Preview

Surround Sound and Page Ref

Satisfactory Essays
Open Document
Open Document
552 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Surround Sound and Page Ref
Level 2 EWI competence criteria
Comply with all workplace health, safety and welfare legislation requirements: QCF 641
Communicate with others to establish productive work practices: QCF 642
Moving, handling and storing resources in the workplace: QCF 643

Installing External Wall Insulation In The Workplace: QCF448v2
QCF 448v2: 1.1
Page REF:IEI 7
Interpret and extract information from drawings, specifications, schedules, method statements, risk assessments and manufacturers’ information.

QCF 448v2: 1.2
Page REF:IEI 7
Comply with information and/ or instructions derived from risk assessments and method statements.

QCF 448v2: 3.1
Page REF:IEI 14a
Use personal protective equipment (PPE) and access equipment/ working platforms safely to carry out the activity in accordance with legislation and organisational requirements when installing external wall insulation.

QCF 448v2: 4.1
Page REF:IEI 18
Select resources associated with own work in relation to materials, components, fixing, tools and equipment.

QCF 448v2: 5.1
Page REF:IEI 24
Protect the work and its surrounding area from damage in accordance with safe working practices and organisational procedures.

QCF 448v2: 5.2
Page REF:IEI 24
Minimise damage and maintain a clean work space

QCF 448v2: 5.3
Page REF:IEI 24
Dispose of waste in accordance with legislation

QCF 448v2: 6.1
Page REF:IEI 27
Demonstrate completion of the work within the allocated time.

QCF 448v2: 7.1
Page REF:IEI 29
Demonstrate the following work skills when installing external wall insulation: measuring, marking out, fitting, filling, finishing, positioning and securing.

QCF 448v2: 7.2
Page REF:IEI 29
Prepare and install external wall insulation to given working instructions, relating to one of the following
:pre finished installation systems/methods
:non finished installation systems/methods

QCF 448v2:

You May Also Find These Documents Helpful

  • Satisfactory Essays

    GDP11 Unit10 Rep046 13 S

    • 303 Words
    • 2 Pages

    A home purchase is a major undertaking with a long list of items that must be investigated. To ensure that the building is structurally sound, many prospective buyers use the services of a building inspector. The walls, ceiling, and floors (if you have a basement) need proper insulation. “Both the depth and ‘R’ factor need to be checked for appropriate levels.”3 In addition, cross braces should have been used between the beams supporting a floor.…

    • 303 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Write a comprehensive job description for this position that will help you prepare for the interview process and address any questions you might receive from applicants. Be sure to apply the guidelines for writing job descriptions you learned in the textbook. You are also encouraged to conduct your own outside research on a major home improvement center or O*Net to help you complete this activity.…

    • 326 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Cabling design, standards

    • 382 Words
    • 2 Pages

    Assume that you are a Telecommunication Specialist and the Project Manager for a team that will design the cable plan for your company’s new building. You have determined that the team has a very weak understanding of Cable Specifications and Building Codes. To provide a comprehensive reference guide, you decide to create a detailed document that your team can refer to when creating the cable installation plan. This document will present a detailed view of building and cable specifications with special attention to the cable and building codes that will be applicable to your project.…

    • 382 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    This report contains the findings of a detailed review into the Health and Safety Management System (HSMS) within Pencro Structural Engineering Limited (PSEL). I would like to thank all those concerned for their help and cooperation.…

    • 13995 Words
    • 56 Pages
    Powerful Essays
  • Better Essays

    Albedo Lab

    • 2272 Words
    • 10 Pages

    1. All materials listed above must be gathered and placed on a sufficient working space.…

    • 2272 Words
    • 10 Pages
    Better Essays
  • Good Essays

    Use approved methods and procedures when undertaking potentially hazardous work activities, including using correct moving and handling techniques wearing correct personal protective clothing appropriate to the situation, environment and activities using and storing equipment and materials dealing with spillages and disposal of waste.…

    • 356 Words
    • 2 Pages
    Good Essays
  • Good Essays

    Shear Walls

    • 2396 Words
    • 10 Pages

    This section provides an introduction to shear walls and how they resist earthquake and wind forces. This section also shows how to properly construct the shear walls and the parts that make them up. With this knowledge, contractors can build proper shear walls and inspectors can recognize the errors untrained contractors make.…

    • 2396 Words
    • 10 Pages
    Good Essays
  • Good Essays

    During each IQ, equipment design, construction and materials of construction will be verified against engineering specifications, purchase requirements and GMP issues. The piece of equipment will be examined to confirm proper connection and installation of the supporting services and components relative to vendor specifications. The location of all appropriate support documentation (such as manufacturer's manuals, purchase orders, test results, spare parts lists, certificates) will be referenced. Manufacturer's tag data will be collected.…

    • 410 Words
    • 2 Pages
    Good Essays
  • Good Essays

    wooden speaker

    • 404 Words
    • 2 Pages

    3. Materials/Equipment - the exact technical specifications, quantities and source of method of preparation for all materials used should be given. Specifically, built equipment used in the…

    • 404 Words
    • 2 Pages
    Good Essays
  • Powerful Essays

    Shehani

    • 459 Words
    • 2 Pages

    This handbook is provided for students as a guide to prepare the assignment in order to maintain the required standards and procedures in line with EdExcel.UK standards. All students MUST prepare the assignments according to the given standard.…

    • 459 Words
    • 2 Pages
    Powerful Essays
  • Powerful Essays

    Masonry Wall

    • 836 Words
    • 4 Pages

    WALL  _____________________________________ _____________________________________  as external or internal functional requirements  to provide shelter against wind and rain  to divide buildings into rooms/ compartments…

    • 836 Words
    • 4 Pages
    Powerful Essays
  • Good Essays

    Elective Unit: Manage WSH Risks in Construction Industries Project Report This Report defines the works carried out by PT. McConnell Dowell Services in the fabrication of pipe modules in Batam Fabrication Facility. It covers the nature, hazards, controls and legislative compliance in ensuring the safe operations in the delivery of final products to satisfied clients.…

    • 5148 Words
    • 21 Pages
    Good Essays
  • Satisfactory Essays

    The following method statement has been developed to provide a safe system of work and must be adhered to at all times, any significant deviation from this system must first be authorised by SITE INCHARGE or SAFETY INCHARGE. Please read the entire sheet before beginning the procedure, if you have any questions please contact SITE INCHARGE or SAFETY INCHARGE…

    • 1033 Words
    • 7 Pages
    Satisfactory Essays
  • Satisfactory Essays

    K-12 Grade 7 Electrical Module

    • 25260 Words
    • 102 Pages

    Welcome to the world of Electrical Installation and Maintenance! This Module is an exploratory course which leads you to Electrical Installation and Maintenance National Certificate Level II ( NC II)1. It covers 5 common competencies that a Grade 7 / Grade 8 Technology and Livelihood Education (TLE) student like you ought to possess, namely: 1) 2) 3) 4) 5) Prepare electrical supplies, materials, and tools; Perform mensuration and calculations; Interpret technical drawings and plans; Maintain tools and equipment; and Practice occupational health and safety…

    • 25260 Words
    • 102 Pages
    Satisfactory Essays
  • Powerful Essays

    Osha

    • 2246 Words
    • 9 Pages

    To secure the safety, health and welfare of persons at work against risks to safety or health arising out of the activities of persons at work To protect persons at place of work other than persons at work against risks to safety or health arising out of the activities of persons at work To promote an occupational environment for persons at work which is adapted to their physiological and psychological needs…

    • 2246 Words
    • 9 Pages
    Powerful Essays