Preview

Imo Circular 736

Better Essays
Open Document
Open Document
1228 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Imo Circular 736
OIL RECORD BOOK INSTRUCTIONS
Oil Record Book, Part I - Machinery space operations (All Ships)
The following pages of this section show a comprehensive list of items of machinery space operations which are, when appropriate, to be recorded in the Oil Record Book Part I in accordance with regulation 17 of Annex I of the International Convention for the Prevention of Pollution from Ships, 1973, as modified by the Protocol of 1978 relating thereto (MARPOL 73/78). The items have been grouped into operational sections, each of which is denoted by a letter Code. When making entries in the Oil Record Book Part I, the date, operational Code and item number shall be inserted in the appropriate Columns and the required particulars shall be recorded chronologically in the blank spaces. Each completed operation shall be signed for and dated by the officer or officers in charge. The master of the Ship shall sign each completed page. The Oil Record Book Part I contains many references to oil quantity. The limited accuracy of tank Measurement devices, temperature variations and clingage will affect the accuracy of these readings. The entries in the Oil Record Book Part I should be considered accordingly. In the event of accidental or other exceptional discharge of oil statement shall be made in the Oil Record Book Part I of the circumstances of, and the reasons for, the discharge. Any failure of the oil filtering equipment shall be noted in the Oil Record Book Part I. The entries in the Oil Record Book Part I, for ships holding an IOPP Certificate, shall be in English. The Oil Record Book Part I shall be kept in such a place as to be readily available for inspection at all reasonable times and, except in the case of unmanned ships under tow, shall be kept on board the ship. It shall be preserved for a period of three years after the last entry has been made. The competent authority of the Government of a Party to the Convention may inspect the Oil Record Book Part I on board

You May Also Find These Documents Helpful

  • Good Essays

    ALC-CC M4 SOP

    • 308 Words
    • 2 Pages

    3. REFERENCES: Lubricate order (LO); Soldier Training Publication 21-1-Soldier Manual of Common Task; TM 9–1005–319–10; and DA Form 2404, Equipment Inspection and Maintenance Worksheet.…

    • 308 Words
    • 2 Pages
    Good Essays
  • Satisfactory Essays

    REFERENCES: Lubricate order (LO); STP 21–1–SMCT; TM 9–1005–319–10; and DA Form 2404, Equipment Inspection and Maintenance Worksheet.…

    • 376 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Processes in oil industries, fishing industries and the environmental agencies were pretentious by the oil dripping in unexpected ways. This report aims to…

    • 670 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Army ALC-CC SOP

    • 643 Words
    • 3 Pages

    3. REFERENCES: Lubricate order (LO); STP 21–1–SMCT; TM 9–1005–319–10; and DA Form 2404, Equipment Inspection and Maintenance Worksheet.…

    • 643 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Platoon SOP

    • 353 Words
    • 2 Pages

    • He provided you with the following doctrinal references: Lubricate order (LO); STP 21–1–SMCT; TM 9–1005–319–10; and DA Form 2404, Equipment Inspection and Maintenance Worksheet.…

    • 353 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Arms Room SOP

    • 265 Words
    • 2 Pages

    1. REFERENCES: Lubricate order (LO); STP 21–1–SMCT; TM 9–1005–319–10; and DA Form 2404, Equipment Inspection and Maintenance Worksheet.…

    • 265 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    The scope of this work instruction is to covers pigging operation for clearing the line contents of both Terminal dock line and DIA pipeline. Each individual involved in operation within the HEJP shall follow and understand the requirements determined in the work instruction.…

    • 167 Words
    • 1 Page
    Satisfactory Essays
  • Powerful Essays

    barrel of crude oil, 4 barrels of water must contaminated (Brecher). The extraction and refining…

    • 1635 Words
    • 7 Pages
    Powerful Essays
  • Satisfactory Essays

    Circle 9

    • 321 Words
    • 2 Pages

    Intellectual sins punishments are worse because they’re actually thought about verses the sins that land you in upper Hell, which are more ingrained into people so that it take a lot of self-control to keep from doing them.…

    • 321 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Enables the system to be used for analysis across the breadth of Naval Surface Units…

    • 1074 Words
    • 5 Pages
    Powerful Essays
  • Powerful Essays

    E190 Upgrade Guide Version 1

    • 9939 Words
    • 79 Pages

    E-190 Captain Upgrade Guide (Unofficial) Version 1 By Jovan O’Bryant EMBRAER 190 CAPTAIN UPGRADE STUDY GUIDE E-190 Captain Upgrade Guide (Unofficial) VERSION 1 This guide was created with the intent of being for reference only and in JetBlue’s official training material!…

    • 9939 Words
    • 79 Pages
    Powerful Essays
  • Good Essays

    The engine system of the vessel is simplified as shown in Figure 1 to illustrate the application.…

    • 1153 Words
    • 5 Pages
    Good Essays
  • Good Essays

    ashok leyland

    • 505 Words
    • 3 Pages

    The Ashok Leyland 4 & 6 cylinder marine engines with the AL and H series have been the first choice of customers, considering the necessity for the engine to operate trouble free and continually on the high seas for weeks on the go, without switching off the engine. These engines have been exported to various countries incorporating complete accessories, stern gear equipment, spare parts kit to operate continually on foreign waters.…

    • 505 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Suncor Communications Plan

    • 11966 Words
    • 48 Pages

    "FERC: Industries - Safety & Inspection." Federal Energy Regulatory Commission. Web. 27 Nov. 2011. <http://www.ferc.gov/industries/oil/safety.asp>.…

    • 11966 Words
    • 48 Pages
    Powerful Essays
  • Good Essays

    Monthly Report

    • 690 Words
    • 3 Pages

    Fuel oil bunkering procedure: before bunkering fuel oil, pre-bunkering briefing should be carried out within 48 hours before bunkering. The meeting is mainly to assign and confirm the duty of the ships’ personal. The fourth Engineer should prepare the paper work of bunkering. Four simple bottles should be prepared. The Mech should prepare the tools for bunkering, mainly including the spanners(30), gasket, clean rags, fuel hose crane, FO transfer procedure plates, foam extinguisher, saw dust, portable pneumatic pump and so on. Senior AB should plug all the scuppers before bunkering. Duty officer or a person designated by him to hoist B flag during daytime and Red light during nighttime. 4/E should test and make sure in good working order of the overflow alarm in the F.O. transferring system. And 4/E takes charge of valve operation, and make sure that the valves in the FO transfer system are in the right position (open or closed) just before bunkering. Duty deck officer need to supervise bunker barge alongside own vessel and Mech should take charge of mooring of bunker barge to own vessel. Bosun need to prepare the Gangway or pilot ladder for the bunker barge access to own vessel. 4/E to make a full sounding record of all fuel oil tanks prior to bunkering operation, and record bunker barge tanks’ sounding in accompany with barge representative before starting bunkering. C/E should have conference with bunker barge to ascertain the followings:…

    • 690 Words
    • 3 Pages
    Good Essays

Related Topics