Activity Based Costing System
Activity Based Costing
[pic]
Overview of Activity Based Costing

Activity-based costing (ABC) is a methodology for more precisely allocating overhead to those items that actually use it. ABC works best in complex environments, where there are many machines and products, and tangled processes that are not easy to sort out.

Problems with Activity Based Costing

Many companies initiate ABC projects with the best of intentions, only to see a very high proportion of the projects either fail, or eventually lapse into disuse. There are several reasons for these issues, which are:

Cost pool volume. The advantage of an ABC system is the high quality of information that it produces, but this comes at the cost of using a large number of cost pools – and the more cost pools there are, the greater the cost of managing the system. To reduce this cost, run an ongoing analysis of the cost to maintain each cost pool, in comparison to the utility of the resulting information. Doing so should keep the number of cost pools down to manageable proportions. ▪ Installation time. ABC systems are notoriously difficult to install, with multi-year installations being the norm when a company attempts to install it across all product lines and facilities. For such comprehensive installations, it is difficult to maintain a high level of management and budgetary support as the months roll by without installation being completed. Success rates are much higher for smaller, more targeted ABC installations. ▪ Multi-department data sources. An ABC system may require data input from multiple departments, and each of those departments may have greater priorities than the ABC system. Thus, the larger the number of departments involved in the system, the greater the risk that data inputs will fail over time. This problem can be avoided by designing the system to only need information from the most supportive managers. ▪ Project basis. Many ABC projects are authorized on a

You May Also Find These Documents Helpful

  • Powerful Essays

    Activity Based Costing Method (ABC). ABC determines and allocates cost by activities a company executes. This generally happens in four steps: identify each activity and its associated costs, both total and indirect; estimated cost driver and quantity; allocation computation; and cost allocation to the respective activity. ABC refines the way indirect costs are allocated to production and focuses on the costs of each individual activity. Costs are also further assigned to each product within the activities and each activity has its own cost driver. Because of the specificity, active based costing provides a…

    • 1900 Words
    • 7 Pages
    Powerful Essays
  • Good Essays

    This section describes the business problem that this project was created to address. The problem may be process, technology, or product/service oriented. This section should not include any discussion related to the solution.…

    • 845 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    Acc349 Reflection Summary

    • 297 Words
    • 2 Pages

    One advantage of Activity-Based Costing system is it has more accurate overhead cost allocation because there are more cost pools, the costs in each pool are more similar, and allocation is based on activities that cause overhead costs. It is more effective overhead cost control by focusing on processes or activities and focuses on relevant factors by assigning costs to any cost object that is of interest to management. Lastly, it allows better management of activities by helping managers identify the causes of costs and the activities driving them. The disadvantages of Activity-Based Costing are its cost to implement and maintain ABC requires management commitment and financial resources and its uncertainty with decisions remain and management must interpret ABC data with caution in making managerial decisions.…

    • 297 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Exercises For Session 7

    • 1057 Words
    • 9 Pages

    For the last four years, Stellar Stairs Co. has been charging overhead to products on the basis of…

    • 1057 Words
    • 9 Pages
    Satisfactory Essays
  • Good Essays

    Managerial Accounting

    • 779 Words
    • 3 Pages

    Activity-based costing involves two allocation stages and includes a multitude of cost drivers. The first stage known as ABC assigns costs to pools; which signify the activities of the costs to be incurred. During the second stage the cost pools are allocated to products or cost objects by utilizing cost drivers that measure the object’s use of that activity.…

    • 779 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Chaper 5 Study Guide

    • 11148 Words
    • 45 Pages

    If the usage of project activities is not proportional to the number of units produced, then some managers…

    • 11148 Words
    • 45 Pages
    Powerful Essays
  • Better Essays

    This case details a fictional denim processing plant providing the service of custom finishing to denim pants for original manufacturers. The case is a lesson in how interdependencies among products in the production process and the costs associated with those interdependencies can be cost analyzed for management decisions. The retooling of a finishing machine change-over production from an existing stonewash process to accomplish a proposed distressed finishing process for a new customer, is the cost interdependency studied. We explain how marginal costing and full cost activity-based costing (ABC) are used by the controller to present management product optimal (profit-maximizing) production decisions on the proposed contract.…

