Manjung Unit 4 - Malaysia
Ultra-supercritical Coal-fired power plant
South East Asia‘s first 1,000 MW ultra-supercritical coal-fired power plant
TNB Janamanjung Sdn Bhd, a subsidiary of Malaysia’s state-controlled power generation, transmission and distribution company Tenaga Nasional Bhd (TNB) has awarded the turnkey engineering, procurement and construction (EPC) contract for the Manjung 4
1,000 MW ultra-supercritical coal-fired steam power plant to Alstom and its consortium partner, China National Machinery Import and Export Corporation.
The contract follows TNB’s 1999 contract with Alstom to build the 3 x 700 MW Manjung coal-fired power plant that went into operation in 2004. These units also utilise Alstom’s clean coal combustion technology and market leading environmental control systems.
Customer: ���������������������������� TNB Janamanjung Sdn Bhd
Scope of supply: ������������������ Full turnkey EPC contract for a 1 x 1,000 MW ultra-supercritical power plant including:
- Overall plant engineering
- Global procurement and logistics
- Civil, electrical and mechanical construction
- Comprehensive commissioning of the power plant
Electrical output: ����������������� 1,000 MW
Fuel: ������������������������������������� Imported coal
Cooling System: ������������������� Direct cooling with sea water
Application: �������������������������� Power generation
TPWR/CASE/MU4MUCPP/EN/12.2013/FRA/1831
CUSTOMER BENEFITS
• High performance
• Increased operational
flexibility
• Maximised fuel flexibility
• Low NOx and SOx emissions over a wide load range
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction,