation to re-establish.…

    • 1174 Words
    • 5 Pages
    Good Essays
  • Good Essays

    reconstructed, other portions of the wall are in poor shape. In addition to the natural…

    • 676 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Stonewalls

    • 650 Words
    • 3 Pages

    One of the best and attractive option to build the garden or the yard is with the use of stonewalls with the help of stonemason. You can find the stones in various shapes as well as sizes. You can get your stone as per your requirement. The stone is considered to be a wonderful wall material that is used by many homeowners. It is a fact that the installation of stone walls takes lot of time but it has a lon lasting benefit. It may be used in many different ways like for example the weather conditions or the kids climbing on the walls etc. There will not be a single challenge that a stonemason cannot meet. It is very easy to maintain a stone wall and the most important thing is that you even do not have to seal or paint it. It has a natural feel and blends well with lawn and garden.…

    • 650 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Demolition Work

    • 15940 Words
    • 64 Pages

    This Code of Practice for managing health and safety risks associated with demolition work is an approved code of practice under section 274 of the Work…

    • 15940 Words
    • 64 Pages
    Powerful Essays
  • Powerful Essays

    Professional Practice Report

    • 3842 Words
    • 16 Pages

    3.1 TIMING ALLOCATION OF THE PROJECT………………………………… 3.2 COST ANALYSIS OF THE PROJECT………………………………………. 3.3 ENVIRONMENTAL IMPACTS AND LEGAL IMPLICATIONS……………… 3.4 MANAGEMENT OF THE SELECTED PROJECT…………………………… 4.0 RECOMMENDATIONS ………………………………………………………… 5.0 CONCLUSIONS……………………………………………………………………

    • 3842 Words
    • 16 Pages
    Powerful Essays
  • Better Essays

    Civil Engineering

    • 10748 Words
    • 43 Pages

    construction material are: Cement,sand ,water. Concrete, Lime, Stones, Paints and Varnishes, Wood and Timber, Engineering Metals, Bituminous materials and Plastics, Rubber and Glass, Miscelleneous materials,…

    • 10748 Words
    • 43 Pages
    Better Essays
  • Good Essays

    Louis Kahn

    • 5353 Words
    • 22 Pages

    At the start of a new commission, many architects begin their inquiry by studying the program for the proposed project. Facets of this studying might include a review of local building and zoning codes, an examination of the proposed site, including its soil and topographic conditions, and an investigation into the project’s functions, including allotted square footage and adjacencies of different uses. The client’s requests regarding the project are also considered. In short, the design process begins with a serious and studies inquiry into the project’s ‘facts’.…

    • 5353 Words
    • 22 Pages
    Good Essays
  • Powerful Essays

    NEBOSH IGC2

    • 2184 Words
    • 10 Pages

    the start of the work. The plans of the area of the excavation should be obtained. The buried services…

    • 2184 Words
    • 10 Pages
    Powerful Essays
  • Satisfactory Essays

    Engineering Geology

    • 266 Words
    • 2 Pages

    Discuss principles behind the use of seismic refraction and electrical resistivity methods in site investigation. What is the difference between resistivity profiling and Vertical electrical sounding?…

    • 266 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    With reference to the emails (2) cited above, I am enclosing herewith the list of…

    • 981 Words
    • 4 Pages
    Satisfactory Essays