    • 1641 Words
    • 7 Pages
    Better Essays
  • Good Essays

    A. is the time it takes for policy to change spending. The principal lag for fiscal policy is the time it takes to implement…

    • 4506 Words
    • 19 Pages
    Good Essays
  • Satisfactory Essays

    Activity-Based Costing

    • 627 Words
    • 3 Pages

    Activity-Based Costing (ABC) is when you figure out the cost of activities to then discover the cost of products and services. ABC occurs in in four stages. These steps are as follows: identify activities and calculate their estimated total costs, identify the allocation base for each activity and estimate the total quantity of each allocation base, compute the predetermined overhead allocation rate for every activity, and allocate indirect costs to the cost object. I will use the production of a shirt to explain the process of ABC. Manufacturing a shirt requires three activities: setup, production, and shipping/packaging. In the setup stage, the machines are weaved with the proper thread, and oiled down, which allows the shirts to then be manufactured. After production, the shirts are packaged and shipped out. The estimated overhead cost for setup in the next year is $10,000 for setup, $25,000 for production, and $15,000 for packaging/shipping. In the next step, we give allocating bases to each. The allocation base for the setup stage is number of thread bobs used to produce 100 shirts, which is 10 thread bobs. The allocation base for production is the number of shirts that can be produced in an hour (500). The allocation base for…

    • 627 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    Global Electronics Inc.

    • 1429 Words
    • 6 Pages

    Question1. What pre existing conditions (or warning signs) existed within Global Electronics to warrant considering ABC as a possible solution? When these pre existing conditions exist, why does ABC offer a better solution than traditional cost systems? Analysis 1: GEI 's standard cost system assigned manufacturing overhead costs to products based on direct labour dollars. From 1994-1999, the predetermined…

    • 1429 Words
    • 6 Pages
    Powerful Essays
  • Good Essays

    In activity based costing (ABC), an activity cost driver is something that drives the cost of a particular activity. A factory, for example, may have running machinery as an activity. The activity cost driver associated with running the machinery could be machine operating hours, which would drive the costs of labor, maintenance and power consumption of running the machinery activity.…

    • 462 Words
    • 2 Pages
    Good Essays
  • Powerful Essays

    Activity based costing (ABC) assigns manufacturing overhead costs to products in a more logical manner than the traditional approach of simply allocating costs on the basis of machine hours. Activity based costing first assigns costs to the activities that are the real cause of the overhead. It then assigns the cost of those activities only to the products that are actually demanding the activities.…

    • 1474 Words
    • 6 Pages
    Powerful Essays
  • Satisfactory Essays

    Use the Internet or other credible resources to find an article relevant to activity-based costing (ABC), job costing, or process costing. Prepare a 125-word summary of the article. Briefly summarize the major topics of the article, and explain what you learned as a result of your reading. Be sure to properly cite the article in your summary and be prepared to present your summary to the entire class.…

    • 414 Words
    • 2 Pages
    Satisfactory Essays
  • Better Essays

    Abc Accounting

    • 2592 Words
    • 8 Pages

    The methodology of Activity Based Costing is based on the fact that a company to produce products or services need to perform activities which consume resources, so activities are funded first and then the cost of activities are assigned to different cost objects (products, services, customer groups and regions, processes, etc) consuming such activities, in such a way we achieve a much greater accuracy in determining the costs and the correlative profitability.…

    • 2592 Words
    • 8 Pages
    Better Essays
  • Powerful Essays

    This case focuses on decision-making benefits of activity-based costing relative to the traditional approach. It also offers an opportunity to discuss the cost/ benefit trade-off between simple ABC systems versus refined systems, and the potential benefit of using capacity rather than expected sales when allocating fixed overhead costs. (Related to Chapter 4, Activity-Based Costing.)…

    • 11463 Words
    • 46 Pages
    Powerful Essays